   stage ii works 的翻译结果: 查询用时:0.007秒
图标索引 在分类学科中查询
所有学科
水利水电工程
更多类别查询

图标索引 历史查询
 

stage ii works
相关语句
  二期工程
     Excavation along erection bay III for Stage II works of left powerhouse for TGP
     三峡水利枢纽左岸电站厂房二期工程安Ⅲ一线开挖
短句来源
     Large amount of testing work of mechanical jointing technology of reinforcing bars and correspondent management measures were carried out in TGP Stage II works,up to Stage III works,a complete quality control program,quality check standard,quality control system and supervision measures had been set up.
     三峡二期工程在钢筋机械连接技术方面做了大量的试验工作并进行了相应管理方法的探索,至三峡三期工程已建立了一套完整的质量控制程序、质量检验标准、质量管理制度和监理办法。
短句来源
     TGP temporary shiplock is located between the No. 8 and No. 9 monoliths of left bank non-overflow dam section and undertakes temporary navigation task during Stage II works construction of TGP.
     三峡工程临时船闸位于左岸非溢流坝8、9号坝段之间,在三峡二期工程施工期间承担临时通航任务。
短句来源
     After completion of Stage II works,the navigation channel of the temporary shiplock was blocked to construct No. 2 monoliths of the temporary shiplock and flushing sluice,and placing No. 1 and No.
     二期工程完成后,将临时船闸通航航道封堵,修建临时船闸2号坝段,设置冲沙闸,并将临时船闸1、3号坝段自高程143 m浇至坝顶185.0 m。
短句来源
  相似匹配句对
     116 at stage II;
     II期116髋;
短句来源
     (ii)(?)
     (ii)(?)
短句来源
     The Stage
     舞台上下
短句来源
     II.
     II.
短句来源
     stage II, 71% ;
     II期71% ;
短句来源
查询“stage ii works”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


On the base of summing up experience of TGP Stage II works and in the combination of supervision characteristics of TGP Stage III works,the Three Gorges Project Construction Supervision Department of Changjiang Water Resources Commission worked out and perfected a series of supervision and management rules and regulations,improved and tightened up the internal management of supervision,drafted new measures and made innovations in process control,raised up control level,made all-round...

On the base of summing up experience of TGP Stage II works and in the combination of supervision characteristics of TGP Stage III works,the Three Gorges Project Construction Supervision Department of Changjiang Water Resources Commission worked out and perfected a series of supervision and management rules and regulations,improved and tightened up the internal management of supervision,drafted new measures and made innovations in process control,raised up control level,made all-round and high-quality realization of contracted supervision objectives and created first-class construction quality,in which,the achievement in concrete temperature control measures and practical effect meet or overpass the highest level of hydropower industry at home and abroad,realizing crack-free concrete construction.The Three Gorges Project Construction Supervision Department of Changjiang Water Resources Commission has done a remarkable job in TGP supervision work,and simultaneously improved themselves in the project construction.

长江水利委员会三峡工程建设监理部在总结三峡二期工程建设经验的基础上,结合承监的三峡三期工程的特点,制定和完善了一系列监理管理规章制度,改进和加强监理的内部管理;制定了一系列的过程控制新措施,创新了过程控制,提高了控制水平,使承监的三期工程项目全面的、优质的实现了合同目标,工程质量达到了一流水平。其中混凝土温控措施和取得的成效达到或超过国际、国内水电行业最高水平。创造混凝土施工无裂缝的奇迹。长江委三峡工程建设监理部在出色地完成了承监的三峡工程监理任务的同时,也在工程建设中千锤百炼的成长、成熟和提高。

The application of mechanical jointing technology of reinforcing bars in engineering circle is famed as a revolution of reinforcing bar connection.Large amount of testing work of mechanical jointing technology of reinforcing bars and correspondent management measures were carried out in TGP Stage II works,up to Stage III works,a complete quality control program,quality check standard,quality control system and supervision measures had been set up.In the construction of Stage-3 of...

The application of mechanical jointing technology of reinforcing bars in engineering circle is famed as a revolution of reinforcing bar connection.Large amount of testing work of mechanical jointing technology of reinforcing bars and correspondent management measures were carried out in TGP Stage II works,up to Stage III works,a complete quality control program,quality check standard,quality control system and supervision measures had been set up.In the construction of Stage-3 of TGP,the technological advantage of mechanical jointing of reinforcing bars was brought into full play and good control result was obtained,giving demonstration and promotion effect for the application of mechanical jointing technology for reinforcing bars connection in water conservancy and hydropower project.

钢筋机械连接技术在工程领域应用被誉为钢筋连接技术的一场革命。三峡二期工程在钢筋机械连接技术方面做了大量的试验工作并进行了相应管理方法的探索,至三峡三期工程已建立了一套完整的质量控制程序、质量检验标准、质量管理制度和监理办法。在三峡三期工程的建设中,充分地发挥了钢筋机械连接的技术优势,取得了良好的控制效果,为钢筋机械连接技术在水利水电工程中的运用,起到了示范和推动作用。

TGP temporary shiplock is located between the No.8 and No.9 monoliths of left bank non-overflow dam section and undertakes temporary navigation task during Stage II works construction of TGP.No.1 and No.3 monoliths of the temporary shiplock was constructed in advance and in two stages to El.143 m before the temporary shiplock operation.After completion of Stage II works,the navigation channel of the temporary shiplock was blocked to construct No.2 monoliths of the temporary shiplock and flushing...

TGP temporary shiplock is located between the No.8 and No.9 monoliths of left bank non-overflow dam section and undertakes temporary navigation task during Stage II works construction of TGP.No.1 and No.3 monoliths of the temporary shiplock was constructed in advance and in two stages to El.143 m before the temporary shiplock operation.After completion of Stage II works,the navigation channel of the temporary shiplock was blocked to construct No.2 monoliths of the temporary shiplock and flushing sluice,and placing No.1 and No.3 monoliths from El.143 m to dam top elevation of 185.0 m.Through checking for water stop between transversal joints of the temporary shiplock,it was discovered that the water leakage volume of 4 water drainage troughs exceeds standard and there exists outward-leakage of upstream joint face.According to design requirement,chemical grouting treatment should be carried out for unqualified transversal joints.This paper presents water pressure check,leakage treatment and construction scheme.

三峡工程临时船闸位于左岸非溢流坝8、9号坝段之间,在三峡二期工程施工期间承担临时通航任务。临时船闸13、号坝段先修建并分两期施工,初期在临时船闸通航前浇筑至高程143 m。二期工程完成后,将临时船闸通航航道封堵,修建临时船闸2号坝段,设置冲沙闸,并将临时船闸1、3号坝段自高程143 m浇至坝顶185.0 m。通过对三峡工程临时船闸坝体横缝止水检查,发现有4条排水槽压水串漏量超标及上游缝面存在外漏,根据设计要求,需要对检查不合格的横缝进行化学灌浆处理。对压水检查、渗漏处理方案决策及处理施工进行了阐述。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关stage ii works的内容
在知识搜索中查有关stage ii works的内容
在数字搜索中查有关stage ii works的内容
在概念知识元中查有关stage ii works的内容
在学术趋势中查有关stage ii works的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社