助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   monitor and measure 在 建筑科学与工程 分类中 的翻译结果: 查询用时:0.081秒
图标索引 在分类学科中查询
所有学科
建筑科学与工程
公路与水路运输
电力工业
生物学
环境科学与资源利用
更多类别查询

图标索引 历史查询
 

很抱歉,暂未找到该词条在当前类别下的译词。
您可以查看在所有学科的译词。
相关语句
查询“monitor and measure”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  monitor and measure
Then we will use a special on-chip saw-tooth oscillator to monitor and measure currents down to a few fempto-amps.
      
As CO2 is the respiration product from aerobic degradation which can be correlated to the organic pollution extent, the previous biosensor was modified to monitor and measure the online toxicity and BOD/COD.
      
On the other hand, saltatory movements are easy to monitor and measure fairly accurately, but their range may be shorter than the actual microtubule length because of a limited processiveness of motors (kinesin and dynein).
      
We monitor and measure a wide variety of values daily to ensure that levels remain within requirements.
      
Work is under way to gather baseline data to adequately monitor and measure progress on outcome indicators.
      
更多          


During the construction of larae volume concrete for the foundation of boilers in Daqing 200 MW thermal power plant, by strictly following the codes for arraopmet of mould plates, for mixing,transportation, tamping and curing of conrete, and by taking the technological measures such as monitoring and measuring the heat of hydration at fixed ponts and times, the cracks would possibly occur after casting of large volume concrete were effectively controlled.

在大庆200MW火电厂锅炉等设备基础的大体积混凝土施工过程中,通过严格执行模板设置、混凝土的搅拌、输送、振捣、养护等工艺规范,采取定时定位监测凝结水化热的温度等工艺措施,有效地控制了大体积混凝土浇筑后可能产生的裂纹。

Prestressed large span frame structure of high strength concrete was monitored and measured during the construction.The force and deformation of the structure were analysed.The method of controlling the deformation and crack of structure is discussed and some suggestions are made.The conclusions can be as the references for engineering design and construction.

对高强混凝土预应力大跨框架结构进行了施工阶段的工程监测 ,分析了其受力、变形等情况 ,探讨了结构变形、裂缝的控制方法 ,希望对工程设计与施工有所裨益

The foundation of cooling pool of No.1 dust extractor in Tieling Power Plant was demolished by blasting in a modification engineering. The safety technology of controlled blasting under the conditions that the plinth foundation is 300mm far from a workshop and 400mm lower than the foundation of workshop is investigated. Meanwhile the blasting seismic effect in the blast district is monitored and measured.

通过铁岭发电厂一号电除尘器改造工程降温池等基础控制爆破拆除 ,探讨了紧邻厂房柱基 30 0mm ,且待拆基础低于厂房柱基底部 0 .4m条件下的控制爆破安全技术 ;同时 ,对爆区进行了爆破地震效应监测。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关monitor and measure的内容
在知识搜索中查有关monitor and measure的内容
在数字搜索中查有关monitor and measure的内容
在概念知识元中查有关monitor and measure的内容
在学术趋势中查有关monitor and measure的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社