助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   optimal real power flow 的翻译结果: 查询用时:0.196秒
图标索引 在分类学科中查询
所有学科
电力工业
更多类别查询

图标索引 历史查询
 

optimal real power flow
相关语句
  有功优化潮流
     OPTIMAL REAL POWER FLOW IN WIND POWER INTEGRATED SYSTEM
     含风电场电力系统的有功优化潮流
短句来源
     To overcome the difficulty in solving CCP problem, a genetic algorithm based on stochastic simulation technique is applied to calculate the wind power penetration limit and optimal real power flow.
     为了克服机会约束规划问题求解的困难,本文设计了基于随机模拟技术的遗传算法,计算风电穿透功率极限和风电并网系统的有功优化潮流
短句来源
     The optimal real power flow is computed on the basis of the quasi-gradient vector by means of gradient method, conjugate gradient method and DPF method.
     并用算例用基于准梯度向量的准梯度法、准共轭梯度法和变尺度法求解有功优化潮流
短句来源
  “optimal real power flow”译为未确定词的双语例句
     AN IMPROVED ALGORITHM OF OPTIMAL REAL POWER FLOW IN POWER SYSTEMS
     电力系统有功优化潮流的一种改进算法
短句来源
     OPTIMAL REAL POWER FLOW FOR POWER SYSTEM VIA EQUIVALENT QUADRATIC PROGRAMMING ALGORITHM
     电力系统有功优化潮流算法研究——等效二次规划法
短句来源
     Optimal real power flow via equivalent QP algorithm have been tested corresponding to 5 bus, 13 bus, IEEE-5 bus, IEEE-30 bus and Luoding power system(in Guangdong province, P.R.C.) respectively, on the microcomputer.
     本文用等效二次规划算法对5节点、13节点、IEEE 5节点、IEEE 30节点和广东某电力系统进行了计算。
短句来源
  相似匹配句对
     To be and to be real
     实在与真实
短句来源
     Optimal Decision on Evaluation of Real Estate Value
     地皮价格评价中的最优决策
短句来源
     The optimal model for real estate development system
     房地产开发系统的一种优化模型
短句来源
     Real Time on Line Optimal Power Flow
     实时在线最优潮流
短句来源
     REAL-TIME OPTIMAL CONTROL OF VOLTAGE AND REACTIVE POWER
     实时电压无功优化控制
短句来源
查询“optimal real power flow”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


This paper presents an improved algorithm for optimal real power flow, which is based on the fact that the operation cost of power system is determined mainly by generation output. The objective function is the generation cost of whole power system. The constraints are bus power balance real power limits of generators and line real power limits. The gradient vector formula of augmentation objective function including generation cost and penalty function under the...

This paper presents an improved algorithm for optimal real power flow, which is based on the fact that the operation cost of power system is determined mainly by generation output. The objective function is the generation cost of whole power system. The constraints are bus power balance real power limits of generators and line real power limits. The gradient vector formula of augmentation objective function including generation cost and penalty function under the equality constraints is derived. After simplifying the gradient vector formula thc quasi-gradient vector formula is inferred according to the feature of power systems. The optimal real power flow is computed on the basis of the quasi-gradient vector by means of gradient method, conjugate gradient method and DPF method. Test resulus of three test systems (11 bus, 44 bus and 118 bus IEEE system) are presented, which show the new algorithm can not only satisfy the security constraints but also minimize generation cost. It can be employed in on-line optimal control and also in off-line computation for power system operation.

本文根据电力系统运行成本主要决定于发电机有功出力这个性质,提出了一个以全网发电成本为目标函数,节点功率平衡方程、发电机有功出力限值和支路有功限值为约束的新的优化潮流数学模型。推导出发电总成本加上惩罚项的增广目标函数等式约束下的梯度向量公式。并根据电力系统的特点对该公式进行了简化,得到准梯度向量公式。并用算例用基于准梯度向量的准梯度法、准共轭梯度法和变尺度法求解有功优化潮流。结果表明,该数学模型确实体现了影响成本的主要因素,能够得到既满足安全条件又使成本接近最小的优化潮流。对梯度向量公式的简化是合理的。三种解决都适合本数学模型。用此法求解有功优化潮流可用于在线最优控制,也适用于离线计算。

A novel algorithm for optimal real power flow is developed in this paper, which is based on the fact that the objective function is the generation cost of whole power system, simultaneously, the constraints are real power limits of generators, branch real power limits and real power balance. By virtue of the convex condition of cost function in quadratic programming(QP)model, the QP model with function constraints is trans formed into an equivalent QP model with...

A novel algorithm for optimal real power flow is developed in this paper, which is based on the fact that the objective function is the generation cost of whole power system, simultaneously, the constraints are real power limits of generators, branch real power limits and real power balance. By virtue of the convex condition of cost function in quadratic programming(QP)model, the QP model with function constraints is trans formed into an equivalent QP model with only variable constraints. Optimal real power flow via equivalent QP algorithm have been tested corresponding to 5 bus, 13 bus, IEEE-5 bus, IEEE-30 bus and Luoding power system(in Guangdong province, P.R.C.)respectively, on the microcomputer. For optimal real power flow, the testing results indicate that the equivalent QP algorithm has good convergency, fast speed and higer precision. It has great potentialities to apply in the on-line computation.

本文基于全网发电成本为目标、满足节点有功平衡方程、发电厂(机)有功出力和支路有功限值为约束的有功优化潮流数学模型,提出了利用二次规划的凸性条件,使其转化成只有变量约束的等效二次规划模型。本文用等效二次规划算法对5节点、13节点、IEEE 5节点、IEEE 30节点和广东某电力系统进行了计算。结果表明,用等效二次规划算法求解有功优化潮流具有收敛性好、快速及较高的精度,具有应用于在线的潜力。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关optimal real power flow的内容
在知识搜索中查有关optimal real power flow的内容
在数字搜索中查有关optimal real power flow的内容
在概念知识元中查有关optimal real power flow的内容
在学术趋势中查有关optimal real power flow的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社