助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   pressure consolidation 的翻译结果: 查询用时:0.008秒
图标索引 在分类学科中查询
所有学科
工业通用技术及设备
无机化工
有机化工
更多类别查询

图标索引 历史查询
 

pressure consolidation
相关语句
  压密
     Taking operational process into hydraulic pressure cake filtration phase and hydraulic pressure consolidation phase on the frame or chamber filter press with fixed volume are studied on this paper.
     将滤室固定不变的板框或箱式压滤机的操作过程分成滤饼过滤阶段和液力压密脱水阶段两个过程来研究。
短句来源
     Whereas on the hydraulic pressure consolidation phase,Darcy's law is used to establish basic differential equation of hydraulic pressure consolidation,by applying cake coefficient of permeability and porosity is in linearity relation in the a certain extent,The restrict qualification of fixed volume filter cell and material balance condition,the hydraulic pressure consolidation dewatering equation is ultimately deduced.
     在液力压密脱水阶段 ,应用达西定律建立了液力压密基本微分方程 ,根据研究得出滤饼渗透系数与孔隙率在压密脱水阶段的线性取代关系的结论 ; 滤室固定的限制条件和物料平衡条件 ,推导出液力压密的脱水方程式。
短句来源
     The influence of operating parameters on hydraulic pressure consolidation dewatering time factor and hydraulic pressure consolidation velocity are analyzed.
     分析了影响液力压密脱水的时间因素和液力压密速率的各操作参数。
短句来源
     Taking operation al process into hydraulic pressure cake filtration phase and hydraulic pressure consolidation phase on the frame or chamber filter press with fixed volume are studied on this paper.
     将滤室固定不变的板框或箱式压滤机的操作过程分成滤饼过滤阶段和液力压密脱水阶段两个过程来研究。
短句来源
     Whereas on the hydraulic pressure consolidation phase,Darcy's law is u sed to establish basic differential equation of hydraulic pressure consolidation,by applying cake coefficient of permeability and porosity is in linearity relation in the a certain extent,The restrict qualification of fixed volume filter cell and material balance condition,the hydraulic pressure consolidation dewatering equation is ultimately deduced.
     在液力压密脱水阶段 ,应用达西定律建立了液力压密基本微分方程 ,根据研究得出滤饼渗透系数与孔隙率在压密脱水阶段的线性取代关系的结论 ; 滤室固定的限制条件和物料平衡条件 ,推导出液力压密的脱水方程式。
短句来源
  “pressure consolidation”译为未确定词的双语例句
     Microstructures of hypereutectic Al-Ge alloy contained a lot of primary α(Al) and eutectic (α+β) under high pressure consolidation,which shows under high pressure eutectic point in the phase diagram of Al-Ge alloy moves to the Ge direction.
     常压条件下由块状的初生 β(Ge)和层片共晶组织 (α + β)组成的过共晶合金在高压凝固时出现大量的初生α(Al)相 ,表明高压条件下凝固时Al Ge合金共晶点明显右移 (Ge方向 ) ;
短句来源
     Ultra-high pressure consolidation of atomized Al-Ni-Y alloy powders and investigation on densification mechanism
     Al-Ni-Y合金雾化粉末的超高压固结成形及其机理研究
短句来源
     Amorphous and nanocrystalline Al_(82)Ni_(10)Y_8 alloy powders were prepared via close-coupled inert gas atomization and then densified under ultrahigh pressure consolidation.
     采用紧耦合惰性气体雾化技术制备Al82Ni10Y8非晶和纳米晶粉末,并利用超高压固结成形技术对雾化粉末进行致密化。
短句来源
     Application of High pressure Grouting Rammer in High pressure Consolidation Grouting in Tianhuangping
     高压灌浆塞在天荒坪高压固结灌浆中的应用
短句来源
     This paper recounts that in Zhouning Hydropower Station high pressure shaft design steel liner has been eliminated and reinforced concrete permeable lining has been used instead. The paper also presents the high pressure consolidation grouting,the shaft pressure pipe line construction & the pipe line filling water test results.
     针对周宁水电站高压力竖井取消钢衬采用钢筋混凝土衬砌,介绍了取消钢衬的设计、钢筋混凝土透水衬砌设计、高压固结灌浆和竖井压力管道的施工,以及充水试验的结果。
短句来源
更多       
  相似匹配句对
     pressure;
     压力;
短句来源
     Influence of Consolidation Pressure to Characters of Soil
     固结压力对土体性质的影响
短句来源
     Numerical Solutions for Pre-consolidation Pressure
     先期固结压力的数值计算法
短句来源
     Consolidation and Innovation
     守成与创新——武夷剧作社2006年学术年会纪要
短句来源
     At the pressure >1*!
     当气压高于 1Pa时 ,得到厚度很小的ZnS薄膜 ;
短句来源
查询“pressure consolidation”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  pressure consolidation
Effect of cyclic pressure consolidation on the uniformity of metal matrix composites
      
High pressure consolidation of B6O-diamond mixtures
      
Amorphous alloy compacts prepared by high hydrostatic pressure consolidation showed lower compressive strength.
      
Amorphous alloy compacts prepared by high hydrostatic pressure consolidation showed lower compressive strength.
      
The optical transmittance - temperature spectra of well-translucent thin pellets of hydroxyapatite prepared by the high isostatic pressure consolidation of xerogel particles were measured by a newly-developed thermal analysis technique.
      
更多          


The exploitation of ground water in Ningbo City is of exploiting type, and therefore, the surface subsidence is initially associated with exploitation quantity of groundwater in time space and degree. The deformations of different soil layers have different features since the water-releasing conditions and physieo-mechanical properties of the soil layers are different. Different stratum associations lead to the difference of various surface subsidence regions. The surface subsidence in Ningbo City is mainly...

The exploitation of ground water in Ningbo City is of exploiting type, and therefore, the surface subsidence is initially associated with exploitation quantity of groundwater in time space and degree. The deformations of different soil layers have different features since the water-releasing conditions and physieo-mechanical properties of the soil layers are different. Different stratum associations lead to the difference of various surface subsidence regions. The surface subsidence in Ningbo City is mainly caused by the water release and consolidation of clay beds. According to stress-strain analysis, the authors make a'pressure consolidation line' expressing the pressure increase rate when the soil Iayer is preconsolidated and the pore water pressure decrease trend when the soil layer is remarkably compressed. If the water level of aquifer changes at present around -25m, then the deformation of soil layers will mainly be elastic and the surface subsidence will not be striking, in this regard, the authors advance -25-0.427n(m) as the permissive ground water level for controling the surface subsidence in Ningbo City (where,n stands for year number from 1986 on). A calculation on water level-ground water exploitation quantity relation proves that the monthly safe exploitation quantity of ground water is 100+3.133n×104~m~8.

宁波市地下水为消耗型开采,在时间、空间和程度上,地面沉降与地下水开采量有极密切的关系。由于各土层所处的释水条件及物理力学性质的差异,土层变形各具特点;地层组合关系的不同,地面沉降存在分区性。宁波地面沉降主要由粘土释水固结所致。根据土层应力——应变关系分析,提出了“预压固结线”,该曲线表示宁波土层预固结压力增加速率及土层显著压缩的孔隙水压力逐渐下降的趋势。目前,当含水层水位在-25米范围内升降,土层以弹性变形为主,地面不产生显著沉降。因此,-25-0.427n米(n为某年距1986年的年数)作为今后宁波控制地面沉降的地下水元许水位值。据水位——水量相关计算,每年6—9月为地下水高峰开采期,地下水月安全开采量为100+3.133n万米~3。

The complete high pressure consolidation grouting was carried out in dam section of riverbed of Tongjiezi project under, complicated geological conditions. Upgoing movement of dam foundation concrete and deterioration of geological conditions of rock were prevented because of stringent control of grouting pressure and cement grout injection where consolidation grouting of 3Mpa were carried out. The supersonic wave value and the dynamic modulus of elasticity are increased by high pressure...

The complete high pressure consolidation grouting was carried out in dam section of riverbed of Tongjiezi project under, complicated geological conditions. Upgoing movement of dam foundation concrete and deterioration of geological conditions of rock were prevented because of stringent control of grouting pressure and cement grout injection where consolidation grouting of 3Mpa were carried out. The supersonic wave value and the dynamic modulus of elasticity are increased by high pressure consolidation grouting. It plays a important role in consolidation of dam foundation and improvement of dam foundation stability against sliding.

铜街子水电站在复杂的地质条件下,对河床坝段进行了全面高压固结灌浆。本文介绍了用3MPa固结灌浆施工时,对灌浆压力与浆液注入率的严格控制,有效地防止了坝基砼抬动和地质条件的恶化。高压固结灌浆结果达到了提高坝基岩石超声波值和动弹模量的目的;对加固坝基,改善坝基抗滑稳定能力起到了很大的作用.

The geological condition of Power Tunnel 1 of the Tianshengqiao- Ⅱ Hydropowor Station was un- favourable and the construction conditions were difficult. The use of high pressure consolidation grouting in this project has made the high construction speed possible. Since then the consolidation grouting under high pressure were widely used in tunnel work in Chine.

天生桥二级水电站1号引水隧洞不良地质段,施工条件十分困难。所采用的高压固结灌浆工艺在立足国内技术的基础上,实现了高速度施工。从而开创了我国隧洞高压固浆灌浆的先例,对其它类似工程的施工有普遍意义。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关pressure consolidation的内容
在知识搜索中查有关pressure consolidation的内容
在数字搜索中查有关pressure consolidation的内容
在概念知识元中查有关pressure consolidation的内容
在学术趋势中查有关pressure consolidation的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社