助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   project change 在 水利水电工程 分类中 的翻译结果: 查询用时:0.7秒
图标索引 在分类学科中查询
所有学科
水利水电工程
建筑科学与工程
宏观经济管理与可持续发展
投资
工业经济
公路与水路运输
交通运输经济
计算机软件及计算机应用
更多类别查询

图标索引 历史查询
 

project change    
相关语句
  工程变更
    The project changes' contraction management in Shuiyu reservoir's danger removing and strengthening work is introduced. The method and principle of cost adjustment after project change are elaborated as well as the content and method of contract management for project change, which has a certain reference value to similar work.
    介绍了水峪水库除险加固工程变更的合同管理 ,阐述了工程变更后价款调整的程序及调整原则 ,提出工程变更合同管理的内容和方法 ,对同类工程有参考价值
短句来源
  工程变更
    The project changes' contraction management in Shuiyu reservoir's danger removing and strengthening work is introduced. The method and principle of cost adjustment after project change are elaborated as well as the content and method of contract management for project change, which has a certain reference value to similar work.
    介绍了水峪水库除险加固工程变更的合同管理 ,阐述了工程变更后价款调整的程序及调整原则 ,提出工程变更合同管理的内容和方法 ,对同类工程有参考价值
短句来源
  工程变更
    The project changes' contraction management in Shuiyu reservoir's danger removing and strengthening work is introduced. The method and principle of cost adjustment after project change are elaborated as well as the content and method of contract management for project change, which has a certain reference value to similar work.
    介绍了水峪水库除险加固工程变更的合同管理 ,阐述了工程变更后价款调整的程序及调整原则 ,提出工程变更合同管理的内容和方法 ,对同类工程有参考价值
短句来源
  工程变更的
    The project changes' contraction management in Shuiyu reservoir's danger removing and strengthening work is introduced. The method and principle of cost adjustment after project change are elaborated as well as the content and method of contract management for project change, which has a certain reference value to similar work.
    介绍了水峪水库除险加固工程变更的合同管理 ,阐述了工程变更后价款调整的程序及调整原则 ,提出工程变更合同管理的内容和方法 ,对同类工程有参考价值
短句来源
查询“project change”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  project change
The degree of project change varies per project but is frequently significant.
      
The aim is to contribute towards a theory of model-based project change.
      
The court held the expert liable inspite of the project change from sale to credit.
      
Since the project can only operate seasonally, the economics of the project change dramatically.
      
Identified and evaluated a range of CSO control alternatives and prepared notice of project change documents.
      
更多          


This article makes a qualitative analysis on the water price issue in the project of water-transfer between regions according to the cost division of the whole-cost pricing method, drawing an analogy between this issue and the "bubble method" in pollution-discharge management, and gives a general framework for economic analysis in detailed research The analysis proves that the water-transfer has a full-scale impact on each part of the two regions water resource cost If the quantity of the water-transfer...

This article makes a qualitative analysis on the water price issue in the project of water-transfer between regions according to the cost division of the whole-cost pricing method, drawing an analogy between this issue and the "bubble method" in pollution-discharge management, and gives a general framework for economic analysis in detailed research The analysis proves that the water-transfer has a full-scale impact on each part of the two regions water resource cost If the quantity of the water-transfer is appropriate, the water resource costs of the two regions would be more close each other, and the whole cost is decreased and very similar to the change of the cost of pollution control resulting from the trade of pollution-discharge rights The water resource connection between the two regions by the water-transfer project changes the water cost division The surplus water in the region that exports the water now has opportunity costs, because it can be traded to other region and the water-transfer leads a water supply pattern adapting to the water demand in the two regions, the turnover rate of water will be increased and the water cost will be decreased The time factor demonstrates its importance here The analysis indicates that when the potential property rights of water resource become full ones that can be traded because of the project of water-transfer between regions, the efficiency of water resource deployment will be improved, which is consistent with the Coase theorem The income of the region of inputting water in short-run is different with that in long run

就跨区域调水引起的水价问题按照全成本定价的划分项目进行定性分析,通过将跨区域调水和排污权交易中的泡泡法进行类比,为详细考察提供了一个经济分析方面具有一般性的框架。分析表明,跨区域调水对相关区域的每项水资源成本都发生影响,在合适的调水量之下,两地水资源成本互相趋近而总成本减少,与排污权交易导致的污染治理成本变化类似。跨地区调水建立的地区水资源联系打破了原来水资源成本项目的划分,使调出区原来过剩的水因为存在与调入区交易的可能而产生机会成本,并因调水后水供给与两地水需求更一致而提高了水资源的周转率,等同于增加了可用水资源量并因此降低了水成本。在此显示了水资源价值中时间因素的影响。分析证明水资源潜在的产权因为跨地区调水工程而变成可交易更完整的产权之后,提高了水资源配置效率,这与科斯定理完全一致。调入区的获益在短期和长期内有所不同。

South-North water diversion midline project whether one step basin , step province and city super -huge to suit well water project. In December of 2002, the State Council will give a written reply 《Overall Planning of South - North Water Diversion》, South - North water diversion midline project change over to from planning stage to implement stage , define 9500 million m3 average year. The midline first stage project transfer water scale . In order to guarantee to realize the 2010 coherent water...

South-North water diversion midline project whether one step basin , step province and city super -huge to suit well water project. In December of 2002, the State Council will give a written reply 《Overall Planning of South - North Water Diversion》, South - North water diversion midline project change over to from planning stage to implement stage , define 9500 million m3 average year. The midline first stage project transfer water scale . In order to guarantee to realize the 2010 coherent water goal for Beijing, Tianjin of the first stage of midline the project of South - North water diversion that the State Council puts forward, Ministry of Water Resources 2003 working conference of the earlier stage confirm the focal point of work and event, and go into operation within the year of 2003. Section classifies as one of the first batch of on-stream items to the north of Hebei Shijiazhuang . Project after building up, can adopt for Beijing other way meet an urgent need and transfer water create the terms before 2008.

南水北调中线工程是一项跨流域、跨省市的特大型调水工程。2002年12月,国务院批复《南水北调总体规划》,南水北调中线工程由规划阶段转入了实施阶段,明确中线一期工程年均调水规模为95亿m3。为保证实现国务院提出的南水北调中线一期工程2010年通水至京、津的目标,水利部2003年南水北调工程前期工作会议确定了中线一期工程2003年的前期工作重点和年内开工的项目,河北省石家庄市以北段列为首批开工项目之一。工程建成后,可以为北京市在2008年以前采取其他途径应急调水创造条件。介绍了南水北调中线河北省北段工程设计概况。

The project changes' contraction management in Shuiyu reservoir's danger removing and strengthening work is introduced. The method and principle of cost adjustment after project change are elaborated as well as the content and method of contract management for project change, which has a certain reference value to similar work.

介绍了水峪水库除险加固工程变更的合同管理 ,阐述了工程变更后价款调整的程序及调整原则 ,提出工程变更合同管理的内容和方法 ,对同类工程有参考价值

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关project change的内容
在知识搜索中查有关project change的内容
在数字搜索中查有关project change的内容
在概念知识元中查有关project change的内容
在学术趋势中查有关project change的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社