助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   second track 的翻译结果: 查询用时:0.008秒
图标索引 在分类学科中查询
所有学科
经济体制改革
铁路运输
建筑科学与工程
更多类别查询

图标索引 历史查询
 

second track
相关语句
  第二轨道
     Research on the Strategy of Promoting Soft Strength by Use of the Second Track
     利用第二轨道提升软实力策略研究
短句来源
     ARF also carries out the diplomaticactivities in the second track in order to foster mutual trust and lay a good foundation in dealing with some sensitive problems.
     积极开展“第二轨道”外交,以期培养信任,处理敏感问题。
短句来源
     That unofficial, unprofitable and professional characteristics build the authority of the second track is a strategic choice.
     非官方性、非赢利性和专业性的特点塑造了第二轨道的权威,利用第二轨道提升中国的软实力是一个策略选择。
短句来源
  二线
     Added-Building a Second Track Maximum Slope's Selecting of Lanwu Route in Lanxin Railway
     兰新线兰武段增建二线最大坡度的选择
短句来源
     The construction norms for controlled blasting of cutting stonework for the second track added to existing railway electric line is always one of the concerns in recent years of the departments of engineering cost management, engineering design and construction.
     既有电气化铁路增建二线路堑石方控制爆破施工补充定额,近年来一直是工程造价管理、设计及施工部门普遍关心的问题。
短句来源
     The author, based on the controlled blasting of stonework for Mei Hua Shan Station of Liu Pan Shui Hub introduced into Neijiang - Kunming railway project of which he participated in the construction, makes an analysis mainly on the controlled blasting method, construction organization and additional norms for the cutting stone work of the second track to the existing railway electric line.
     笔者就参与施工的内昆铁路引入六盘水枢纽梅花山站石方控制爆破工程为例,重点对既有电气化铁路增建二线路堑石方控制爆破施工方法、施工组织、补充定额进行分析。
短句来源
     Based on the actual field conditions of rock cut widening at high side slope of the second track to existing electric railways , the paper presents a construction scheme with controlled blast and protection combined, which yielded comparatively good results and ensured safety of construction and traffic operation.
     针对电气化铁路增建二线高边坡石质路堑拓宽工程的实际情况,提出了采用控制爆破与防护相结合的施工方案,取得了较好的效果,并确保了施工与既有线行车的安全。
短句来源
     Bao Tian railway is a heavy geological hazard railway. The complex topography and bad geological condition along railway are the main factors of the frequent hazard to the existing railway,and they are also two great controlling factors of the second track route selection.
     宝天铁路是严重的病害铁路 ,沿线复杂、恶劣的地形、地质条件 ,是既有线病害频发的主要因素 ,同时也是增建二线选线的两大控制因素。
短句来源
  “second track”译为未确定词的双语例句
     Construction and technical & economic analysis of high side slope cut of additional second track to existing electric railways
     电气化铁路增二线高边坡路堑施工与技术经济分析
短句来源
     An analysis of construction norms for controlled blasting of cutting stonework for the second track added to existing railway electric line
     铁路增建二线路堑石方控制爆破施工定额浅析
短句来源
     Controlled blasting of stone work and unit price analysis for the construction of second track added to the existing one.
     复线施工石方控爆及单价分析
短句来源
     With the construction of the second track of Lanzhou-Xinjiang railway in northwest China, a long distance water transportation pipeline of 400km was approved to be constructed for water supply to the railway staff.
     1993年,随着兰新复线全面动工兴建,为解决沿线职工生活用水,全长近400km的输水长管路被批准兴建.
短句来源
     Second, track of development and revolution in the general principles of the Labor Party in Britain, the Social Democratic Party in Germany, the Social Party in France, the Left wing Democratic Party in Italy and the European Social Party since 1990s;
     (2)英国工党、德国社会民主党、法国社会党、意大利左翼民主党以及欧洲社会党90年代以来的发展轨迹和纲领理论变革;
短句来源
更多       
查询“second track”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  second track
The second track is more focused on theory, highlighting ideas about systemic analysis, influencing change, relational work, and gender.
      
This article will use the lessons learned from three experiences to show how parallel informal negotiation provides an alternative -or complement - to more traditional second track diplomacy.
      
Parallel Informal Negotiation: An Alternative to Second Track Diplomacy
      
The second track is the influence of heterogeneities in crosslinked materials.
      
The second track from each album was kept out of the corpus to allow later testing.
      
更多          


With the construction of the second track of Lanzhou-Xinjiang railway in northwest China, a long distance water transportation pipeline of 400km was approved to be constructed for water supply to the railway staff. Learnning the failures of long distance water conduit construction in this country some precautionared measures in design and construction stages were recommended and adopted in construction practices. Untill november 1995, 255km of pipeline has been completed and 45km of them have performed...

With the construction of the second track of Lanzhou-Xinjiang railway in northwest China, a long distance water transportation pipeline of 400km was approved to be constructed for water supply to the railway staff. Learnning the failures of long distance water conduit construction in this country some precautionared measures in design and construction stages were recommended and adopted in construction practices. Untill november 1995, 255km of pipeline has been completed and 45km of them have performed with best result for seven monthes. The measures to solve the problems raised in some test-run sections of pipeline are put forward.

1993年,随着兰新复线全面动工兴建,为解决沿线职工生活用水,全长近400km的输水长管路被批准兴建.作者结合本工程的特点,吸取了国内一些长管路施工失败的教训,从设计和施工角度提出了若干对策,并运用到施工实践中.截止1995年11月,已有255km长管路完工并将交付使用.其中45km已先期试运转七个月,情况良好.最后还就已运转部分管路出现的问题,提出了具体解决办法.

The construction norms for controlled blasting of cutting stonework for the second track added to existing railway electric line is always one of the concerns in recent years of the departments of engineering cost management, engineering design and construction. The author, based on the controlled blasting of stonework for Mei Hua Shan Station of Liu Pan Shui Hub introduced into Neijiang - Kunming railway project of which he participated in the construction, makes an analysis mainly on the controlled blasting...

The construction norms for controlled blasting of cutting stonework for the second track added to existing railway electric line is always one of the concerns in recent years of the departments of engineering cost management, engineering design and construction. The author, based on the controlled blasting of stonework for Mei Hua Shan Station of Liu Pan Shui Hub introduced into Neijiang - Kunming railway project of which he participated in the construction, makes an analysis mainly on the controlled blasting method, construction organization and additional norms for the cutting stone work of the second track to the existing railway electric line.

既有电气化铁路增建二线路堑石方控制爆破施工补充定额,近年来一直是工程造价管理、设计及施工部门普遍关心的问题。笔者就参与施工的内昆铁路引入六盘水枢纽梅花山站石方控制爆破工程为例,重点对既有电气化铁路增建二线路堑石方控制爆破施工方法、施工组织、补充定额进行分析。

Based on the actual field conditions of rock cut widening at high side slope of the second track to existing electric railways , the paper presents a construction scheme with controlled blast and protection combined, which yielded comparatively good results and ensured safety of construction and traffic operation.

针对电气化铁路增建二线高边坡石质路堑拓宽工程的实际情况,提出了采用控制爆破与防护相结合的施工方案,取得了较好的效果,并确保了施工与既有线行车的安全。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关second track的内容
在知识搜索中查有关second track的内容
在数字搜索中查有关second track的内容
在概念知识元中查有关second track的内容
在学术趋势中查有关second track的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社