|
|
|
 |
|
|
|
|  | | 为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。 | |
Apparently, it is the existence of such a non-equilibrium core-shell microstructure, which renders the dielectric properties of the BaTiO3 materials extremely sensitive to the processing parameters.
|
| 例句来源 | |
It is shown that the additive both in the equilibrium core of the COD and in nonequilibrium near-electrode plasma regions is driven toward the periphery of the discharge.
|
| 例句来源 | |
The boundary conditions are determined at the near-electrode boundaries of the equilibrium core of a continuous optical discharge in a thermoelectronic laser energy converter filled with a two-component gas mixture.
|
| 例句来源 | |
Equations describing the equilibrium core of a continuous optical discharge were derived, and boundary conditions were imposed on these equations.
|
| 例句来源 | |
The boundary conditions on the electrode boundaries of the equilibrium core of continuous optical discharge are obtained for equations which describe the distribution of the plasma temperature and in the discharge core.
|
| 例句来源 | | 更多 |
|
|
|

| | This paper studies two shuffling ways, once through then out and multiple through then out, in HTR-10 MW Test Module. Multiple through then out is better than once through with regard to rational use of the fuel and flattening the power. The behaviour of equilibrium core and loss of coolant accident is analyzed. The results indicate that characteristic features of the multiple through then out could be better fulfilling the demands of safety criterions. | | 研究了10MW高温气冷实验堆中1次和多次(5次)通过的两种换料方式。在燃料的充分利用和功率展平等方面,多次通过都优于1次通过。并对多次通过换料方式作了进一步的平衡态参数和失冷失压事故分析,表明多次通过能较好地满足规范的要求。 | | 文摘来源 | | Two schemes of initial-core of 10MW high temperature gas cooled test reactor (HTR-10) have been designed. Among which,scheme one refers to "ordinary fuel ball with graphite ball" and scheme two to "ordinary fuel ball with natural Uranium ball". The analysis and calculations have been made by means of the HTR simulation code VSOP. The results show that for the two schemes of initial-core design, HTR-10 can run smoothly from the. initial core to equilibrium core. Considered their... | | 设计了10MW高温气冷实验堆初装堆的两个方案(方案1为“普通燃料球+石墨球”,方案2为“普通燃料球+天然铀球”),采用高温气冷堆物理设计程序包VSOP对其进行分析计算,结果表明:两方案均能实现比较平稳地向平衡态过渡.就过渡过程中的单球最大功率、最大燃耗等参数而言,方案2优于方案1. | | 文摘来源 | | The homogenous mixture of spherical graphite and spherical fuel element is chosen as the initial core loading for 10 MW high temperature gas cooled reactor (HTR 10). Using the high temperature gas cooled reactor physics simulation code VSOP and the two dimensional SN code, the effects on reactivity due to water ingress and the reactivity equivalence of control rods and second reactor shutdown system were analyzed and calculated. For the running in phase from the initial core to the equilib... | | 选取石墨球与燃料球均匀混合作为10MW高温气冷堆(HTR-10)的初始装料方案,利用高温堆物理模拟程序VSOP及二维SN程序,分析计算了初始装料时HTR-10堆芯进水反应性效应、控制棒及第二停堆系统反应性当量,研究了初装堆向平衡态过渡过程中的临界性、单球最大功率、最大比燃耗等变化情况。结果表明:HTR-10初装堆的进水反应性效应比平衡态小;控制棒及第二停堆系统反应性当量比平衡态的大。但是,初装堆冷态下反应性控制系统当量裕量比平衡态小;过渡过程中有效增殖因数在很小范围内变化,燃料最大比燃耗不超过100GWd/t。 | | 文摘来源 | |   | | << 更多相关文摘 |
|
相关查询: | |
对查询结果不满意
|
|
|
|