助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   assurance department 的翻译结果: 查询用时:0.192秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

assurance department
相关语句
  保证部
     The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department.
     核设备质保大纲和项目管理的组织机构由核电容器部、制造部、质量保证部等5个部门组成。
短句来源
  “assurance department”译为未确定词的双语例句
     The last point is from the quality management and service quality circle to discuss the functions of quality assurance department, discuss how to establish the system of environmental tests quality assurance.
     最后从质量管理的角度出发,研究环境试验内部质量保证部门的作用与职能,运用服务质量环的原理构建了环境试验的质量保证体系。
短句来源
     The director of the quality assurance department takes the responsibility for the establishment and completion of the quality assurance program, with enough rights authorized by the general manager, including the right not bounded by the cost and schedule, and confirms the implementation of the program by related departments and personnel.
     质量管理部部长由总经理授予足够的权力,包括不受经费和进度的约束,以建立和不断完善质量保证大纲,并验证有关部门和人员的执行情况。
短句来源
     As the basic assurance department, the hospital logistics assurance would come down to the supplying of water, electricity, gas and some others.
     院务保障作为医院正常运营的基础性保障部门,涉及到水、电、气(蒸汽、暖气、冷气)的供应和洗涤、营房维修等方面。
短句来源
  相似匹配句对
     The Korean Department
     朝鲜语系
短句来源
     On the Third Department
     论第三部门
短句来源
     quality assurance
     质量保证;
短句来源
     quality assurance;
     质量保证;
短句来源
     Investigation of the Quality Assurance and Control on Catheterization Room of Radiological Department
     放射科导管室质量保证与管理的研讨
短句来源
查询“assurance department”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  assurance department
The quality-assurance department did not know to which treatment patients had been assigned.
      
The products are systematically tested on a regular basis by the company's own control and quality assurance department.
      
The authority partially responded to this need through creation of the Quality Assurance Department.
      
The Quality Assurance Department customized the training to meet the needs of each department using its specific data.
      
Test by quality assurance department of a sample of each lot of manufactured parts.
      
更多          


Project management for a nuclear power plant shall first consider the completion of the management organization. The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department. The general manager takes the overall responsibility for the quality of the nuclear press bearing equipment, and the vice general manager takes responsibility for the quality,...

Project management for a nuclear power plant shall first consider the completion of the management organization. The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department. The general manager takes the overall responsibility for the quality of the nuclear press bearing equipment, and the vice general manager takes responsibility for the quality, technology and schedule related with the manufacture of the equipment, and organize the organization department for the audit. The director of the quality assurance department takes the responsibility for the establishment and completion of the quality assurance program, with enough rights authorized by the general manager, including the right not bounded by the cost and schedule, and confirms the implementation of the program by related departments and personnel. The manufacture schedule shall be prepared to ensure the implementation feasibility, process continuity and flexibility. The schedule shall be followed and monitored for the whole process, to check and feedback the implementation.

核电站项目管理首先应完善管理机构。核设备质保大纲和项目管理的组织机构由核电容器部、制造部、质量保证部等5个部门组成。总经理对核承压设备制造质量负全面责任。分管核电工作的副总经理统一负责公司核承压设备制造有关的质量、技术和进度,组织管理部门进行审查。质量管理部部长由总经理授予足够的权力,包括不受经费和进度的约束,以建立和不断完善质量保证大纲,并验证有关部门和人员的执行情况。制造进度计划的编制应该保证实施的可行性、工作的连续性和执行计划的灵活性。对计划应该进行全过程的跟踪,检查计划的实施情况并及时反馈。

As the basic assurance department, the hospital logistics assurance would come down to the supplying of water, electricity, gas and some others. Now the cost of hospital logistics assurance presented the state of increasing quickly. The lag of cost accounting of hospital logistics assurance limited the development of hospital overall cost accounting. To develop it became important. The article proposed to set up cost accounting system of hospital logistics assurance and gain benefit...

As the basic assurance department, the hospital logistics assurance would come down to the supplying of water, electricity, gas and some others. Now the cost of hospital logistics assurance presented the state of increasing quickly. The lag of cost accounting of hospital logistics assurance limited the development of hospital overall cost accounting. To develop it became important. The article proposed to set up cost accounting system of hospital logistics assurance and gain benefit from the research of feasibility of the system.

院务保障作为医院正常运营的基础性保障部门,涉及到水、电、气(蒸汽、暖气、冷气)的供应和洗涤、营房维修等方面。随着医院治疗水平、城市环保要求以及工作人员生活水平的提高,医院在院务保障方面的成本投入呈大幅度的增长态势。当前院务保障成本核算滞后,正成为医院全成本核算、奖金分配和军队会计核算系统的瓶颈所在,加强院务保障成本核算的重要性正在逐渐地凸现出来。从院务保障成本核算的重要性着手,建立院务保障成本核算体系,从可行性方法上挖掘其经济效益。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关assurance department的内容
在知识搜索中查有关assurance department的内容
在数字搜索中查有关assurance department的内容
在概念知识元中查有关assurance department的内容
在学术趋势中查有关assurance department的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社