助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   setting contact 的翻译结果: 查询用时:0.008秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

setting contact
相关语句
  设置接触面
     Stab deformation of pile is considered by setting contact elements between pile and ambient medium.
     利用在桩与周围介质之间设置接触面单元来处理桩的刺入变形,得到的模拟值与计算值较为一致。
短句来源
  “setting contact”译为未确定词的双语例句
     Moreover , the author also discussed the application of contact element in the model of finite element calculation of temperature stress for the face slab of concrete through the comparison of the two calculation plays , namely not setting contact element plan and setting contact element play between face slab and cushion layer as well as face slab and toe slab .
     同时,通过在面板与垫层以及面板与趾板之间不设置接 触单元和设置接触单元的两种计算方案的比较,探讨接触单元在混凝土面板温度应力有限元计算模型中的应用。
短句来源
  相似匹配句对
     Intimate Contact
     亲密接触
短句来源
     CONTACT STRAINING
     接触应变作用
短句来源
     SETTING GOALS
     设定目标
短句来源
     It has features of "S" granite and as pulsation intrusion contact and formed the intraplate synorogenic period setting.
     具"S"型花岗岩的特征,互相呈脉动侵入接触关系,形成于板内同造山期的环境。
短句来源
     Study on Contact Wire Sag Setting for Vertical Curve Section in High Speed Railway
     高速铁路竖曲线地段接触线弛度设置的探讨
短句来源
查询“setting contact”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Based on settlement calculation formulas of CFG pile,the settlement contact element of some case history is calculated by choosing appropriate parameters,and the numerical simulation is further conducted.Stab deformation of pile is considered by setting contact elements between pile and ambient medium.The simulation result is in agreement with the calculation value,which proves the feasibility of settlement formulas.

在CFG桩沉降计算公式的基础上,通过选取适当的参数,对某工程实例进行了沉降计算,并进一步对其进行了数字仿真。利用在桩与周围介质之间设置接触面单元来处理桩的刺入变形,得到的模拟值与计算值较为一致。结果证实了该沉降计算公式的可行性。

In this paper , the author studied the stress distribution law under the action of temperature load on the face slab of concrete of rock-fill dam by using the finite element model and calculation method which can be used in imitating the construction process of rock-fill bodies for cold areas combining with the design plan for Jilintai rock-fill dam in Xinjiang . Moreover , the author also discussed the application of contact element in the model of finite element calculation of temperature stress for the face...

In this paper , the author studied the stress distribution law under the action of temperature load on the face slab of concrete of rock-fill dam by using the finite element model and calculation method which can be used in imitating the construction process of rock-fill bodies for cold areas combining with the design plan for Jilintai rock-fill dam in Xinjiang . Moreover , the author also discussed the application of contact element in the model of finite element calculation of temperature stress for the face slab of concrete through the comparison of the two calculation plays , namely not setting contact element plan and setting contact element play between face slab and cushion layer as well as face slab and toe slab . The results of analysis and study show that when the cold current comes in winter , the value of tensile stress at middle and lower part of the face slab will be bigger than the one of concrete and that setting contact element said in this paper is feasible , therefore actual stressing condition of face slab can be further imitated in this way .

本文结合新疆吉林台面板堆石坝的设计方案,应用能模拟堆石体施工过程的有限元模型和计算方法,研究了寒 冷地区的堆石坝混凝土面板在温度荷载作用下的应力分布规律。同时,通过在面板与垫层以及面板与趾板之间不设置接 触单元和设置接触单元的两种计算方案的比较,探讨接触单元在混凝土面板温度应力有限元计算模型中的应用。计算研 究表明,在冬天寒流侵袭时,面板中下部将出现大于混凝土抗拉强度的拉应力值;设置文中所述的接触单元是可行的, 这样更能模拟面板的实际受力情况。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关setting contact的内容
在知识搜索中查有关setting contact的内容
在数字搜索中查有关setting contact的内容
在概念知识元中查有关setting contact的内容
在学术趋势中查有关setting contact的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社