助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   computing economic 的翻译结果: 查询用时:0.154秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

computing economic
相关语句
  计算经济
     A model computing economic pipe diameter for municipal water supply project is established,in which the objective function is minimum annual investment,four constraint conditions are discharge,flow velocity,water pressure required,and strength of the pipe respectively.
     本文阐述了影响城市供水压力管道、管径选择的四个因素:水压力、流量、流速及强度。 建立了一个城市供水计算经济管径的数学模型,从而减小了工程投资。
短句来源
     The goal of this work is to achieve status monitoring of grid resource market based on computing economic,an indicator system of monitoring is presented,which includes operating efficiency(the speed of contracting,system efficiency,load balancing,scheduling miss ratio and resource utilization ratio),price stability and risk evaluation(fell back ratio and fraud).
     针对网格计算经济中的市场模型,实现了资源调度市场的状态数据监测。 提出的市场监测指标体系主要包括运行效率(交易达成速度、系统效率、负载平衡、调度失败率和资源利用率)、价格稳定性评估和风险评估(违约率和欺诈)。
短句来源
  相似匹配句对
     Research on Economic Models in Grid Computing
     网格计算环境中的经济模型研究
短句来源
     On Computing Method of Economic Hinterlands in Shandong Harbours
     山东省港口经济腹地计算方法的研究
短句来源
     The Economic Security of E. U.
     欧盟经济安全的中长期制约因素(欧盟形势报告节选)
短句来源
     ECONOMIC FUNCTION
     经济函数
短句来源
     Pervasive Computing
     普适计算
短句来源
查询“computing economic”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  computing economic
A new variable dimension simplicial algorithm for computing economic equilibria onSn×R+m1
      
Computing economic equilibria using benefit and surplus functions
      
Convergence of a method for computing economic equilibria
      


In this paper, network approach has been used in the computation of the economic scheduling for cascaded hydro station in electrcal power system. The problem of coordinating hydro station with thermal subsystem variable-head, variable-efficiency, spillage and the constraits in aspect of water all have been solved. The algorithm of minimal cost -maximal flow has been improved. The algorithms of searching shortest path according to the characters of the network model and increamental searching with variable...

In this paper, network approach has been used in the computation of the economic scheduling for cascaded hydro station in electrcal power system. The problem of coordinating hydro station with thermal subsystem variable-head, variable-efficiency, spillage and the constraits in aspect of water all have been solved. The algorithm of minimal cost -maximal flow has been improved. The algorithms of searching shortest path according to the characters of the network model and increamental searching with variable step have been presented. The computation given to Longxi River (four cascades), Yellow River Liu. Yan. Ba. (three cascades), Yongding River (four cascades)., Maotiao River (six casca -des) and Hongshui River (eleven cascades) shows that this algorithm is obviously advantageous over others in computational speed and availability for complex model. The algorithm makes it possible to compute economic scheduling of cascaded hydro station with microcomputer in high speed. The computational results are shown in Tab.1 and 2. The program using this algorithm has been applied in the economic scheduling of Jing. Jin. Tang. Electrical Power System.

本文应用网流法实现了电力系统梯级水电站的经济调度计算,解决了梯级水电站与火电系统的协调配合、变水头,变效率、弃水和水利约束等方面的问题,改进了最小费用最大流和最短路径的算法,并提出了变步长的微增搜索方法。通过对四川龙溪河(四级)、黄河上游的刘盐八(三级)、华北永定河(四级)和贵州猫跳河(六级)等梯级水电站的试算表明:这一算法在计算速度和对复杂模型的适应能力上均明显优于其它算法。1985年5月已将本算法编制的永定河梯级水电站经济调度程序用于京津唐电力系统日经济调度。

A model computing economic pipe diameter for municipal water supply project is established,in which the objective function is minimum annual investment,four constraint conditions are discharge,flow velocity,water pressure required,and strength of the pipe respectively.This model has been applied in design of Dayudu municipal water supply project.

本文阐述了影响城市供水压力管道、管径选择的四个因素:水压力、流量、流速及强度。建立了一个城市供水计算经济管径的数学模型,从而减小了工程投资。该模型已经在大禹渡城市供水工程设计中得到运用

This paper takes four state-owned commercial banks and five newly founded banks as research samples.According to the DEA,this paper computes economic efficiency of the nine commercial banks from 1997 to 2001.Then we investigate the determinants of banking efficiency in China by using a multivariable linear regression model with economic efficiency as dependent variable.The results indicate that several main factors affect banking efficiency,including bank capital adequacy,loan condition,human resource...

This paper takes four state-owned commercial banks and five newly founded banks as research samples.According to the DEA,this paper computes economic efficiency of the nine commercial banks from 1997 to 2001.Then we investigate the determinants of banking efficiency in China by using a multivariable linear regression model with economic efficiency as dependent variable.The results indicate that several main factors affect banking efficiency,including bank capital adequacy,loan condition,human resource quality,and management level.

本文在取得银行投入品价格信息的基础上,利用DEA模型测度了我国9家商业银行(包括4大国有商业银行和5家股份制商业银行)1997-2001期间的经济效率;进而建立计量经济模型,从微观层面对影响我国商业银行经济效率的因素进行了回归分析,结果表明银行自由资本比例、贷款质量、人力资源质量和经营管理水平是影响银行经济效率的关键因素。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关computing economic的内容
在知识搜索中查有关computing economic的内容
在数字搜索中查有关computing economic的内容
在概念知识元中查有关computing economic的内容
在学术趋势中查有关computing economic的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社