助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   cost schedule 的翻译结果: 查询用时:0.069秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

cost schedule
相关语句
  “cost schedule”译为未确定词的双语例句
     The cost,schedule and quality are the most important aim of control in the construction project.
     工程建设项目的成本、进度与质量一起并称为建设项目管理的三大控制目标。
短句来源
     And then, to the project management characteristic, main factors, basic contents and its development as well as the three project management core targets: cost, schedule, quality.
     而后,对项目管理的特点、要素、基本内容及项目管理的发展历程,逐一进行了阐述,并较为深入地研究了本文所要重点分析的项目管理的三个核心目标:成本、进度、质量。
短句来源
     This paper introduces in more detail the whole process of this project from the aspects of cost schedule quality control, work commentary and the relations with client.
     文章着重从费用、进度和质量控制 ,工作评述 ,与业主关系方面对项目全过程进行了较详细的介绍。
短句来源
     Along with development of network technique,the integration should be executed by practice of engineering in order to control the cost,schedule and quality.
     随着网络互连的技术发展,网络集成将走上工程化实现的道路,以利于项目的成本,费用和质量的控制。
短句来源
     At present, the project manager's economic behavior already became one of the main reasons of the construction enterprise risk. Some necessary restraint should be given to the project managers. The management of contract, cost, schedule, and capital should be enhanced to avoid the economic risk and protect the enterprise interests.
     项目经理的不良经济行为,如随意签订经济合同、不注意合同条款谈判、拒付和拖欠民工工资、挪用和转移工程资金等,已成为产生施工企业经济风险的主要原因之一,必须从制度上对项目经理进行必要的约束,加强合同管理、把好合同签订关,实行风险抵押承包制度,加强成本管理和进度控制,加强对工程资金的管理,才能防范和化解企业经济风险,以维护企业的利益。
短句来源
更多       
  相似匹配句对
     cost.
     在资金的组织上,把主要精力放在低成本存款上。
短句来源
     Research on Optimization of Schedule-Cost Risk for R&D Project
     R&D项目进度费用风险优化的研究
短句来源
     The Schedule and Cost Integrated Management in the Jiuhuang Airfield
     “九黄”机场工程进度与费用联合管理
短句来源
     On Criminal Cost
     犯罪成本研究
短句来源
查询“cost schedule”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  cost schedule
In general, this is not the case and the marginal cost schedule will be insufficient to describe the supply relation for imperfectly competitive firms.
      
Although determining a minimum-cost schedule according to any one of these criteria is polynomially solvable, we demonstrate that when minimizing a mix of these criteria, the problem becomes NP-hard.
      
We observe higher rates of Nash equilibrium play in the design with the steeper marginal cost schedule, but only when participants are also rematched after each decision.
      
When uncertainty is about the position of the marginal control cost schedule, policy indifference may occur, but if it does it must be the case that the slope of marginal damage cost exceeds that of marginal control cost.
      
When uncertainty involves the position of the marginal damage cost schedule, rather than policy indifference, a charge is always superior to an inefficient standard.
      
更多          


This paper focus on the application of cost/schedule synthetical control theory. The adjustable margin of project and schedule margin are defined and measured quantitatively. Then, based on banana curves, an optimizing model considering both cost and schedule margin is worked out. Its heuristic solution is also presented. The model can give efficient solution meeting restraints of dead line, resources and cost to large scaled network optimizing problem with initial feasible...

This paper focus on the application of cost/schedule synthetical control theory. The adjustable margin of project and schedule margin are defined and measured quantitatively. Then, based on banana curves, an optimizing model considering both cost and schedule margin is worked out. Its heuristic solution is also presented. The model can give efficient solution meeting restraints of dead line, resources and cost to large scaled network optimizing problem with initial feasible solution is given.

根据费用与进度综合管理的思想,在给出了项目可调余度与计划余度的定义与量化表示的基础上,提出了应用香蕉曲线,考虑资金占用与计划余度两因素来制定与调整项目计划的优化模型及其启发式求解算法.该模型与算法适合于大中型项目初步可行计划制定后,在满足工期、资源、费用约束条件下的网络计划优化问题.

From the viewpoint of risk management for engineering systems, the concepts of risk and the contents of risk estimation are clarified in this paper By utilizing network program, system simulation and statistical analysis method, We set up cost-schedule simulation models, carry on statistical analyses for simulation results, find out the statistical feature of system’s cost and schedule, obtain the risk estimation for cost risk, schedule risk and combined cost-schedule...

From the viewpoint of risk management for engineering systems, the concepts of risk and the contents of risk estimation are clarified in this paper By utilizing network program, system simulation and statistical analysis method, We set up cost-schedule simulation models, carry on statistical analyses for simulation results, find out the statistical feature of system’s cost and schedule, obtain the risk estimation for cost risk, schedule risk and combined cost-schedule risk, in order to lay a foundation for risk assess, management decision and to carry out several risk handle techniques Finally, a case study is presented in detail to illustrate the process of risk estimation for cost risk, schedule risk, combined cost-schedule risk

从工程系统风险管理的角度,阐述了风险的概念及风险估计的内容,运用网络计划技术、系统仿真技术和统计分析方法,建立了工程系统费用与进度的仿真模型,对仿真结果进行统计分析,了解系统费用与进度的统计特性,进行费用、进度及费用一进度联合风险估计,为风险评价、管理决策和实施各项风险处理技术奠定基础。最后结合算例提出了费用风险、进度风险及费用-进度联合风险的定量估计方法

Index setup of project cost/schedule control system is introduced briefly.Common grey entirety forecasting model is given.In the light of contract item performance,the step and process of modelling and solving of grey entirety forecasting model for project cost/schedule performance is emphasized.Lastly,grey entirety forecasting model for contract item cost/schedule performance is established and its solution is given.

扼要介绍工程项目费用/ 进度控制系统的指标体系,并给出一般灰色整体预测模型.针对合同项目绩效,重点探讨了工程项目费用/进度绩效灰色整体预测数学模型的建模及求解步骤、过程.建立了合同项目费用/ 进度绩效的灰色整体预测数学模型,并给出相应的解.

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关cost schedule的内容
在知识搜索中查有关cost schedule的内容
在数字搜索中查有关cost schedule的内容
在概念知识元中查有关cost schedule的内容
在学术趋势中查有关cost schedule的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社