助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   secondary reserve 的翻译结果: 查询用时:0.174秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

secondary reserve
相关语句
  “secondary reserve”译为未确定词的双语例句
     A STUDY ON MANAGEMENT MODEL OF SECONDARY RESERVE FOR ANCILLARY SERVICES MARKET
     二级备用辅助服务市场中可中断负荷管理模型研究
短句来源
  相似匹配句对
     Secondary cut
     二次掏槽
短句来源
     The data showed that there was secondary pollution in the course of transportation and reserve of water.
     反映了高层住宅二次供水中在水的输送、贮存过程中有二次污染存在。
短句来源
     The secondary disaster
     二次灾难
短句来源
     The Right of Reserve
     沉默的权利
短句来源
     EFFECT OF RESERVE DENSITY IN INTERMEDIATE CUTTING IN STAND GROWTH IN SECONDARY FORESTS
     次生林抚育保留密度对林分生长的影响
短句来源
查询“secondary reserve”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  secondary reserve
On the liquidity effect of the secondary reserve requirement
      
In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available).
      
Since queens forage in the field, we interpret claustrality as a secondary reserve strategy when foraging fails, and suggest that foraging is obligate for P.
      
The secondary reserve is active or reactive power capacity activated in 10 to 15 minutes after the frequency has deviated from the nominal frequency.
      
The secondary reserve requirement mandates that the commercial banks will hold an additional fraction of their assets in form of government bonds.
      
更多          


In this paper some research work is done to set up a tender mathematic model of interrupted load (IL, for short) in the secondary reserve market. This model bases on the OPF including the main aspects to be considered in designing the tender , such as , notice in advance, power factor of load .The electric marketing operating managing organization may use this model to choose scheme of IL bidding. The structure of IL market is studied and some advises are come up with. By using ILM, ISO may have...

In this paper some research work is done to set up a tender mathematic model of interrupted load (IL, for short) in the secondary reserve market. This model bases on the OPF including the main aspects to be considered in designing the tender , such as , notice in advance, power factor of load .The electric marketing operating managing organization may use this model to choose scheme of IL bidding. The structure of IL market is studied and some advises are come up with. By using ILM, ISO may have enough operation reserve capacity during the peak load.

该文研究建立了二级备用(即非旋转备用,或称运行备用)容量辅助服务市场中的可中断负荷(以下简称 IL招标数学模型。电力市场运营管理机构可以采用这个模型对 IL 投标方案进行实时性选择。这个模型基于最优潮流(OPF)算法。该文也对 IL 市场结构进行了研究并提出了建议。模型包括了对 IL 招标方案设计要考虑的主要因素,例如,提前通知,负荷点的位置,负荷的功率因素,等等通过实施可中断负荷管理(简称 ILM),ISO 可以在电网高峰负荷时段拥有充足的运行备用容量。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关secondary reserve的内容
在知识搜索中查有关secondary reserve的内容
在数字搜索中查有关secondary reserve的内容
在概念知识元中查有关secondary reserve的内容
在学术趋势中查有关secondary reserve的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社