助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   project results 的翻译结果: 查询用时:0.009秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

project results
相关语句
  “project results”译为未确定词的双语例句
     Successful project results from successful management-application of EPM in management of R&D in chemical industry
     成功的项目源自成功的管理——EPM在化工项目开发管理中的应用
短句来源
     The paper elaborated the project of optimum researching on GPS fiducial control net and pseudo-geoid in Jiouquan basin and basic circumstances of operation, analyzed the program of setting up the net of GPS net,optimum plan of pseudo-geoid and data processing program and examined the precision of project results,finally,the grade B and C GPS fiducial control net built in Jiouquan basin has been obtained, which the precision is superior to state' s grade Band grade C net;
     本文阐述了酒泉盆地GPS基准控制网及似大地水准面精化研究项目及实施的基本情况,并分析论证GPS网的建网方案、似大地水准面精化方案、数据处理方案,对项目成果精度进行检合分析,最终得出酒泉盆地所建立的B、C两级GPS基准控制网,其精度优于国家B级网和C级网;
短句来源
     Objective To learn the community and family based care and support to children orphaned by AIDS project results after 3 year implementation.
     目的了解以社区、家庭为基础的艾滋病致孤儿童关怀项目开展3年后的效果。
短句来源
     After analyzing the actual project results of consolidating ground base,the preliminary conclusion of good effect of using deep stirring stake to consolidate soft foundation soil and raise foundation soil bearing capacity has been obtained.
     通过分析地基加固的实际工程结果 ,采用了深层搅拌桩方加固软土地基 ,提高软土地基土的承载力 ,效果良好。
短句来源
     The project results prove this way is fit to show the relationship between milling force and the current of AC SM.
     工程实践表明 ,该方法适用于表达铣削力与电流之间的关系。
短句来源
更多       
  相似匹配句对
     The followings are the results of the project.
     论文工作得到以下结果。
短句来源
     Results:
     结果显示,
短句来源
     [RESULTS]
     [结果和结论]
短句来源
     PRIMARY RESULTS OF PROJECT INDEPTH
     喜马拉雅和西藏高原深地震反射剖面的初步成果
短句来源
     PROJECT
     项目
短句来源
查询“project results”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  project results
Modelling "clean rain" treatments in acidified soils-EXMAN project results
      
Student performance is measured by project results, examination results and by design studies.
      
An extensive diatom ring test, together with an audit of the project results, provided a better understanding and quantification of the uncertainty in quality assessment of running waters using diatoms.
      
Genetic data and methods are contributing more and more to epidemiological studies of complex diseases, and their application is influenced by information availability and Genome Project results.
      
MICE culminated in a large stakeholder-orientated workshop, the aim of which was not only to disseminate project results but also to develop new stakeholder networks, whose expertise can be drawn on in future projects such as ENSEMBLES.
      
更多          


The relevant shortcoming of tidal power generation appears on that it couldn't be operated continuously to deliver power energy.This can be overcomed currently by taking the following projects: (1)To operate the tidal power station incorporated with other types of power station to meet the load demaned. (2)To regulate the using time of consumers in phase with the power output from the tidal power station. (3)To adopt double basin-high and low-project. However,all of the above mentioned projects...

The relevant shortcoming of tidal power generation appears on that it couldn't be operated continuously to deliver power energy.This can be overcomed currently by taking the following projects: (1)To operate the tidal power station incorporated with other types of power station to meet the load demaned. (2)To regulate the using time of consumers in phase with the power output from the tidal power station. (3)To adopt double basin-high and low-project. However,all of the above mentioned projects result in no satisfaction in practical use, specially the third one gets only half of the basin volume utilized and half energy delivered as compared with the single basin project.Thus,it is unreasonable in economy. In this article a double basin-larg and small-project is put forward by the auther When the tidal range is flush on both sides of the barrage located at the large basin and no energy can be delivered,at this time,power energy can be delivered from the power station located at the small basin.Merits of this project are as follows: (1)Continuous power generation could be realized. (2)Energy delivered would be more than that delivered from a single basin project of the same installed capacity. (3)It could be operated for peak power modulation and power factor correction. (4)It could be operated as pump storage power generation as well,it results in increasing the electrical energy. The amount of civil works and investment of this project are the same as the double basin-high and low-project,but more power generation than that in single basin projects. This double basin-large and small-project can be used for estuary and bay established tidal power station.

潮汐发电较大的缺点是间断性发电。现有解决办法是:与其它电站互补发电;调节用电负荷时间;电站用高低双库开发方式。但均有缺点,尤其是高低库方式,库容利用率及发电量均较单库开发方式减半,不经济。本文提出采用新的大、小库开发方式,即在平潮前后,大库中断发电时,由预留的小库发电补偿。其优点是;司做到连续不断发电;发电量较单库开发方式为多;可调峰、调相;且可抽水增加发电量;照常司发挥工程综合利用效用。但水工工程量、投资与高、低库方式一样,较单库方式为多这种大、小库开发方式对河口型、港湾型潮汐电站均司适用。

The project of exploiting graassland resource in bamiao mountain aims at developing a commerical beef production base by establishing sown pasture, improving the native grassland, and providing technical training and services on supply, production and marketing. The project was supported by the State loan. Desired results has achieved after 4 yeal continuous efforts. The total zagricultural output value is increased 1.78 times, of which 72.7% from animal production.The success of the project results greatly...

The project of exploiting graassland resource in bamiao mountain aims at developing a commerical beef production base by establishing sown pasture, improving the native grassland, and providing technical training and services on supply, production and marketing. The project was supported by the State loan. Desired results has achieved after 4 yeal continuous efforts. The total zagricultural output value is increased 1.78 times, of which 72.7% from animal production.The success of the project results greatly from the following, selecting herbage varieties, fencing,optimising flock structure, setting up animal breeding station, veterinary station, consulting services system, improving the mangement of pasture and animal and establishing specialised farms.

八面山草地开发的方向为建立人工草地,发展以肉牛为主的商品牧业基地。其方法采取由县牧工商公司接受国家贷款,承担贷款投放、回收、技术培训、草地建设技术实施和产前、产中、产后一条龙服务。在技术上通过筛选牧草品种、建立混播人工草地、建立固定式永久性围栏、组建畜群及建立合理的畜群结构、建立品改站、兽医站及咨询服务体系、加强人工草地和畜群管理以及各种专业户的建立等措施,经过四年试点,已初见成效。全乡农牧业总产值为建设前的2.78倍,其中牧业产值为农牧业总产值的72.2%。

On the basis of analysing major harnessive project results for national second phase of Daling river in Naiman county. The author analysed thoroughly the expected effects of harnssing work and put out the necessary and the feasibility of the major harnessive project.

在简要介绍奈曼旗大凌河流域国家水保重点治理二期工程的基础上,对其所期望获得的效益作了详尽的分析,说明了重点治理工程是切实可行,且非常必要的。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关project results的内容
在知识搜索中查有关project results的内容
在数字搜索中查有关project results的内容
在概念知识元中查有关project results的内容
在学术趋势中查有关project results的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社