     During renovation project of the Beijing Concert Hall,under its original super-structure,an overall excavation work has been carried out,and thereafter a 6.5 m depth basement on raft foundation has been completed.
     北京市音乐堂改建工程中,在已有的上部结构下全面开挖,新建6.5m深的筏形基础地下室。
短句来源
     Based on an analysis of current situation of urban domestic water consumption, level of water-saving, and some existing problems, with the year 2000 taken as a datum year, the potential of urban domestic water-saving was predicted and analyzed for 2010, 2020, and 2030 from the angles of popularization of water-saving facilities and reformation of urban pipe networks. Moreover, some countermeasures that should be adopted for overall excavation of water-saving potential were put forward.
     在分析山西省城镇生活现状用水节水水平及存在问题的基础上,以2000年作为现状水平年,从推行节水型器具及城镇管网改造两个方面,预测分析了2010年、2020年及2030年不同水平年城镇生活现状节水潜力,提出了全面挖掘节水潜力应该采取的对策.
短句来源
  相似匹配句对
     On Overall Education
     关于素质教育的思考
短句来源
     It is to develop overall productivity.
     不仅要发展社会生产力,而且要发展自然生产力;
短句来源
     Excavation of Zhayanshan Tunnel
     渣盐山隧道施工
短句来源
     The Excavation of Baoshiling Tailings
     豹市岭尾矿库尾矿的开采
短句来源
     MODEL TEST STUDY ON FOUNDATION DEEP EXCAVATION TO CAUSE OVERALL STABILITY OF IMMERSED TUNNEL SHAFT
     基槽开挖引起沉管隧道竖井变型的模型试验研究
短句来源
查询“overall excavation”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


During renovation project of the Beijing Concert Hall,under its original super-structure,an overall excavation work has been carried out,and thereafter a 6.5 m depth basement on raft foundation has been completed.During its construction,an artificial bored pile with a continuous platform beam underpinning method was adopted.Furthermore,the “one column supported by two piles method”has been implemented,so that those bearing capacities of the original columns could be well transmitted and easily transferred.Finally...

During renovation project of the Beijing Concert Hall,under its original super-structure,an overall excavation work has been carried out,and thereafter a 6.5 m depth basement on raft foundation has been completed.During its construction,an artificial bored pile with a continuous platform beam underpinning method was adopted.Furthermore,the “one column supported by two piles method”has been implemented,so that those bearing capacities of the original columns could be well transmitted and easily transferred.Finally 24-columns underpinning has been completed with an increased floor space of 4 000 m2.

北京市音乐堂改建工程中,在已有的上部结构下全面开挖,新建6.5m深的筏形基础地下室。施工采用人工挖孔桩加连续承台梁的托换方案,采用“两桩承一柱”实现原结构柱力的传递与转换,共托换独立柱24根,新增面积4000m2。

Based on an analysis of current situation of urban domestic water consumption, level of water-saving, and some existing problems, with the year 2000 taken as a datum year, the potential of urban domestic water-saving was predicted and analyzed for 2010, 2020, and 2030 from the angles of popularization of water-saving facilities and reformation of urban pipe networks. Moreover, some countermeasures that should be adopted for overall excavation of water-saving potential were put forward.

在分析山西省城镇生活现状用水节水水平及存在问题的基础上,以2000年作为现状水平年,从推行节水型器具及城镇管网改造两个方面,预测分析了2010年、2020年及2030年不同水平年城镇生活现状节水潜力,提出了全面挖掘节水潜力应该采取的对策.

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关overall excavation的内容
在知识搜索中查有关overall excavation的内容
在数字搜索中查有关overall excavation的内容
在概念知识元中查有关overall excavation的内容
在学术趋势中查有关overall excavation的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社