Moreover, through the 2\| D flow sediment mathematical model calculation for the situation of sediment depositing in the Fengdu section of the Yangtze River after 50 years since the completion of the Three Gorges Reservoir, this paper analyzed the influence of the three ports to the Fengdu Port.
The result shows that it is resultful to decrease the sediment depositing to the reservoir area when reducing the water level at the same incoming water and incoming sediment.
The quality of the products from hydrogen finishing is better, the yield is higher,but it is necessary to increase the subsidence time of denitrified oil or use the filter measure in order to avoid a little sediment depositing on the top of the reactor and causing the increment of the reactor's pressure;
To improve the flood control capacity and safety of the major levees of the lower Yellow River, the authors made the following suggestions: (1) abolish the farming levees, and restore the floodplain’s flood conveying and sediment depositing functionality;
Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system.
Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system and corresponding technical measures.
Through the variability of sediment depositing and incoming sediment in the Dahua water reservoir area before and after the building of the Yantan hydropowr station, the author analysed the sediment depositing situation in the Dahua water reservoir area, and predicted its final result by finite difference mehod.
Baishi reservoir lies on the main stream of the Daling River in the west of Liaoning Province. Inorder to reduce sediment depositing and to extend the life of reservoir , centralized array twelve bottom holes of4 m×7 m at the right of river-bed. For solving the gate slot of repair wear because of sediment, the repair gateis disposed in the entrance of bell mouth, thus reducing velocity of flow. To avoid the sediment block up thebottom holes, the work gate is disposed at the front ver...
The main waterway of the Pearl River system from Guangzhou city to the Humen inlet is a tidal channel,in which tidal energy predominates. The tidal channel system is formed with massive sediment depositing here brought from the Beijiang River in the west and the Dongjiang River in the east. According to the formation mechanism and dynamics features, it is termed "progressive tidal estuary", which is characterized by the co existence of tidal flats and troughs on both sides of the main tidal cha...