First discussed are the problems in which the equations are in ill-condition and the components are difficult to separate but the components in mathematic models are closely related. Then, a synthetic analysis method for the in-situ observed data of dams is proposed. Its key points are as follows. The straight analysis, inverse analysis and 3-D FE methods are synthetically used to separate each component from observed values, and the working behaviour of the dam is judged by using the variation law of time effect... First discussed are the problems in which the equations are in ill-condition and the components are difficult to separate but the components in mathematic models are closely related. Then, a synthetic analysis method for the in-situ observed data of dams is proposed. Its key points are as follows. The straight analysis, inverse analysis and 3-D FE methods are synthetically used to separate each component from observed values, and the working behaviour of the dam is judged by using the variation law of time effect component. Finally, the method is applied to analyse the observed data of a gravity arch dam whose observed values are changing in the initial stage of water impoundment, and the result obtained conforms to the realistic working state of the dam. 论述了数学模型中的各因子呈密切相关时,用常规分析法将出现方程病态和难以分离各个分量等问题.提出用综合分析法分析大坝原型观测资料:结合大坝结构性态,综合应用正分析,反演分析和三维有限元数值计算等方法,从观测值中独立分离各个分量;以时效分量的变化规律及数值大小来评价大坝的工作性态.作为实例,分析了某重力拱坝在蓄水初期的变形观测资料,评价了该坝的实际运行状态. In order to study the performance of CFRD, regression analysis and inverse analysis are adopted to investigate the observed data of displacement of the rockfill dam under and after construction. That is an experimental dam in the seventh Five Year Plan of our country. Statistical models and mixing models are established. The findings show that the observed data of displacement of the rockfill dam can be detached according to... In order to study the performance of CFRD, regression analysis and inverse analysis are adopted to investigate the observed data of displacement of the rockfill dam under and after construction. That is an experimental dam in the seventh Five Year Plan of our country. Statistical models and mixing models are established. The findings show that the observed data of displacement of the rockfill dam can be detached according to independent variable factors, that the creepage of the rockfill body during construction can not be neglected and that there are intervals between the experimental values and the values of inverse analysis of parameters of stress strain relation of the rockfill body. If the observed data after water impoundment are analysed and the prognostive equations are established, the monitoring and feedback about safe performance of CFRD can be realized. 为探讨面板坝的运行性态,采用回归分析与反演分析方法,对“七五”期间试验坝堆石体施工中及竣工后的实测位移资料进行分析,建立了统计模型与混合模型.研究结果表明,堆石坝的实测位移数据可以按自变量因子进行分离;施工期堆石体的蠕变不能忽略,其占相当比例;堆石材料本构关系中的参数的试验值与实测反演值有一定差别;对蓄水后的实测资料进行分析,建立预报方程,可实现大坝安全运行的监控和反馈 The article, in accordance with the characteristics of water impoundment and discharge of the projects on the Yellow River, Suggests an approach to estimate the reduction of the outage time and the increase of water supply on the lower reaches of the Yellow River in the low water period with the Longyangxia and Liujiaxia reservoirs' joint operation. Based on the analysis of the measured data from 1986 to 1992, it is concluded that during the low water season on the lower reaches of... The article, in accordance with the characteristics of water impoundment and discharge of the projects on the Yellow River, Suggests an approach to estimate the reduction of the outage time and the increase of water supply on the lower reaches of the Yellow River in the low water period with the Longyangxia and Liujiaxia reservoirs' joint operation. Based on the analysis of the measured data from 1986 to 1992, it is concluded that during the low water season on the lower reaches of the Yellow River, the outage period was annually shortened by 2. 14 months, the water supply was increased by 1. 15 Gm3, therefore, the 2 reservoirs make a great contribution to easing the water shortage on the lower reaches of the Yellow River. 本文结合黄河上、下游蓄、引水特点,首次提出龙羊峡、刘家峡两水库非汛期补水对缩短下游断流时间和增加下游工农业用水的估算方法,并利用1986—1992年非汛期实测资料,估算了相应数值,平均每年缩短了断流时间2.14个月,增加下游工农业用水量11.5亿m3,可增加下游灌溉面积约29.4万ha,为缓解黄河下游水量供需矛盾做出了重要的贡献。
|