planned overhaul
相关语句
  计划检修
     Application of System Theory in the Planned Overhaul of the Medium Plate Plant of Jigang
     系统理论在济钢中板厂计划检修中的应用
短句来源
     The analysis content and idea of the reliability index analysis for power plant, such as index integration analysis of main unit, incident analysis, planned overhaul analysis, the reliability analysis of subsidiary machine and reliability index forecast analysis, were put forward, and their analysis modes were discussed.
     文章提出了发电厂可靠性指标分析:主机指标综合分析、事件分析、计划检修分析、辅机可靠性分析及可靠性指标预测分析的具体分析内容及分析思路,并对其分析模式进行了探讨。
短句来源
     The current function modules of equipment overhaul subsystem in ECETS were introduced including monthly equipment off service overhaul management, daily work plan management, management of equipment off service application and approval, statistical and inquiry management of equipment overhaul work. The related improvement for electrical mechanism reform in future were also discussed such as realizing on line generating safety check while combining equipment overhaul, arranging planned overhaul of plant units reasonably, enhancement of fair, just and open dispatching and etc.
     介绍了华东电网电能交易系统 ( ECETS)设备检修子系统目前的各功能模块 (设备停役月度检修管理、每日作业计划管理、设备停役申请及审批管理、设备检修统计查询管理 ) ,以及针对电力体制改革 ,该系统将作出的相应的改进 ,如结合设备检修实现在线发电安全校核 ,合理安排电厂机组计划检修 ,加强“公平”、“公正”、“公开”的调度等
短句来源
     Distribution system dispatching graphics aided switch generation and management system supported by the platform of distribution management system (DMS) is realized in response to the requirement of the safety, rapidity and convenience in distribution system dispatching planned overhaul and emergency transaction.
     针对配电网调度在计划检修及事故处理中对操作安全性、快速性以及方便性的要求,实现了与配电管理系统(DMS)平台一体化的配电网调度图形辅助开票及管理系统。
短句来源
  “planned overhaul”译为未确定词的双语例句
     Discussion on Planned Overhaul Optimization and Condition Monitoring Technology for Hydropower Plant
     水电厂优化检修与状态监测技术的探讨
短句来源
     Abstract The paper proposes the framework of distributive network type of state monitoring and fault diagnosing system,which,based on expert systems as the main diagnosing resort,is composed of a triple stage hiererchic structure and may be used for system state monitoring and fault diagnosing of vital equipment within the trade and may serve as the importent technical guarantor that planned overhaul of equipment be replaced by premonitory repair.
     该文提出了一个基于以专家系统为主要诊断方法的,由三级网络结构组成的分布式网络化状态监测和故障诊断系统的网络框架,适用于行业内重大设备的系统化状态监测和故障诊断,将为设备从定期维修向预测检修模式转变提供重要的技术保证。
短句来源
     The transition of regular planned overhaul to the status maintenance for the equipment in power plant is a necessary tendency of technical development.
     发电厂设备由定期计划大修过渡到状态检修 ,是技术发展的必然趋势。
短句来源
  相似匹配句对
     Discussion on Planned Overhaul Optimization and Condition Monitoring Technology for Hydropower Plant
     水电厂优化检修与状态监测技术的探讨
短句来源
     Application of System Theory in the Planned Overhaul of the Medium Plate Plant of Jigang
     系统理论在济钢中板厂计划检修中的应用
短句来源
     Interlinguistics and Planned Languages
     国际语学和计划语言
短句来源
     It is low to overhaul efficiency;
     检修效率低;
短句来源
     It is with high costs to overhaul.
     检修成本高。
短句来源
查询“planned overhaul”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Abstract The paper proposes the framework of distributive network type of state monitoring and fault diagnosing system,which,based on expert systems as the main diagnosing resort,is composed of a triple stage hiererchic structure and may be used for system state monitoring and fault diagnosing of vital equipment within the trade and may serve as the importent technical guarantor that planned overhaul of equipment be replaced by premonitory repair.Figs 4 and refs 4

该文提出了一个基于以专家系统为主要诊断方法的,由三级网络结构组成的分布式网络化状态监测和故障诊断系统的网络框架,适用于行业内重大设备的系统化状态监测和故障诊断,将为设备从定期维修向预测检修模式转变提供重要的技术保证。图4参4

With the example of the No1 and 2 generation units of the Hebi Wanhe Generation Co. Ltd,and according to the variation of the reliability index,find out the cause which influence equivalent usability factor. Point out the effective way to promote the new generation unit stability is to improve the quality of the equipment manufacturing and installation, conscientiously deal with the first planned overhaul of the new generation unit,enhance the fuel management and the training of the operation...

With the example of the No1 and 2 generation units of the Hebi Wanhe Generation Co. Ltd,and according to the variation of the reliability index,find out the cause which influence equivalent usability factor. Point out the effective way to promote the new generation unit stability is to improve the quality of the equipment manufacturing and installation, conscientiously deal with the first planned overhaul of the new generation unit,enhance the fuel management and the training of the operation and overhaul personnel.

以鹤壁万和发电有限责任公司1、2号机组运行过程为例,根据可靠性指标的变化,找出影响等效可用系数的原因,指出提高设备制造和安装质量,认真做好新机组的首次计划检修,加强运行、检修人员的培养和燃料管理,提高机组等效可用系数,是加速新机稳定的有效途径。

A mathematical model of maintenance majorization for large capacity fossil fired generating units of power station is pressented. The maintenance majoization technology and the determination method for optimizatioin time to maintenance of fossil fired generating units are given together with the statistical analysis method and results for time to planned overhaul and planned overhaul duration of large capacity fossil fired generating units for Huangtai Power Plant. Figs 2, table 1 and refs 5.

提出了大型火电机组优化检修的数学模型。介绍了大型火电机组优化检修的关键技术和检修周期的确定方法。给出了黄台发电厂大型火电机组计划大修间隔时间和计划大修停机时间的统计分析方法和结果。图 2表 1参 5

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关planned overhaul的内容
在知识搜索中查有关planned overhaul的内容
在数字搜索中查有关planned overhaul的内容
在概念知识元中查有关planned overhaul的内容
在学术趋势中查有关planned overhaul的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社