助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   power generating 在 工业经济 分类中 的翻译结果: 查询用时:0.178秒
图标索引 在分类学科中查询
所有学科
工业经济
电力工业
新能源
水利水电工程
自动化技术
更多类别查询

图标索引 历史查询
 

power generating
相关语句
  发电
    Improve Technical Level Of Power Generating Equipment And Adjust Structure Of Power Supply
    提高发电设备技术水平,调整电源结构
短句来源
    Research of Strategy Cost Management in Power Generating Enterprise
    发电企业战略成本管理研究
短句来源
    Security Management of Power Generating Enterprises in Market Economy
    市场化条件下发电企业安全管理的新视野
短句来源
    Thoughts on Reformation of Maintenance System for Power Generating Equipments
    发电设备检修体制改革的思考
短句来源
    IMPLEMENTATION OF J2EE PLATFORM BASED COMMERCIAL OPERATION AND BIDDING DECISION SUPPORTING SYSTEM FOR POWER GENERATING ENTERPRISES
    基于J2EE平台的发电企业商业运营及竞价决策技术支持系统的实现
短句来源
更多       
  “power generating”译为未确定词的双语例句
    Establishment and Application of Information Code Standard for Electric Power Generating Equipment
    电力生产设备信息编码规范的建立与应用
短句来源
    A NEW REAL TIME MARKET POWER MONITORING METHOD OF POWER GENERATING SETS BASED ON SENSITIVITY ANALYSIS
    基于灵敏度分析的发电机组市场力实时监控方法
短句来源
    Reliability of main auxiliary equipments of thermal power generating units in 2005.
    2005年火电机组主要辅助设备运行可靠性状况
短句来源
    Influence on Domestic Electric Power Generating and Supplying Enterprises by Entering WTO
    加入WTO对我国发供电企业的影响
短句来源
    Discussion About the Approach of Market Development for Kailuan Power Generating Company
    浅谈开滦热电集团开拓市场的途径
短句来源
更多       
查询“power generating”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  power generating
The present paper deals with the influence of the prior austenite grain size and isothermal aging time on the degree of embrittlement of 2.25Cr-1Mo steel, which is very popular for its use in power generating and other petrochemical industries.
      
Databases and an automated system for predicting strength and service life of power generating equipment
      
Coatings of this type would appear to be particularly suitable for service under conditions of high-temperature wear in an oxidizing atmosphere, such as are encountered in metallurgical and power generating installations and gas turbine engines.
      
The mechanical properties and structure of the metal of circulation pipelines from steel 10GN2MFA in the initial condition and after 100,000 h of operation at power generating units Nos.
      
This is particularly important in the mass production of transport vehicles and the manufacture of parts and assemblies that are used in chemical plants or power generating stations.
      
更多          


Abstract This paper presents the present status of production of hydraulic power generating facilities with international cooperation as Well as the way and content of manufacture. Views on results and outlook are also presented.

本文叙述了当前我国水电设备国际合作生产的现状、方式、内容及其收获与展望。表2

The objective of the study is to conduct a long term electric expansion planning and nuclear power planning for Fujian Province. The Wien Automatic System Planning Package (WASP- I ) is used to optimize the electric system. Probabilistic Simulation is one of the most favorite techniques for middle and long term generation and production cost planning of electric power system. The load duration curve is obtained by recording the load data of a time interval into a monotone non-increasing sense. Polynomial function...

The objective of the study is to conduct a long term electric expansion planning and nuclear power planning for Fujian Province. The Wien Automatic System Planning Package (WASP- I ) is used to optimize the electric system. Probabilistic Simulation is one of the most favorite techniques for middle and long term generation and production cost planning of electric power system. The load duration curve is obtained by recording the load data of a time interval into a monotone non-increasing sense. Polynomial function is used to de- scribe the load duration curve (LDC), and this LDC is prepared for probabilistic simulation in WASP- I . WASP- I is a dynamic optimizing module in the area of supply modelling. It could find out the economically optimal expansion plan for a power generating system over a period of up to thirty years, with the constraints given by the planners. The optimum is evaluated in terms of minimum discounted total costs. Generating costs, amount of energy not served and reliability of the system are analyzed in the system expansion planning by using the probabilistic simulation method. The following conclusions can be drawn from this study. Hydro electricity is the cheapest one of all available technologies and resources. After the large hydro station is committed at the end of 1995, more base load power plants are needed in the system. Goal-fired power plants with capacity of 600 MWe will be the most competitive power plants in the future of the system. At the end of the studying period, about half of the stalled capacity will be composed of these power plants. Nuclear power plants with capacity of 600 MWe are suitable for the system after the base load increases to a certain level. Oil combustion units will decrease the costs of the system.

为制定福建省初步的长期电力扩展规划和核电发展规划,开发了WASP软件包。采用ENPEP(能源规划与评价)软件包中的两个模型(LDC & ELECTRIC)进行最优扩展规划。采用LDC(负荷持续曲线)模型分析系统负荷情况。ELECTRIC(电力)模型用来优化电力系统。WASP-Ⅲ可以在满足约束条件的情况下产生一个不超过30年的电力系统经济最优扩展方案。根据贴现费用大小来评价方案是否最优。基于不同扩展方案的成本比较,在系统扩展规划中运用概率模拟法分析发电成本、电力缺口以及系统可靠性。结果表明:在所有可用的技术与资源中,水电最为便宜。在将来的系统中,600MW的火电厂最具有竞争力。在研究期末(2020年),大约二分之一的机组将由这类机组构成。当基荷上升到某一水平时,引入600MW的核电厂(在2005年左右)对于系统来说是合理的。燃油机组将会降低系统的成本。

The objective of the study is to conduct a long term electric expansion planning and nuclear power planning for Fujian Province. The Wien Automatic System Planning Package (WASP-III) is used to optimize the electric system. Probabilistic Simulation is one of the most favorite techniques for middle and long term generation and production cost planning of electric power system. The load duration curve is obtained by recording the load data of a time interval into a monotone non-increasing sense. Polynomial function...

The objective of the study is to conduct a long term electric expansion planning and nuclear power planning for Fujian Province. The Wien Automatic System Planning Package (WASP-III) is used to optimize the electric system. Probabilistic Simulation is one of the most favorite techniques for middle and long term generation and production cost planning of electric power system. The load duration curve is obtained by recording the load data of a time interval into a monotone non-increasing sense. Polynomial function is used to describe the load duration curve(LDC), and this LDC is prepared for probabilistic simulation in WASP-III. WASP-III is a dynamic optimizing module in the area of supply modelling. It could find out the economically optimal expansion plan for a power generating system over a period of up to thirty years, with the constraints given by the planners. The optimum is evaluated in terms of minimum discounted total costs. Generating costs, amount of energy not served and reliability of the system are analyzed in the system expansion planning by using the probabilistic simulation method. The following conclusions can be drawn from this study. Hydro electricity is the cheapest one of all available technologies and resources. After the large hydro station is committed at the end of 1995, more base load power plants are needed in the system. Coal-fired power plants with capacity of 600 MWe will be the most competitive power plants in the future of the system. At the end of the studying period, about half of the stalled capacity will be composed of these power plants. Nuclear power plants with capacity of 600 MWe are suitable for the system after the base load increases to a certain level. Oil combustion units will decrease the costs of the system.

为制定福建省初步的长期电力扩展规划和核电发展规划,开发了WASP软件包。采用ENPEP(能源规划与评价)软件包中的两个模型(LDC&ELECTRIC)进行最优扩展规划。采用LDC(负荷持续曲线)模型分析系统负荷情况。ELECTRIC(电力)模型用来优化电力系统。WASP-Ⅲ可以在满足约束条件的情况下产生一个不超过30年的电力系统经济最优扩展方案。根据贴现费用大小来评价方案是否最优。基于不同扩展方案的成本比较,在系统扩展规划中运用概率模拟法分析发电成本、电力缺口以及系统可靠性。结果表明:在所有可用的技术与资源中,水电最为便宜。在将来的系统中,600MW的火电厂最具有竞争力。在研究期末(2020年),大约二分之一的机组将由这类机组构成。当基荷上升到某一水平时,引入600MW的核电厂(在2005年左右)对于系统来说是合理的。燃油机组将会降低系统的成本。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关power generating的内容
在知识搜索中查有关power generating的内容
在数字搜索中查有关power generating的内容
在概念知识元中查有关power generating的内容
在学术趋势中查有关power generating的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社