助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   peak regulating 的翻译结果: 查询用时:0.117秒
图标索引 在分类学科中查询
所有学科
电力工业
动力工程
工业经济
更多类别查询

图标索引 历史查询
 

peak regulating
相关语句
  调峰
     Researches on Peak Regulating Capacity during Heating Period of CC140/N200-130/535/535 Turbines
     CC140/N200-130/535/535型汽轮机供热期调峰能力研究
短句来源
     Dynamic Characteristic and Control System Adjusting of Main Steam Temperature in 325MW Peak Regulating Power Unit
     325MW调峰机组主汽温的动态特性及其控制系统的整定
短句来源
     The Research on the Peak Regulating Modes of Homemade 300MW Fossil-fired Unit
     国产300MW火电机组调峰方式的研究
短句来源
     Peak Regulating Turbine Rotor's Thermal Stress on-line Monitoring System
     调峰汽轮机转子热应力及寿命损耗在线监测系统
短句来源
     The Affection Study of Power Acceptance from Three Gorges in negard to Peak Regulating of Hubei Province
     接受三峡电力对湖北调峰的影响研究
短句来源
更多       
  “peak regulating”译为未确定词的双语例句
     The algorithm is applied in a 200 MW peak regulating drum boiler for reheating temperature process,the temperature can be controlled within±2℃.
     该算法已应用于电站200 MW锅炉机组再热汽温过程控制,控制精度达到2℃以内。
短句来源
  相似匹配句对
     ANALYSIS OF REGULATING PEAK CAPACITY TO THREE GORGES HYDROPOWER PLANT
     三峡电站调峰能力分析
短句来源
     Determination of peak load regulating in geothermal district heating systems
     地热供热系统调峰负荷的确定方法
短句来源
     Regulating the T lymphocyte.
     调节T淋巴细胞;
短句来源
     The Peak of the World
     世界之峰
短句来源
     The elution of peak I .
     经生物学鉴定,第Ⅰ峰具有生物活性。
短句来源
查询“peak regulating”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The dynamic model of the main steam temperature in a 325MW peak regulating power unit has been obtained by identification and then the demands on the regulation of steam temperature control system was proposed. In order to simulation and adjusting of regulator, a transformation method converting descrete transfer function H(Z) into continuous transfer function H(s), has been developed. An effective method of tuning the parameters of double loop system based on the synthesized parameters of partially optimazation...

The dynamic model of the main steam temperature in a 325MW peak regulating power unit has been obtained by identification and then the demands on the regulation of steam temperature control system was proposed. In order to simulation and adjusting of regulator, a transformation method converting descrete transfer function H(Z) into continuous transfer function H(s), has been developed. An effective method of tuning the parameters of double loop system based on the synthesized parameters of partially optimazation is presented in this paper Above methods are proven to be valuable in practice.

本文用辨识试验得出了325MW调峰机组在不同负荷下汽温对象的一组动态模型,并提出了调峰机组对汽温控制系统的要求;为仿真和计算整定参数的需要,文中推出了一种转换精度较高的Z→S转换算法和基于在局部优化综合指标下的双回路系统参数整定方法;经现场投试表明,这些方法具有较好的实用价值。

With the help of MPEA (Monenco Probabilistic Energy Assessment, a long-term power generationplanning software pakage), the required capacity and the economic developing capacity of peaking units inECPN by 2000 have been obtained, and through the technical and ecomomical comparison among variouspeaking generation, the measures for solving the peak regulating problems, from the viewpoint of systematiceconomy, have been analysed.

通过负荷随机性模拟元件的计算分析,提出了2000年华东电网调峰电源技术上的需要容量及经济的开发容量。通过对各类调峰电源的技术、经济特性比较,从全系统经济的角度分析了解决调峰问题的途径及措施。

In this paper using a systematic evaluationmethod in which the pumped-storage power station is included,the planning and operation analysis for peak regulating power station of Shanghai power system in 2000 is described. The results show that significant economy and reliability can be achieved by installing gas turbine plants forpeak load regulation in such a pure thermal system as inShanghai. Valuable conclusions are obtained by further analysis and comparison between the single-cycle and combinedcycle...

In this paper using a systematic evaluationmethod in which the pumped-storage power station is included,the planning and operation analysis for peak regulating power station of Shanghai power system in 2000 is described. The results show that significant economy and reliability can be achieved by installing gas turbine plants forpeak load regulation in such a pure thermal system as inShanghai. Valuable conclusions are obtained by further analysis and comparison between the single-cycle and combinedcycle gas turbine plants.

本文应用一个含抽水蓄能电站的系统评价模型及软件,对上海电网2000年调峰电源进行了优化基础上的规划运行分析。文中提出,像上海电网这样的纯火电系统建设燃气轮机解决调峰问题,具有极大的经济性和可靠性。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关peak regulating的内容
在知识搜索中查有关peak regulating的内容
在数字搜索中查有关peak regulating的内容
在概念知识元中查有关peak regulating的内容
在学术趋势中查有关peak regulating的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社