助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   coordinating 在 电力工业 分类中 的翻译结果: 查询用时:0.171秒
图标索引 在分类学科中查询
所有学科
电力工业
经济体制改革
政党及群众组织
非线性科学与系统科学
建筑科学与工程
教育理论与教育管理
水利水电工程
经济法
自动化技术
更多类别查询

图标索引 历史查询
 

coordinating
    很抱歉,暂未找到该词条在当前类别下的译词。您可以查看在所有学科下的译词。
相关语句
  “coordinating”译为未确定词的双语例句
    Studies on the expert system for setting and coordinating protective relaying in 110~500kV power networks
    110~500kV电网继电保护整定计算专家系统研究
短句来源
    Application of the expert system for setting and coordinating protection in Sichuan power networks
    继电保护整定计算专家系统在四川电网的应用
短句来源
    Discussion on the issues of starting external recloser by protection WXH-25(S) coordinating with CSL-101A
    WXH-25S和CSL-101A保护配合共同起动外部重合闸的问题探讨
短句来源
    Power Grid Coordinating Protection with Multi-Agent
    基于Multi-Agent的电网协同保护
短句来源
    Using the example-WSCC 9 power system (Western Systems Coordinating Council 9) , the effect of proportion of wind power is studied.
    阵风扰动和故障扰动下的风电场电压变化。 利用PSASP自带的WSCC 9(Western Systems Coordinating Council 9)节点系统,分析了风力发电容量在电力系统中所占比例过大对电力系统的稳定运行带来的影响。
短句来源
更多       
查询“coordinating”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  coordinating
The structure of the complex shows a novel coordination of the trifluoroacetate (TFA) anions, with one anion acting as a monodentate ligand while the second one coordinating through both oxygens to the same Mn center.
      
Ca2+ facilitated more humic acid adsorption than Mg2+; UV-Vis spectra analysis indicated higher capabilities of Ca2+ coordinating with acidic functional groups of humic acid than that of Mg2+.
      
The problem of coordinating the interests of different hierarchical levels by "internal taxation" of the middle control level was stated and solved.
      
They differed in the number and properties of substrateand inhibitor-coordinating active sites.
      
Triphenylmethyl salts of the very weakly-coordinating borate anions [CN{B(C6F5)3}2]- (1), [H2N{(C6F5)3}2]- and [M{CNB(C6F5)3}4]2- (M = Ni, Pd) have been prepared in simple one-pot reactions.
      
更多          


While coordinating insulation for a high voltage marine power system, it is extremely important for the neutral point to be handled properly.

船舶高压电力系统中性点的处理是绝缘配合中一个很重要的问题.本文讨论了中性点的处理原则,在设计船舶电力系统时应该全面考虑这些原则.无论从经济、技术及安全方面着眼,选择适当的中性点处理方法,都是十分必要的.文中比较详细地分析了间歇性电弧接地的机理,同时对影响过电压产生的参数也进行了讨论.

This paper presents the urgency and importance of studying electricity pricing.The necessity of coordinating the interests of the nation、the electricity utilities and the electricity consumers is discussed.Proposals for improving the current tariffs and further carrying out pricing investigation are presented too in this paper.

本文论述电价问题研究的紧迫性和重要性。阐明电价政策要处理好国家、电力企业和电力用户之间的关系。提出完善电价制度及进一步开展电价问题研究的建议。

In this paper, network approach has been used in the computation of the economic scheduling for cascaded hydro station in electrcal power system. The problem of coordinating hydro station with thermal subsystem variable-head, variable-efficiency, spillage and the constraits in aspect of water all have been solved. The algorithm of minimal cost -maximal flow has been improved. The algorithms of searching shortest path according to the characters of the network model and increamental searching with variable...

In this paper, network approach has been used in the computation of the economic scheduling for cascaded hydro station in electrcal power system. The problem of coordinating hydro station with thermal subsystem variable-head, variable-efficiency, spillage and the constraits in aspect of water all have been solved. The algorithm of minimal cost -maximal flow has been improved. The algorithms of searching shortest path according to the characters of the network model and increamental searching with variable step have been presented. The computation given to Longxi River (four cascades), Yellow River Liu. Yan. Ba. (three cascades), Yongding River (four cascades)., Maotiao River (six casca -des) and Hongshui River (eleven cascades) shows that this algorithm is obviously advantageous over others in computational speed and availability for complex model. The algorithm makes it possible to compute economic scheduling of cascaded hydro station with microcomputer in high speed. The computational results are shown in Tab.1 and 2. The program using this algorithm has been applied in the economic scheduling of Jing. Jin. Tang. Electrical Power System.

本文应用网流法实现了电力系统梯级水电站的经济调度计算,解决了梯级水电站与火电系统的协调配合、变水头,变效率、弃水和水利约束等方面的问题,改进了最小费用最大流和最短路径的算法,并提出了变步长的微增搜索方法。通过对四川龙溪河(四级)、黄河上游的刘盐八(三级)、华北永定河(四级)和贵州猫跳河(六级)等梯级水电站的试算表明:这一算法在计算速度和对复杂模型的适应能力上均明显优于其它算法。1985年5月已将本算法编制的永定河梯级水电站经济调度程序用于京津唐电力系统日经济调度。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关coordinating的内容
在知识搜索中查有关coordinating的内容
在数字搜索中查有关coordinating的内容
在概念知识元中查有关coordinating的内容
在学术趋势中查有关coordinating的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社