助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   hydroelectric station construction 的翻译结果: 查询用时:0.007秒
图标索引 在分类学科中查询
所有学科
环境科学与资源利用
水利水电工程
更多类别查询

图标索引 历史查询
 

hydroelectric station construction
相关语句
  水电站建设
     Environmental Impact Evaluation Based on Entropy Weight and Application in Hydroelectric Station construction Scheme Optumum Selection
     基于熵权的环境影响评价及在水电站建设方案优选的应用
短句来源
     Middle the former hydroelectric station construction, the gravity dam mostly chooses on new and the complete rock mass, the rock mass quality is high.
     以往的水电站建设当中,重力坝大都选择在新鲜和完整程度好的岩体上,岩体质量较高。
短句来源
     The given example shows that the optimum selection of hydroelectric station construction schemes in view of environmental impact making use of information entropy theory to assess synthetically is rational and feasible.
     示例表明,利用熵权理论进行环境影响综合评价,从环境影响的角度对水电站建设方案进行优选是合理、可靠的。
短句来源
  “hydroelectric station construction”译为未确定词的双语例句
     How Can the Hydroelectric Station Construction Enterprises Break Away with the Low Tide
     水电施工企业如何走出低谷问题
短句来源
     Guanyinyan hydroelectric station as a main point which links up as the Yangtze River middle reaches and the downstream water, will construct on the bedded rocks body which soft and hard rock alternate with, also the layers are multitudinous, gage distortion,has not constructed the high concrete dam in the domestic and foreign hydroelectric station construction on this kind of dam base before.
     观音岩水电站作为金沙江中游与下游河段相衔接的大型水电工程,将修建在一套软硬相间的层状岩体上,且层位众多,厚薄不一,在国内外水电建设当中尚无在此类坝基上修建高混凝土坝的先例。
短句来源
     In order to ascertain stress behavior of steel lined reinforced concrete pipe accurately,according to the fundamental principle of non-linear computation of reinforced concrete elements,the steel lined reinforced concrete penstock on downstream dam surface in a hydropower station is calculated and analyzed,and the distribution of circumferential stress of the steel lined reinforced concrete pipe is obtained,it proves that it is safe and reasonable to use structures of steel lined reinforced concrete penstock in hydroelectric station construction,and can satisfy the requirement of project.
     为了能够准确地把握钢衬钢筋混凝土管的受力性能,根据钢筋混凝土单元非线性计算的基本原理,对某水电站钢衬钢筋混凝土坝后背管进行了计算分析,得出了钢衬钢筋混凝土管环向应力的分布情况,分布情况说明了此水电站采用钢衬钢筋混凝土坝后背管的结构形式是安全合理的,可以满足工程要求.
短句来源
  相似匹配句对
     The Station
     人生的车站
短句来源
     The Station
     车站
短句来源
     DEMOLITION OF CONCRETE CONSTRUCTION IN THE HYDROELECTRIC STATION
     水电建筑群的混凝土拆除
短句来源
     The Feature of Hydroelectric Power Station and It's Equipment
     水电站的特点及其机电设备——对泰安抽蓄电站开发方式的探讨
短句来源
     The units choose of Longtan hydroelectric station
     龙潭水电站机组选择
短句来源
查询“hydroelectric station construction”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  hydroelectric station construction
Earthworks at the Inguri hydroelectric station construction site
      
Kapchagai hydroelectric station construction-operation spillway
      
The paper considers the importance and the necessity of engineering geological observation, control and investigation in the period of hydroelectric station construction and operation.
      


Many hydroelectric station construction enterprises are now in a low tide they have ever seen since the founding of the P.R. of China.The paper analyised the reasons of low profit of the enterprises due to shortage of contracts and insufficient investment in hydroelectric construction. Tnis is the result of a wrong idea that hydroelectric construction needs longer time and larger investment than thermal power station. The paper cited a series of facts to illustrate the damaging...

Many hydroelectric station construction enterprises are now in a low tide they have ever seen since the founding of the P.R. of China.The paper analyised the reasons of low profit of the enterprises due to shortage of contracts and insufficient investment in hydroelectric construction. Tnis is the result of a wrong idea that hydroelectric construction needs longer time and larger investment than thermal power station. The paper cited a series of facts to illustrate the damaging effect the wrong idea has brought about. The paper proposed measures to change the government's investment policy and give priority to the construction of hydrop ower in China.

随着国民经济发展的需要,我国的电力建设投资逐年增加。而其中的水电建设投资却逐年削减,致使专业性很强的水电施工企业严重窝工、恶性循环,全行业处于建国以来最不景气的低谷时期。这种局面,是长期误认为水电建设投资大、周期长,投资过分向火电偏移的政策造成的。其实,从水、火、核电的全系统建设比较,水电单位投资不高,工期不长,运行成本最低,且可综合利用。如此,应该调整电力建设投资政策,重点开发我国丰富的、可再生的水力资源,加快水电建设步伐。其时,我国的这支经验丰富、善打硬仗、任重道远的机械化施工专业队伍,自然随之兴旺起来。

The project of China〃Lubuge Hydro-electric Station〃diversion system,bid and con-structed by Japan Dacheng Company,with a highquality,high velocity and low cost,wins a great rep-utation in the hydroelectric station construction his-tory of China. The paper introduces the quality con-trol and management experience of Japan DachengCompany in the alkaline production for the refer-ence of the colleagues.

由日本大成建设株式会社夺标承建的我国“鲁布革水电站”引水系统工程,以优质、高速、低耗的成绩载入我国水电站建设的史册。本文介绍大成公司在砼生产中的质量控制和砼生产的管理经验,供同行参考。

The Xiluodu formation is hard and fragile, contains interlayer and intrastratal faults, and is of comparatively great grindability. According to these specific characteristics, the diamond bit crown and its sintering technology are studied in particular. As a result, a type of hot pressed, impregnated diamond bit has been developed to meet the needs of increasing the drilling efficiency and shortening the time limit for drilling construction for the sake of the accomplishment of hydroelectric station...

The Xiluodu formation is hard and fragile, contains interlayer and intrastratal faults, and is of comparatively great grindability. According to these specific characteristics, the diamond bit crown and its sintering technology are studied in particular. As a result, a type of hot pressed, impregnated diamond bit has been developed to meet the needs of increasing the drilling efficiency and shortening the time limit for drilling construction for the sake of the accomplishment of hydroelectric station construction.

根据溪洛渡地层硬、脆且存在层间层内错动、裂隙发育和较强研磨性的特点 ,着重就金刚石钻头胎体和烧结工艺进行研究 ,研制出热压孕镶金刚石钻头 ,以提高钻进效率 ,缩短钻探施工工期 ,保证电站施工顺利进行

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关hydroelectric station construction的内容
在知识搜索中查有关hydroelectric station construction的内容
在数字搜索中查有关hydroelectric station construction的内容
在概念知识元中查有关hydroelectric station construction的内容
在学术趋势中查有关hydroelectric station construction的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社