comprehensive temperature control
相关语句
  综合控温
     COMPREHENSIVE TEMPERATURE CONTROL TECHNOLOGY APPLIED IN LARGE STOREHOUSE
     高大平房仓综合控温储粮技术探讨
短句来源
  综合温控
     Through project example,the temperature monitoring of mass concrete and application of comprehensive temperature control measures in engineering construction of mass concrete were introduced.
     通过工程实例 ,介绍了大体积混凝土的温度监测及综合温控措施在大体积混凝土工程施工中的应用。
短句来源
     Through common efforts made by all sides participating in the Three Gorges Project construction, these comprehensive temperature control and crack prevention measures were implemented in an all-round way, achieving expected results to avoid formation of harmful Penetrating cracks in restrained zones of the dam foundation and create favorable conditions for fulfilling the annual plan of concrete placement.
     通过三峡工程参建各方共同努 力,全面实施综合温控防裂措施,达到了预期效果,避免了大坝基础约束区产生危害性贯穿裂缝,并为顺利完成 混凝土年度计划和形象面貌创造了有利条件。
短句来源
     The Design institute of the Changjiang Water Resources Commission conducted a monographic study on concrete placement in restrained zones of the dam foundation in the hot season of the year 1999. Through emulation study on temperature stresses in the concrete dam and through analysis of the effects of temperature control measures, the Design Institute put forward comprehensive temperature control and crack prevention measures for concrete to be placed in restrained zones of the dam foundaton in summer.
     长江委设计院 对1999年高温季节浇筑大坝基础约束区混凝土进行了专题研究。 通过对大坝温度应力仿真研究和夏季各种 温控措施效果分析,提出了夏季浇筑基础约束区混凝土的综合温控防裂措施。
短句来源
     Therefore,the simulation calculation and comparison on the temperature field and the stress field of temperature creeping for many temperature control schemes are made with the application of the 3-D finite element simulative analysis software,and then a set of effective measures for comprehensive temperature control is optimized and two temperature control schemes are put forward for the application to the project; with which the problem of temperature and crack control of the anchorage block during the construction of Sangequan Siphon Project is solved satisfactorily.
     为此,应用三维有限元温度场和温度徐变应力场仿真分析软件进行了多方案的仿真计算和比较,优选了一套行之有效的综合温控防裂措施,提出了两个温控方案并应用于该工程,比较好地解决了三个泉倒虹吸进口镇墩结构的温控防裂问题。
短句来源
     Comprehensive temperature control is applied for the construction of Baise RCC main dam, which provide the basic condition for monthly grouting strength of 150000~160000 m~3, rendering significant economic and social benefit including cost decrease by 28.4952 million yuan and shorter construction period.
     百色水利枢纽RCC主坝采用综合温控措施 ,创造了月浇筑强度 15~ 16万m3的基本条件 ,节约资金 2 3 0 0万元 ,争取了工期 ,经济效益和社会效益显著
短句来源
更多       
查询“comprehensive temperature control”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


In the year 1999, the focal points of the Three Gorges Project construction were turned from earth-rock excavation into larg-scale concrete placement. Builders faced a serious situation of high concrete placement intensity, urgent schedule, strict requirements for temperature control design, concrete placement in restrained zones of foundation in hot seasons, delayed deployment of construction equipment. The Design institute of the Changjiang Water Resources Commission conducted a monographic study on concrete...

In the year 1999, the focal points of the Three Gorges Project construction were turned from earth-rock excavation into larg-scale concrete placement. Builders faced a serious situation of high concrete placement intensity, urgent schedule, strict requirements for temperature control design, concrete placement in restrained zones of foundation in hot seasons, delayed deployment of construction equipment. The Design institute of the Changjiang Water Resources Commission conducted a monographic study on concrete placement in restrained zones of the dam foundation in the hot season of the year 1999. Through emulation study on temperature stresses in the concrete dam and through analysis of the effects of temperature control measures, the Design Institute put forward comprehensive temperature control and crack prevention measures for concrete to be placed in restrained zones of the dam foundaton in summer. Through common efforts made by all sides participating in the Three Gorges Project construction, these comprehensive temperature control and crack prevention measures were implemented in an all-round way, achieving expected results to avoid formation of harmful Penetrating cracks in restrained zones of the dam foundation and create favorable conditions for fulfilling the annual plan of concrete placement.

1999年,为三峡工程二期施工阶段由开挖为主转入混凝土浇筑高峰期的关键一年,面临混凝土浇筑强度 高、进度紧、温控设计要求严、高温季节浇筑基础约束区混凝土和施工设备投产晚的严峻局面。长江委设计院 对1999年高温季节浇筑大坝基础约束区混凝土进行了专题研究。通过对大坝温度应力仿真研究和夏季各种 温控措施效果分析,提出了夏季浇筑基础约束区混凝土的综合温控防裂措施。通过三峡工程参建各方共同努 力,全面实施综合温控防裂措施,达到了预期效果,避免了大坝基础约束区产生危害性贯穿裂缝,并为顺利完成 混凝土年度计划和形象面貌创造了有利条件。

According to the conditions of the design and construction plan of the Longtan high RCC gravity dam in China,the authors in this paper carried out the 3D finite element emulative analysis of the temperature field and thermal stress field of the dam during a long time cease of concrete placement and a worst cold wave strike. In line of the results a 60day long downtime couldn't directly causes the cracks in the dam,even if the cease location has been selected at the worst elevation of 262 m. But if any thermal...

According to the conditions of the design and construction plan of the Longtan high RCC gravity dam in China,the authors in this paper carried out the 3D finite element emulative analysis of the temperature field and thermal stress field of the dam during a long time cease of concrete placement and a worst cold wave strike. In line of the results a 60day long downtime couldn't directly causes the cracks in the dam,even if the cease location has been selected at the worst elevation of 262 m. But if any thermal control measure will not be adopted before the cold wave comes,the dam must definitely be cracked by the strike of the cold wave,especially on both of the upstream and downstream surfaces of the dam. The most concerned head split cracks might take place inevitably. After the numerical calculation of the dam stresses under the conditions of using different thermal saving covers for the dam,the authors want here to suggest that the parts of the dam surfaces should be covered by thermal saving plastic plates with a thickness of 2.5 cm at an appropriate time before the low temperature season comes. Finally,taking into account the results calculated,one needs comprehensive temperature control and cracking prevention measures for the dam,in order to grantee that the dam will not be cracked.

结合龙滩高碾压混凝土重力坝的设计和施工组织安排,进行了坝体最不利长间歇仓面和在长间歇期间遭遇坝区最大一次寒潮冷击的坝体温度应力的三维有限元仿真计算。计算结果表明,在不利高程262m仓面长间歇不会导致混凝土裂缝的产生;但是,如不采取任何温控措施,寒潮冷击必然会给坝体上下游面带来破坏性的影响,比如坝上游面劈头缝的产生。经对寒潮来临前采取不同保温措施的温度应力计算分析,建议在低温季节来临前就应适时采取2 5cm厚的泡沫塑料板进行坝体表面保温。另外,龙滩大坝还需采取综合性的温控防裂措施,以确保大坝不裂。

The concrete works for the Three Gorges double-way & five-step shiplock made features of complicated structure, high technical requirements and were a tough job. It was very difficulty to arrange the vertical transport for concrete placement, especially for placement of thin wall lining of chambers. Furthermore, the chamber concrete was generally in strong restraint or restraint areas with high temperature control and crackproof requirements. Oversize and overweigh miter gates for head chamber resulted in difficulties...

The concrete works for the Three Gorges double-way & five-step shiplock made features of complicated structure, high technical requirements and were a tough job. It was very difficulty to arrange the vertical transport for concrete placement, especially for placement of thin wall lining of chambers. Furthermore, the chamber concrete was generally in strong restraint or restraint areas with high temperature control and crackproof requirements. Oversize and overweigh miter gates for head chamber resulted in difficulties in lifting and installation with high precision requirements. The layout of gantries and tower cranes was optimized. Single-side slip formwork and turn-over slip formwork, and comprehensive temperature control and crackproof techniques were applied successfully to concrete construction of lined walls. In erection of miter gates, optimized survey control and installation positions, and sound lifting and weld procedures ensured quality and progress of installation.

三峡船闸混凝土结构复杂,技术要求高,施工难度大,混凝土垂直运输布置困难,特别是闸室薄壁衬砌墙浇筑方案复杂,同时闸室混凝土基本为强约束区和约束区,温控防裂要求高;闸首超大人字门安装吨位大,技术难度大、精度要求高。武警水电部队在施工中精心设计、精心施工,混凝土浇筑通过优化门塔机布置,采用了闸室衬砌墙单侧滑模和滑框倒模技术,以及综合温控防裂技术,并取得成功,人字门安装采取测量控制优化、安装位置优化,以及制定合理的吊装和焊接技术方案,确保了安装质量和进度。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关comprehensive temperature control的内容
在知识搜索中查有关comprehensive temperature control的内容
在数字搜索中查有关comprehensive temperature control的内容
在概念知识元中查有关comprehensive temperature control的内容
在学术趋势中查有关comprehensive temperature control的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社