助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   不密实 的翻译结果: 查询用时:0.864秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

不密实
相关语句
  not dense
     We shall have an introduction and an analysis to the reason,the prevention measures and the treatment methods of the strength error,incompact surface,not dense rolling,bad trimming and crack of cement stabilized base course.
     介绍、分析了水泥稳定基层强度偏差、表面松散、碾压不密实、平整度差、裂缝的产生原因、预防措施及处理办法。
短句来源
  less dense
     of pores from capillary with better interconnection and pore spaces with less dense structure during construction, etc. , the soluble type corrosion of environmental water for Ca(OH) 2 substance will be mainly the relatively concentrated leakage pattern, which is rather unfavored to anti-chemical corrosion.
     指出在具较好连通性的毛细孔及施工不密实孔等部位 ,环境水对于Ca(OH) 2 一类物质的溶出型侵蚀作用将以相对集中的渗漏方式为主 ,因而对于大坝的抗化学侵蚀性较为不利 ;
短句来源
  not compact densely
     It is shown by analysis that the cracks in concrete lining of the tunnel through Shenhe and Shaoling highlands of heihe project are caused synthetically by construction cold joints, concrete contraction, not compact densely and load.
     分析了神禾塬、少陵塬隧洞混凝土衬砌裂缝是施工冷缝、混凝土收缩、振捣不密实和荷载作用等因素综合影响的结果。
短句来源
  “不密实”译为未确定词的双语例句
     It can not only make the quality of concrete filled in steel tubes obtain the guarantee to solve the problem of drying shrinkage and creep of concrete,but also solve the problem that the concrete is restrained insufficiently.
     将其应用于钢管混凝土内,不仅可以解决钢管混凝土浇注不密实,混凝土干缩、徐变等问题,而且还可以解决自应力混凝土约束不足的问题.
短句来源
     Combined with constructive practice of highway project,it analyzes common problems in hollow board prefabrication from aspects of over thickness in bottom of prefabricated hollow board、under thickness in top of the board and thin concrete in bottom of the board and puts forward effective resolving measures.
     结合多年高速公路工程施工实践 ,针对空心板预制中的常见问题 ,从预制空心板底板超厚、顶板厚度不足、空心板底混凝土不密实等方面进行了原因分析 ,并提出了有效的解决措施。
短句来源
     Considering the gap between steel lining and concrete lining as the imperfect contact,contact layer is proposed to simulate the gap in the combined work analysis.
     针对这种不密实接触问题,采用厚壁圆环组合环法,提出了在钢衬和混凝土之间设置接触层的钢衬、混凝土衬圈和围岩三者联合受力分析方法。
短句来源
     (2)Under the operation case, considering the gap between steel lining and concrete lining as imperfect contact, contact layer is proposed to simulate the gap in the combined work analysis.
     (2)基于对钢衬与混凝土衬圈之间不密实接触的考虑,提出在钢衬和混凝土之间设接触层进行钢衬、混凝土衬圈和围岩联合受力分析。 通过联合受力的解析推导,进行钢衬和围岩压力分担比对接触层参数(弹模和厚度)敏感性分析。
短句来源
     If there are lacunas or holes in concrete structure, it will affect the supportability and endurance of concrete structure seriously.
     混凝土结构内部若存在不密实区或空洞等缺陷,必然会严重影响结构的承载能力和耐久性。
短句来源
更多       

 

查询“不密实”译词为其他词的双语例句

     

    查询“不密实”译词为用户自定义的双语例句

        我想查看译文中含有:的双语例句
    例句
    为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
      not dense
    Obviously, the GPS levelling points are not dense enough to produce a national levelling reference surface.
          
    The image of the Torelli map from the moduli space of real genus 3 curves to the moduli space of real principally polarized abelian varieties of dimension 3 is not dense.
          
    Together with recent conjectures by mathematicians it appears that rational conformal theories are not dense in the space of all conformal theories, and sometimes appear to be finite in number for Calabi-Yau n-folds for n>amp;gt;2.
          
    However, R=RI itself is in general not dense in RMod.
          
    Typical examples of dense rings are (arbitrary) products of matrix rings, whereas any commutative ring ≠0 is not dense.
          
    更多          
      less dense
    Characteristic of such convection is the "regime with neutral buoyancy," in which the growth in the buoyancy associated with the heat release is compensated by a reduction due to the ascent to less dense layers of the medium.
          
    The problem of the shape and stability of a heavy drop retained on the surface of a less dense liquid by capillary forces is solved numerically and analytically in the plane and three-dimensional variants.
          
    In this area, the brine experienced density stratification, with the influx of both condensed brine from the central part of the basin and less dense brine from the inlet.
          
    Inhomogeneity of the medium makes the shell thicker and less dense, while an increase in the compression ratio of the medium at the shock front causes the shell to become thinner and denser.
          
    When the component-mass ratio substantially exceeds unity (the case in RZ Sct), the flow forms a large, dense accretion disk and less dense outer envelope.
          
    更多          


    The major problem in the application of underground plastic pipe on farm land is that the pipe would be filled up with sludge easily. Both siltation control and technique of washing sludge were good methods to prolong the service life of pipe and improve its efficiency. The data from our field experiments showed that the pipe siltation was related to certain factors such soil texture, pipe size and filtration layer. When backfill wasn't sufficiently close to the pipe wall, soll particle could flow into the pipe...

    The major problem in the application of underground plastic pipe on farm land is that the pipe would be filled up with sludge easily. Both siltation control and technique of washing sludge were good methods to prolong the service life of pipe and improve its efficiency. The data from our field experiments showed that the pipe siltation was related to certain factors such soil texture, pipe size and filtration layer. When backfill wasn't sufficiently close to the pipe wall, soll particle could flow into the pipe with rain or irrigation water. In addition, the lighter soil texture was, the more severe the pipe siltation would be. The pipe siltation also was related to the hole size of pipe, it was no problem if the hole size of pipe used was less than 1. 1mm.Being a filter material, rice chaff was much more effective than rice straw. Rice chaff could be used as main filter material in rice belt.The authors have initiateda technique of pumping water into the top of underground plastic pipe, which was led out over surface, to wash away sludge in the pipe. It only takes 15 minutes to wash away half amount of sludge in the pipe, this efficiency is 10 times higher than that of self-flow washing method.

    塑料暗管在农田使用中易于淤塞失效。为了延长其使用寿命和提高经济效益,合理设滤与有效的冲淤是非常重要的。经研究,塑料暗管的淤积与土壤、管子、滤层等因素有关。其中主要是回填土不密实或土壤质地轻,稳定性差,土粒易随水渗流入管造成淤积。试验说明塑料暗管的孔宽<1.1mm亦能较好防淤;稻谷壳比稻草防淤效果高83.3%。因此,稻谷壳可作为水稻产区的主要滤料。我们将塑料暗管从灌渠旁引出地面,用泵引渠水冲淤,15分钟可冲出管中淤泥的一半(约4.8—11.3kg),相当于开塞自流放水冲淤效果的十倍。

    The bulkhead line of the Yellow River dike is long and the geological condition of dike foundation iscomplicated.Main geological problems include seepage deformation,liquidation,settlement,non-uniform set-tlement and other problems.There are problems in the dike,such as complicated earth and other materials,insufficient compaction,potential troubles,and low flood control level.So dike strengthening plays an im-portant role in flood control in the lower Yellow River.The strengthening measures include pumping...

    The bulkhead line of the Yellow River dike is long and the geological condition of dike foundation iscomplicated.Main geological problems include seepage deformation,liquidation,settlement,non-uniform set-tlement and other problems.There are problems in the dike,such as complicated earth and other materials,insufficient compaction,potential troubles,and low flood control level.So dike strengthening plays an im-portant role in flood control in the lower Yellow River.The strengthening measures include pumping waterto soak dike to make it solid,pressure grouting,warping,hydraulic strengthening,pressure reduction,seep-age diversion and under ground seepage cut-off.These strengthening measures have generated obvious bene-fits.In the future,introduction and spreading of new materials and new technology should be strengthened,research and experiment of technology for detecting hidden troubles should be enforced.In order to increaseengineering benefits including ecnomic benefit,hydraulic strengthening measure should be combined withthe disposal of sediment in diverting water from the Yellow River to remove disasters and generate benefits.

    黄河大堤堤线较长,堤基地质情况复杂,主要工程地质问题有渗透变形、液化、沉降与不均匀沉降以及老口门等,堤身存在着土料复杂、碾压不密实、隐患多、防洪标准低等问题,因此堤防加固在黄河下游防洪工程中占有重要地位。加固措施有抽水洇堤、压力灌浆、放淤及吹填固堤、减压及导渗、地下截渗等,并已取得显著效果。今后还应大力开展新材料、新技术的引进推广工作,加强隐患探测技术的研究试验,积极推进吹填固堤与引黄泥沙相结合、除害兴利并举的办法,以提高堤防加固的工程效益和经济效益。

    This paper introduces how to the pavement thickness、embankment fill etc.with geology radar.

    地质雷达无损检测不仅能准确地检测高速公路面层厚度,帮助工程单位提高施工质量,同时可以探测路基填土不密实、填土脱空、基层与路基土之间脱空、原状地基土下洞穴等病害隐患,为病害诊治提供可靠依据。

     
    << 更多相关文摘    
    图标索引 相关查询

     


     
    CNKI小工具
    在英文学术搜索中查有关不密实的内容
    在知识搜索中查有关不密实的内容
    在数字搜索中查有关不密实的内容
    在概念知识元中查有关不密实的内容
    在学术趋势中查有关不密实的内容
     
     

    CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
    版权图标  2008 CNKI-中国知网
    京ICP证040431号 互联网出版许可证 新出网证(京)字008号
    北京市公安局海淀分局 备案号:110 1081725
    版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社