助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   and marshall test 的翻译结果: 查询用时:0.184秒
图标索引 在分类学科中查询
所有学科
公路与水路运输
更多类别查询

图标索引 历史查询
 

and marshall test
相关语句
  马歇尔试验
     Proportioning design of asphalt mixtures and Marshall test
     沥青混合料组成设计与马歇尔试验
短句来源
  相似匹配句对
     (v) test;
     第五章为测试过程;
短句来源
     Test
     测试
短句来源
     The Characteristics of the Marshall Test Curves
     马歇尔试验曲线特性分析
短句来源
     Large Scale Marshall Compaction Test Study
     大型马歇尔击实试验研究
短句来源
     Proportioning design of asphalt mixtures and Marshall test
     沥青混合料组成设计与马歇尔试验
短句来源
查询“and marshall test”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Based on systematic research on mixture design method of large stone asphalt treated permeable base,grading of large stone asphalt treated permeable base has been brought forward,and initial optimum asphalt content has been ascertained using Schellenberg Binder Drainage test,Cantabro test and Marshall test.Then with moisture susceptibility test,high temperature behaviour test and fatigue behaviour test,optimum asphalt content has been ascertained.

对大粒径碎石沥青稳定排水基层混合料设计方法进行系统研究,提出排水性大粒径碎石沥青稳定基层级配,通过析漏试验、飞散试验和马歇尔试验确定最初沥青用量,并通过水稳定性试验、高温性能试验和疲劳性能试验,确定最佳沥青用量。

Asphalt mixture production with good quality not only depends on a good objective proportion design,but also decides on production proportion design and adjusting.Through a highway rutrepairing engineer project several issues of production proportion adjustment are discussed such as transporting material through cold material storehouse,vibrant sieve setting and Marshall test.A conclusion is maken that only these steps attached importance can the test data reliability be increased and can the control...

Asphalt mixture production with good quality not only depends on a good objective proportion design,but also decides on production proportion design and adjusting.Through a highway rutrepairing engineer project several issues of production proportion adjustment are discussed such as transporting material through cold material storehouse,vibrant sieve setting and Marshall test.A conclusion is maken that only these steps attached importance can the test data reliability be increased and can the control production run level be improved.

一个好的目标配合比只是生产高质量沥青混合料的前提,好的设计能否在生产中落实还取决于生产配合比设计及验证。结合某高速公路车辙专项处治工程对生产配合比调整过程中的几个常见问题,如冷料仓上料速度、振动筛布设、马歇尔试验等进行论述。只有重视了这些环节才能增加试验数据的可信度,提高其数据对于生产过程的控制水平。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关and marshall test的内容
在知识搜索中查有关and marshall test的内容
在数字搜索中查有关and marshall test的内容
在概念知识元中查有关and marshall test的内容
在学术趋势中查有关and marshall test的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社