   high rcc dam 的翻译结果: 查询用时:0.189秒
图标索引 在分类学科中查询
所有学科
水利水电工程
更多类别查询

图标索引 历史查询
 

high rcc dam
相关语句
  rcc高坝
     The risk to construct a high RCC dam is much higher than that to construct a medium sized or low RCC dam due to the differences between their loads and resistances, the designing of the high RCC dam is also different.
     由于在荷载和抗力等诸方面的差异,RCC高坝的建设风险远高于中、低坝,尤其是200m级的高坝。 因此,与中低坝相比,高坝的设计要求也将有所不同。
     In this paper, the special requirements for design of high RCC dam such as design principles, method and criterion of safety evaluation, dam materials, structure design, construction technology and control were brought forward, for the sake of providing helpful suggestions for the design and construction of high RCC dam.
     本文就高碾压混凝土重力坝在设计原则、安全评价方法与标准、筑坝材料、构造设计、施工工艺和质量控制等方面的特殊要求进行了探讨,以期为RCC高坝的设计和施工提供有价值的参考。
  高碾压混凝土坝
     Study on the Key Technical Issues in Construction of High RCC dam of Longtan Project
     龙滩高碾压混凝土坝施工关键技术研究
短句来源
     Research on the rapid construction scheme for the Longtan high RCC dam
     龙滩高碾压混凝土坝快速施工方案研究
短句来源
     The study results have important practical values in the course of high RCC dam's unremitting construction.
     研究结果对高碾压混凝土坝的连续、快速施工具有实际应用价值。
短句来源
     Based on the scheduled construction progress of high RCC dam in Longtan hydropower station, the 3D FEM is used to simulate and calculate the temperature field and stress field during construction and operation stages of the RCC dam, thereby revealing the changing laws of temperature fields and stress fields under different placing temperatures during summer season.
     根据龙滩高碾压混凝土坝拟定的施工进度安排 ,进行了该坝施工期和运行期温度场和应力场的仿真计算 ,揭示了夏季不同浇筑温度时 ,坝体温度场和应力场的变化情况。
短句来源
     On the basis of analysis of the simulation theory for pipe cooling in RCC dam,an equivalent algorithm for pipe cooling is put forward,which is appropriate to be applied in the simulation analysis of high RCC dam using universal program of ANSYS.
     在碾压混凝土坝冷却水管模拟计算理论的分析基础上,提出适合于运用大型Ansys结构程序对高碾压混凝土坝进行仿真分析的水管冷却等效算法。
短句来源
  高碾压混凝土重力坝
     In this paper, the special requirements for design of high RCC dam such as design principles, method and criterion of safety evaluation, dam materials, structure design, construction technology and control were brought forward, for the sake of providing helpful suggestions for the design and construction of high RCC dam.
     本文就高碾压混凝土重力坝在设计原则、安全评价方法与标准、筑坝材料、构造设计、施工工艺和质量控制等方面的特殊要求进行了探讨,以期为RCC高坝的设计和施工提供有价值的参考。
     Study on thermal compensation method for high RCC dam constructed with the admixture of MgO
     掺氧化镁混凝土建造高碾压混凝土重力坝的温度补偿计算方法
短句来源
     It provides important reference for Longtan high RCC dam design and construction.
     为龙滩高碾压混凝土重力坝设计和施工提供了重要的参考依据。
短句来源
  “high rcc dam”译为未确定词的双语例句
     Application of high RCC dam construction technology in frigid region to Longshou Hydropower Station
     高寒地区碾压混凝土筑坝技术在龙首水电站的应用
短句来源
     Study on the Seepage Control Techniques of High RCC Dam
     碾压混凝土高坝防渗工艺研究
短句来源
     The Idea About Making Dentate Lift Joint in the Construction of High RCC Dam
     高坝碾压混凝土凹凸层缝法筑坝的设想
短句来源
     The new structure has been considered as the main type of high RCC dam located in middle southern China.
     坝体上部采用变高度分横缝的悬臂梁式结构。
短句来源
     The research results enhance the construction level of high RCC dam in our country and bring the benefits to the construction of some similar projects.
     其研究成果的应用可以提高我国高碾压混凝土拱坝的施工水平 ,也可为其它类似工程的施工提供参考与借鉴
短句来源
更多       
查询“high rcc dam”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The safety (stability) problem,ability of taking shear force,at the bottom pant of dam and within rock foundation usually happens in a RCC (roller compacted concrete) gravity dam over hundred meters (height). A structural improvement, integrated structure with artificial short joints to make a plan arch in the lower part of dam and decreased height of upper cantilever with inclined toward up stream bottom,was suggested. The new structure has been considered as the main type of high...

The safety (stability) problem,ability of taking shear force,at the bottom pant of dam and within rock foundation usually happens in a RCC (roller compacted concrete) gravity dam over hundred meters (height). A structural improvement, integrated structure with artificial short joints to make a plan arch in the lower part of dam and decreased height of upper cantilever with inclined toward up stream bottom,was suggested. The new structure has been considered as the main type of high RCC dam located in middle southern China. The results of actual simulation calculation,creep stresses of accumulated temperature and self weight during construction, stresses of thermal drop and hydraulic pressure during operation,show the evidently advantages in stress-stability of the dam by improved measurements in structure mentioned above.

因坝高百米以上的碾压混凝土重力坝往往存在坝体下部抗剪能力和基岩内稳定安全度不足的问题,所以作者探讨一种结构改进措施:坝体下部采用不分永久性横缝只设人工短缝的整体式结构;坝体上部采用变高度分横缝的悬臂梁式结构。通过对我国中南地区某工程实例的仿真应力计算,即施工期的温度场和温度与累计自重徐变压力,运行期温度场和温差应力的计算,其结果表明,采用上述结构改进措施是有明显效果的。

The dam of Jiangya project is a 128 m-high roller compacted concrete(RCC) gravity dam in terms of its full cross-section. In order to ensure the construction quality and meet the design requirement, a set of rather perfect construction technologies for RCC has been set up, resulting in good construction quality. During construction, new construction approaches were opened up in the light of the demand of the project, and corresponding technological practice was conducted in several...

The dam of Jiangya project is a 128 m-high roller compacted concrete(RCC) gravity dam in terms of its full cross-section. In order to ensure the construction quality and meet the design requirement, a set of rather perfect construction technologies for RCC has been set up, resulting in good construction quality. During construction, new construction approaches were opened up in the light of the demand of the project, and corresponding technological practice was conducted in several aspects, which not only achieved good results but also enriched content of the RCC construction, and accumulated available experiences in construction of high RCC dams.

江垭枢纽大坝是一座131m高的全断面碾压混凝土重力坝。为了确保施工质量采用斜层平推铺筑方法进行RCC施工,提高混凝土质量,发挥RCC施工优势,并适应高温多雨气候条件和满足设计要求,建立了一套比较完善的RCC施工工艺,取得了比较好的施工质量。施工中根据工程需要开辟了新的施工途径,并在许多方面进行工艺实践,不但取得了良好的效果,同时也丰富了碾压混凝土筑坝施工内容,积累了高碾压混凝土坝施工的有益经验。

A number of technical problems have to be tackled for building the barrage dam of the proposed Longtan hydroelectric project because it will be built in the high ambient temperature area of the southern China and the highest RCC gravity dam(216.5m high) in the world.During the eighth and ninth five years plan,main studies ever address the technical key problem to construct high roller compacted concrete(RCC)gravity dam in high ambient temperature area.Some...

A number of technical problems have to be tackled for building the barrage dam of the proposed Longtan hydroelectric project because it will be built in the high ambient temperature area of the southern China and the highest RCC gravity dam(216.5m high) in the world.During the eighth and ninth five years plan,main studies ever address the technical key problem to construct high roller compacted concrete(RCC)gravity dam in high ambient temperature area.Some practical results have been achieved through the scientific and technical studies.These results will ensure the soundness of building this high RCC dam.This paper outlines the studies in the issues.

拟建的龙滩水电站拦河坝是在我国南方高气温地区建造的世界上最高的碾压混凝土(RCC)重力坝(坝高2165m),需解决许多科技难题。“八五”、“九五”期间主要针对在高气温环境中建造高碾压混凝土重力坝的关键技术问题进行了研究,已取得了一批切实可用的科研成果,这些成果是建设该高RCC重力坝的有力保证。本文要点地介绍了这些科研成果。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关high rcc dam的内容
在知识搜索中查有关high rcc dam的内容
在数字搜索中查有关high rcc dam的内容
在概念知识元中查有关high rcc dam的内容
在学术趋势中查有关high rcc dam的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社