reinforced concrete pillars
相关语句
  钢筋混凝土立柱
     CHAMBER EXPLOSION TO DEMOLISH THE I-SHAPED REINFORCED CONCRETE PILLARS IN A SPACIONS WORKSHOP
     药室爆破拆除工字型钢筋混凝土立柱大车间
短句来源
     The Demolition of Reinforced Concrete Pillars in Complex Environment by Directional Blasting
     复杂环境下钢筋混凝土立柱的定向爆破拆除
短句来源
  “reinforced concrete pillars”译为未确定词的双语例句
     Grey Correlation Degree Analysis of Experimental Blasting for Reinforced Concrete Pillars
     钢筋混凝土柱爆破实验的灰关联分析
短句来源
     BREAK MECHANISM AND PROTECT CONSOLIDATION OF REINFORCED CONCRETE PILLARS OF FACTORY BUILDING
     钢筋混凝土工业厂房柱的破损机理与防护加固
短句来源
     A Way of Strengthening the Reinforced Concrete Pillars
     钢筋混凝土柱的一种加固方法
短句来源
     The anti-sheared capacity research of secondly-surrounding brackets in reinforced concrete pillars
     钢筋砼柱二次环抱牛腿抗剪承载力研究
短句来源
     The mechanism of damage of reinforced concrete pillars of factory building, reinforced bar's rust and concrete broken, are stated and analyzed, the reasonable measures of protect and consolidation proposed.
     对钢筋混凝土工业厂房柱的破损即钢筋锈蚀和混凝土损伤机理进行了阐述,并提出相应的防护措施及加固方法。
短句来源
更多       
  相似匹配句对
     The Corrosion of Reinforced Concrete and Its Prevention
     钢筋混凝土的腐蚀与防护
短句来源
     The Analyses of the Reinforced Concrete of Durability
     钢筋砼结构的耐久性分析
短句来源
     concrete;
     混凝土;
短句来源
     Reliability Design for Pillars
     矿柱结构的可靠性设计
短句来源
     and 4)sutra pillars.
     (4)经幢.
短句来源
查询“reinforced concrete pillars”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house. In the construction, for the large landslide sections in the diversion tunnel, the upper half tunnel would be lined first and the lower side wall would be treated by the reinforced concrete pillar wall and anchorage shotcrete support, which ensures the achievement of river closure on schedule in 1994, the flood retaining by the dam and the construction of loam...

The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house. In the construction, for the large landslide sections in the diversion tunnel, the upper half tunnel would be lined first and the lower side wall would be treated by the reinforced concrete pillar wall and anchorage shotcrete support, which ensures the achievement of river closure on schedule in 1994, the flood retaining by the dam and the construction of loam core wall cofferdam during winter season. In the technical construction stage, a new rock yard has been recommended in order to provide the reliable guarantee for the normal construction of the dam on scheme. The excavation of dam foundation has been conducted from the bottom to top and by zones and stages. The construction road access to the dam has been arranged by stages and by zones. The rock material has been filled during the frost season. A construction drift for water diversion system has been increased to quicken the construction progress of diversion tunnel.

小山水电站工程由钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。在施工中导流洞大塌方采取先衬砌上半洞,下部边墙用钢筋混凝土柱墙及锚喷支护处理,保证了1994年按期实现了大江冰期截流和大坝挡汛、壤土心墙围堰冬期施工。在技施阶段重新推荐堆石料场,为大坝正常按期填筑提供了可靠保证。坝基开挖采取自下向上分层分阶段开挖施工;上坝施工路分期分层布置,堆石料冰冻季节填筑。增设了引水系统施工支洞,加快了引水隧洞施工进度。发电厂房基坑混凝土浇筑在1995年入冬前仍处在河水位以下,河床渗水比较严重(12m3/h),经充水越冬保温,取得了成功。

In this paper,the authors change the abnormal distributed variables into the normal distributed variables by using Rackwits Fiessler method,and obtain the model of the structural optimization design based on reliability standard.This model is based on the limit state design philosophy.This paper adopts the chance constraint programming method and changes the model into an equal deterministic nonlinear design problem.At last,an example of reliability optimization design of the reinforced concrete pillar...

In this paper,the authors change the abnormal distributed variables into the normal distributed variables by using Rackwits Fiessler method,and obtain the model of the structural optimization design based on reliability standard.This model is based on the limit state design philosophy.This paper adopts the chance constraint programming method and changes the model into an equal deterministic nonlinear design problem.At last,an example of reliability optimization design of the reinforced concrete pillar with the minimum cost is given.

利用雷—菲法把非正态变量转换为当量正态变量,建立了在多个任意分布基本变量情况下的可靠性结构优化设计数学模型。该模型以极限状态设计方法为基础,采用机遇约束规划方法变换为一个等价确定性非线性规划问题。最后给出了设计价格最小的矩形截面钢筋混凝土柱的可靠性优化设计实例。

The mechanism of damage of reinforced concrete pillars of factory building, reinforced bar's rust and concrete broken, are stated and analyzed, the reasonable measures of protect and consolidation proposed.

对钢筋混凝土工业厂房柱的破损即钢筋锈蚀和混凝土损伤机理进行了阐述,并提出相应的防护措施及加固方法。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关reinforced concrete pillars的内容
在知识搜索中查有关reinforced concrete pillars的内容
在数字搜索中查有关reinforced concrete pillars的内容
在概念知识元中查有关reinforced concrete pillars的内容
在学术趋势中查有关reinforced concrete pillars的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社