助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   cost intensity 的翻译结果: 查询用时:0.164秒
图标索引 在分类学科中查询
所有学科
水利水电工程
更多类别查询

图标索引 历史查询
 

cost intensity
相关语句
  浇筑强度
     The paper determines the maximum optimization cast intensity of roller compacted concrete in Jiangya dam project by multipurpose blur comprehensive judgment technology and arrangement analysis method, gives a convenient, rapid, scientific decision method for determining the maximum cost intensity of roller compacted concrete under the circumstance of comprehensive consideration of project time and installation investment restriction.
     本文采用多目标模糊综合评判技术及层次分析方法确定江垭大坝优化的碾压混凝土最高浇筑强度,综合考虑了工程有效工期及设备投资的约束,为预测碾压混凝土最高浇筑强度提供了一种方便、快捷、科学合理的决策方法。
短句来源
  相似匹配句对
     cost.
     在资金的组织上,把主要精力放在低成本存款上。
短句来源
     Objective:Decreasing ferment cost,saving labour intensity.
     目的:降低发酵成本,减轻劳动强度。
短句来源
     It is significant for mills to reduce cost and workers' working intensity.
     使用该产品对纺纱厂降低成本,减轻工人劳动强度具有较大意义。
短句来源
     low cost.
     低的1/f噪声;
短句来源
     The intensity of stresses(?)
     并计算了应力强度(?)
短句来源
查询“cost intensity”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  cost intensity
Warehouses have overall lower illumination requirements as well as lower cost intensity than other building types.
      
The lower cost intensity is mainly because less space conditioning is needed than in most other buildings.
      
Laboratories have a high energy cost intensity that can be used to justify more efficient, energy-saving systems.
      
In general, as energy cost intensity increases, energy-efficient design strategies become more cost-effective.
      
Energy cost intensity is the annual cost of energy used per square foot.
      


The paper determines the maximum optimization cast intensity of roller compacted concrete in Jiangya dam project by multipurpose blur comprehensive judgment technology and arrangement analysis method, gives a convenient, rapid, scientific decision method for determining the maximum cost intensity of roller compacted concrete under the circumstance of comprehensive consideration of project time and installation investment restriction.

本文采用多目标模糊综合评判技术及层次分析方法确定江垭大坝优化的碾压混凝土最高浇筑强度,综合考虑了工程有效工期及设备投资的约束,为预测碾压混凝土最高浇筑强度提供了一种方便、快捷、科学合理的决策方法。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关cost intensity的内容
在知识搜索中查有关cost intensity的内容
在数字搜索中查有关cost intensity的内容
在概念知识元中查有关cost intensity的内容
在学术趋势中查有关cost intensity的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社