助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   multistage graph problem 的翻译结果: 查询用时:0.198秒
图标索引 在分类学科中查询
所有学科
计算机软件及计算机应用
更多类别查询

图标索引 历史查询
 

multistage graph problem
相关语句
  多段图问题
     Algorithm of the Time-constrained Multistage Graph Problem
     基于带时间约束的多段图问题的回溯算法
短句来源
     Another Solution to Multistage Graph Problem Based on Water Channel Principium
     基于水槽原理的多段图问题的另一种解法
短句来源
     :The time-constrained multistage graph problem is one spread out from the multistage graph problem.In this paper the means of expression of recursion set and the backtrace technique are introduced into the path selection in the time-constrained multistage graph,by which the minimum cost for the tourist path is worked out through calculation in a given time.
     基于带时间约束的多段图问题多段图问题的自然扩展。 该文带时间约束的多段图的路径选择,引入了递归集合的表示方法和回溯技术,在给定时间条件下计算出了最小成本的旅游路径。
短句来源
     This is to say, according to the flowing situation of water flow, this paper sums up its features and simitrdes compared with multistage graph problem, then defines a special water and gives another algorithm.
     也即是根据水流在水槽中的流动情况,归纳出其特点,将其与多段图的特点进行对比分析,得出相同点,然后利用其性质定义了一种特定性质的水流,提出了多段图问题的另一种解法。
短句来源
  多段图
     Algorithm of the Time-constrained Multistage Graph Problem
     基于带时间约束的多段图问题的回溯算法
短句来源
     Another Solution to Multistage Graph Problem Based on Water Channel Principium
     基于水槽原理的多段图问题的另一种解法
短句来源
     :The time-constrained multistage graph problem is one spread out from the multistage graph problem.In this paper the means of expression of recursion set and the backtrace technique are introduced into the path selection in the time-constrained multistage graph,by which the minimum cost for the tourist path is worked out through calculation in a given time.
     基于带时间约束的多段图问题是多段图问题的自然扩展。 该文带时间约束的多段图的路径选择,引入了递归集合的表示方法和回溯技术,在给定时间条件下计算出了最小成本的旅游路径。
短句来源
     software engineering management is a problem of making decisions in each phase serially, has the character of multistage graph problem in dynamic planning algorithm.
     它是一个多阶段决策问题,具有动态规划算法中多段图的特点。
短句来源
     This is to say, according to the flowing situation of water flow, this paper sums up its features and simitrdes compared with multistage graph problem, then defines a special water and gives another algorithm.
     也即是根据水流在水槽中的流动情况,归纳出其特点,将其与多段图的特点进行对比分析,得出相同点,然后利用其性质定义了一种特定性质的水流,提出了多段图问题的另一种解法。
短句来源
查询“multistage graph problem”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


:The time-constrained multistage graph problem is one spread out from the multistage graph problem.In this paper the means of expression of recursion set and the backtrace technique are introduced into the path selection in the time-constrained multistage graph,by which the minimum cost for the tourist path is worked out through calculation in a given time.

基于带时间约束的多段图问题是多段图问题的自然扩展。该文带时间约束的多段图的路径选择,引入了递归集合的表示方法和回溯技术,在给定时间条件下计算出了最小成本的旅游路径。

No matter theoretical research or practical application have both made great achievementsfor software engineering, gradually formed three key factors: methods, tools and management. However these three key factors have developed unparallel. Compared to methods and tools, the theoretical research or practical application of management lagged. It becomes a critical influence factor in the development of software engineering. The essential characters of software engineering management is that how to optimally allocate...

No matter theoretical research or practical application have both made great achievementsfor software engineering, gradually formed three key factors: methods, tools and management. However these three key factors have developed unparallel. Compared to methods and tools, the theoretical research or practical application of management lagged. It becomes a critical influence factor in the development of software engineering. The essential characters of software engineering management is that how to optimally allocate capitals, time, labors to each phase in the life cycle of software engineering so as to obtain high quality software. software engineering management is a problem of making decisions in each phase serially, has the character of multistage graph problem in dynamic planning algorithm. As a result, dynamic planning algorithm is applied in software engineering management in this paper.

软件工程学科在理论研究和实践应用中都取得了巨大成就,逐渐形成了方法、工具和管理三大要素。然而,这三要素的发展是不均衡的,相对于方法和工具,管理的理论研究和科学应用都显得滞后,已经成为软件工程学科发展的瓶颈问题。软件工程管理的本质是如何在软件工程生命周期的各个阶段最佳地配置人员、资金和时间三种资源,以取得软件质量最优化。它是一个多阶段决策问题,具有动态规划算法中多段图的特点。文中将动态规划算法应用到软件工程管理的决策之中。

Traditional solutions to multistage graph problem are based on comparison. Enlightened by water channel principium, this paper tries to solute the problem in another way. This is to say, according to the flowing situation of water flow, this paper sums up its features and simitrdes compared with multistage graph problem, then defines a special water and gives another algorithm. In the end, the nature and applicable scope of the algorithm are discussed.

针对多段图问题的传统的基于比较的算法,受水槽原理启发,尝试从另外一种途径解决这个问题。也即是根据水流在水槽中的流动情况,归纳出其特点,将其与多段图的特点进行对比分析,得出相同点,然后利用其性质定义了一种特定性质的水流,提出了多段图问题的另一种解法。最后,讨论了此算法的本质和适用范围。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关multistage graph problem的内容
在知识搜索中查有关multistage graph problem的内容
在数字搜索中查有关multistage graph problem的内容
在概念知识元中查有关multistage graph problem的内容
在学术趋势中查有关multistage graph problem的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社