助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   risk analysis methodology 的翻译结果: 查询用时:0.15秒
图标索引 在分类学科中查询
所有学科
地质学
工业通用技术及设备
更多类别查询

图标索引 历史查询
 

risk analysis methodology
相关语句
  风险分析方法
     Preliminarily Study on the Risk Analysis Methodology for Landsilde
     滑坡地质灾害风险分析方法
短句来源
     The Research of the Layered Risk Analysis Methodology in Information System of an Enterprise
     层次化的企业信息系统风险分析方法研究
短句来源
     In this paper, based on the characteristics of large engineering project,the risk analysis method for large engineering projects is systematically studied, the shortcomings of existing risk analysis methodology are analysed.
     结合大型工程建设项目风险特点,对大型工程项目动态风险分析方法进行了系统研究。
短句来源
  “risk analysis methodology”译为未确定词的双语例句
     Fracture failure risk analysis methodology and application for pressure piping system containing defects (Ⅰ)——based on PD 6493 theory and methodology
     含缺陷压力管系断裂失效风险分析系统(Ⅰ)——基于PD6493的理论及方法
短句来源
     This thesis analyzes the causes of financial outsourcing services' risk, the risk types and risk events by using the strategic risk analysis methodology.
     文章利用战略风险的理论和分析方法,对导致金融服务外包风险的因素、风险类型以及风险事件进行了详细的阐述。
短句来源
     The risk analysis methodology for landslide from the viewpoint of risk distinguishing,risk estimating and risk evaluation is discussed.
     从风险辨识、风险估算和风险评价三个方面对滑坡地质灾害进行风险分析所采用的方法作了探讨
短句来源
  相似匹配句对
     Portfolio Risk Analysis
     证券组合风险的分析
短句来源
     Analysis of concept of risk
     风险概念分析
短句来源
     Analysis of G.
     G.
短句来源
     analysis.
     分析表明,其单糖组成为Glc。
短句来源
     On Q Methodology
     Q方法论述评
短句来源
查询“risk analysis methodology”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  risk analysis methodology
An occupant risk analysis methodology was developed to study the sequence of activities of the disabled people.
      
The security project and risk analysis methodology were implemented to the quality management too.
      
The design of risk analysis methodology is the important part for ISMS.
      
There are numerous precedents in regulatory practice for standardization of risk analysis methodology and decision criteria.
      
Risk analysis methodology, which was design by team, was implemented in the company as part of quality management too.
      
更多          


A reliability and risk analysis methodology is developed for airframe components under scheduled inspection and repair maintenance in service. It is assumed that critical locations in the airframe components are fastener holes,of which the initial fatigue quality(IFQ)is repre- sented by the equivalent initial flaw size(EIFS).a fastener hole must be repaired when a crack is detected. after repair,the fatigue quality of the airframe components is assumed to be renewed,in the sense that the flaw size distribution...

A reliability and risk analysis methodology is developed for airframe components under scheduled inspection and repair maintenance in service. It is assumed that critical locations in the airframe components are fastener holes,of which the initial fatigue quality(IFQ)is repre- sented by the equivalent initial flaw size(EIFS).a fastener hole must be repaired when a crack is detected. after repair,the fatigue quality of the airframe components is assumed to be renewed,in the sense that the flaw size distribution of the repaired fastener holes is identical to that of the new fastener hole. In this analysis,many quantities involving statistical variabilities have been taken into account,for instance,the initial fatigue quality,crack propagation,residual strength,ervice loading,crack detection probability,etc. A numerical example for the wing main spar of some fighter is given. The numerical results show that the developed analysis methodology is applicable.

在全面考虑影响结构破坏危险性多种主要随机因素的基础上,重点研究了将定期检查时查出的破损结构修复并重新投入使用情况下的结构破坏危险性分析方法。建立了相应的分析模型,并以某型国产歼击机机翼主梁为例,给出了分析计算结果。结果表明:对于长寿命飞机结构,在使用后期,忽略修复并重新投入使用的结构将是偏危险的。

In this paper, based on the characteristics of large engineering project,the risk analysis method for large engineering projects is systematically studied, the shortcomings of existing risk analysis methodology are analysed. A new method called time series support is originally presented to structure risk influence diagrams.A dynamic criterion is supposed based on the separable nature of value function.With this criterion, we combine influence diagrams with dynamic economic assessment. Thus the dynamic...

In this paper, based on the characteristics of large engineering project,the risk analysis method for large engineering projects is systematically studied, the shortcomings of existing risk analysis methodology are analysed. A new method called time series support is originally presented to structure risk influence diagrams.A dynamic criterion is supposed based on the separable nature of value function.With this criterion, we combine influence diagrams with dynamic economic assessment. Thus the dynamic risks for large engineering projects are evaluated.At the endof the paper, the risk of a certain large-sized water conservancy project is analysed.

结合大型工程建设项目风险特点,对大型工程项目动态风险分析方法进行了系统研究。分析和评价了目前风险分析存在的问题与不足,提出了一种根据时间序列构造风险分析影响图模型的方法。并且对影响图中的超价值结点概念与价值函数可分解性进行了讨论,针对超价值结点特性,将影响图与动态经济评价相对合,提出了大型工程项目动态风险分析方法。最后,以某大型水利工程为案例进行了应用研究,证明了方法的有效性

In this paper, based on the characteristics of the oil and gas exploration project, the risk analysis method is systematically studied. Firstly we analyze the shortcomings of existing risk analysis methodologies, set forth the further research direction in this field. Then the influence diagram algorithms are presented based on fuzzy set theory. At last, the risks of a certain oil and gas exploration project are analyzed. The procedures and contents to structure and evaluate profit influence...

In this paper, based on the characteristics of the oil and gas exploration project, the risk analysis method is systematically studied. Firstly we analyze the shortcomings of existing risk analysis methodologies, set forth the further research direction in this field. Then the influence diagram algorithms are presented based on fuzzy set theory. At last, the risks of a certain oil and gas exploration project are analyzed. The procedures and contents to structure and evaluate profit influence diagram are studied in the light of the reality. By means of the practical application, the effectiveness and feasibility of the methods are verified.

根据油气资源勘探项目的特性,分析了现存风险分析方法的不足,指出了该领域进一步研究的方向.基于模糊集理论建立了影响图算法,结合实例阐述了该方法的具体应用,对油气资源勘探项目风险的辨识、风险影响图构造、风险知识的获得与风险评价做了详细研究,证明了方法的有效性和可行性.

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关risk analysis methodology的内容
在知识搜索中查有关risk analysis methodology的内容
在数字搜索中查有关risk analysis methodology的内容
在概念知识元中查有关risk analysis methodology的内容
在学术趋势中查有关risk analysis methodology的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社