助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   time for completion 的翻译结果: 查询用时:0.22秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

time for completion
相关语句
  “time for completion”译为未确定词的双语例句
     According to Primary Design Report of Changzhou Project, the time for completion of the first generator will be 3 years and 8 months (44 months), and the time for the completion of the entire project will be 5 years and 10 months (70 months). However, for the nation is in power supply shortage to a large range at present, the Employer requires designers to research further on Project Completion Time and the time for production in advance.
     在初步设计报告中安排首台机组发电工期3年8个月(44个月),总工期5年10个月(70个月),业主要求设计在缩短工期,提前发电等方面做进一步研究,以缓解目前全国出现的大范围的电力供需紧张局面,尽早产生效益。
短句来源
     (2)The water maze testing: the time for completion of whole swimming journey and the number of error reactions in diabetic mice with injection of APP17 peptide was not significantly different from those in the control mice, but significantly different from that in diabetic mice without injection.
     (2)神经行为学检查:给予APP17 肽的糖尿病小鼠游完全程的时间及错误反应的次数均较未给予APP17肽的糖尿病小鼠减少,而与正常对照组差异无显著性;
短句来源
     In this paper,the feature of the extension of time for completion is analysised,treating method on the extension is presented accor ding to the conditionsof FIDIC
     本文分析了工程延期的性质 ,提出了监理工程师按FIDIC条款处理工程延期的一般方法。
短句来源
     In order to help our country's engineering field get familiar with the variation mechanism in the new red book issued by the FIDIC in 1999 and raise their variation management level, the definition and principles of the variations are first analyzed in this paper. Then, the procedure of the variations is summed up. Finally, the adjustment principles and methods of the time for completion and the contract price in the case of the variations are discussed.
     为了帮助我国工程界尽快熟悉FIDIC于1999年出版的新红皮书中的工程变更机制,提高工程变更管理水平,分析新红皮书中工程变更的定义和原则,归纳工程变更的程序,讨论工程变更时竣工时间和合同价格的调整原则和方法。
短句来源
     The goal is to minimize the aggregate time for completion of these m orders.
     目标是寻找一个使得m份订单的完工时间之和最小的加工顺序.
短句来源
更多       
  相似匹配句对
     Time
     时间(英文)
短句来源
     Time
     时间
短句来源
     IT'S TIME FOR BREAKFAST!
     该吃早餐了!
短句来源
     Time for Practices
     “够了,让我们实践吧”之二 实践的时代到了
短句来源
     b)the principle of completion;
     完备性原则 ;
短句来源
查询“time for completion”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  time for completion
When a multicomponent filler metal composition (Ni14 wt pct Cr-10 wt pct P) is used, the time for completion of dissolution exceeds that when using a simple binary filler metal composition.
      
Pass-through patterns, in terms of speed and time for completion, were found to vary from region to region.
      
The finding that the mean score was relatively high for most questionnaire items suggested that the majority of activities in the curriculum were perceived by students as interesting and easy and having sufficient time for completion.
      
The structural phase transitions were of first-order and required long time for completion.
      
Parameters of interest were "score" and "time for completion of task".
      
更多          


Objective To observe the function of learning and memory and the immunohistochemical change of hippocampus in diabetic mice and the protective effects of APP17 peptide from diabetes. Methods Mouse diabetic model was produced with streptozotocin and APP17 peptide as a protective agent was injected subcutaneously into diabetic mice. Four weeks later, water maze test was performed. After water maze test, fixative was injected intravascularly into the mice , brain was removed for preparation of cryostat sections,...

Objective To observe the function of learning and memory and the immunohistochemical change of hippocampus in diabetic mice and the protective effects of APP17 peptide from diabetes. Methods Mouse diabetic model was produced with streptozotocin and APP17 peptide as a protective agent was injected subcutaneously into diabetic mice. Four weeks later, water maze test was performed. After water maze test, fixative was injected intravascularly into the mice , brain was removed for preparation of cryostat sections, and immunohistochemical stain was done with neurotrophin 3 (NT 3),choline acetyltransferase antibodies. Results (1)The blood glucose level in diabetic mice with injection of APP17 peptide 〔(28 91±3 21)mmol/L〕was not significantly different from that in diabetic mice without injection 〔(29 21±3 52)mmol/L〕, but significantly higher than that in the control mice〔(9 41±0 74)mmol/L〕( P <0 01).(2)The water maze testing: the time for completion of whole swimming journey and the number of error reactions in diabetic mice with injection of APP17 peptide was not significantly different from those in the control mice, but significantly different from that in diabetic mice without injection. (3)Immunohistochemical change in hippocampus: the number of positive staining neuron and staining greyscale of NT 3 in diabetic mice with injection of APP17 peptide 〔(90 41±15 42)and (56 25±4 95)separately〕 was not significanly different from those in the control mice 〔(88 75±4 16) and (60 92±5 47)separately〕,but significantly different from those in diabetic mice without injection〔(61 71±13 41) and (89 48±13 48)separately〕( P <0 01).The number of positive staining neuron and staining greyscale of choline acetyltransferase in diabetic mice with injection of APP17 peptide 〔(10 31±3 71) and (82 40±17 74)separately〕was not significantly different from those in control mice 〔(12 24±3 28) and (79 40±15 34)separately〕, but significantly different from those in diabetic mice without injection〔(5 24±0 87) and (106 38±10 76)separately〕( P <0 05). Conclusion APP17 peptide improves the function of learning and memory of diabetic mice probably by means of NT 3 neuron secretion.

目的 观察糖尿病小鼠学习记忆功能及脑海马内神经营养因子NT-3、胆碱乙酰化酶神经元表达的变化,并观察APP17 肽(APP319~335)对上述指标的影响。 方法 用链脲佐菌素(Streptozotocin,STZ)诱发糖尿病小鼠模型,并皮下注射APP17 肽,4 周后行水迷宫试验;其后对小鼠进行灌注固定,取小鼠脑海马冰冻切片免疫组化染色。 结果 (1)糖尿病小鼠与给予APP17 肽的糖尿病小鼠的血糖差异无显著性,分别为(29.21±3.52)、(28.91±3.21)m m ol/L,但明显高于正常对照组(P< 0.01);(2)神经行为学检查:给予APP17 肽的糖尿病小鼠游完全程的时间及错误反应的次数均较未给予APP17肽的糖尿病小鼠减少,而与正常对照组差异无显著性;(3)神经免疫组织化学实验:给予APP17肽的糖尿病小鼠与对照组的NT-3 阳性细胞数〔分别为(90.41±15.42)和(88.75±4.16)个〕及染色灰度〔分别为(56.25±4.95)和(60.92±5.47)〕差异无显著性,但与糖尿病小鼠〔分别为(61.71±13.41)个、(89.48±13.48)〕差异有显著性(P< 0.01...

目的 观察糖尿病小鼠学习记忆功能及脑海马内神经营养因子NT-3、胆碱乙酰化酶神经元表达的变化,并观察APP17 肽(APP319~335)对上述指标的影响。 方法 用链脲佐菌素(Streptozotocin,STZ)诱发糖尿病小鼠模型,并皮下注射APP17 肽,4 周后行水迷宫试验;其后对小鼠进行灌注固定,取小鼠脑海马冰冻切片免疫组化染色。 结果 (1)糖尿病小鼠与给予APP17 肽的糖尿病小鼠的血糖差异无显著性,分别为(29.21±3.52)、(28.91±3.21)m m ol/L,但明显高于正常对照组(P< 0.01);(2)神经行为学检查:给予APP17 肽的糖尿病小鼠游完全程的时间及错误反应的次数均较未给予APP17肽的糖尿病小鼠减少,而与正常对照组差异无显著性;(3)神经免疫组织化学实验:给予APP17肽的糖尿病小鼠与对照组的NT-3 阳性细胞数〔分别为(90.41±15.42)和(88.75±4.16)个〕及染色灰度〔分别为(56.25±4.95)和(60.92±5.47)〕差异无显著性,但与糖尿病小鼠〔分别为(61.71±13.41)个、(89.48±13.48)〕差异有显著性(P< 0.01),给予?

In this paper,the feature of the extension of time for completion is analysised,treating method on the extension is presented accor ding to the conditionsof FIDIC

本文分析了工程延期的性质 ,提出了监理工程师按FIDIC条款处理工程延期的一般方法。

Variations are very common in the process of construction of the large-scale international civil engineering works. In order to help our country's engineering field get familiar with the variation mechanism in the new red book issued by the FIDIC in 1999 and raise their variation management level, the definition and principles of the variations are first analyzed in this paper. Then, the procedure of the variations is summed up. Finally, the adjustment principles and methods of the time for completion...

Variations are very common in the process of construction of the large-scale international civil engineering works. In order to help our country's engineering field get familiar with the variation mechanism in the new red book issued by the FIDIC in 1999 and raise their variation management level, the definition and principles of the variations are first analyzed in this paper. Then, the procedure of the variations is summed up. Finally, the adjustment principles and methods of the time for completion and the contract price in the case of the variations are discussed.

在大型国际土木工程施工过程中,工程变更十分普遍。为了帮助我国工程界尽快熟悉FIDIC于1999年出版的新红皮书中的工程变更机制,提高工程变更管理水平,分析新红皮书中工程变更的定义和原则,归纳工程变更的程序,讨论工程变更时竣工时间和合同价格的调整原则和方法。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关time for completion的内容
在知识搜索中查有关time for completion的内容
在数字搜索中查有关time for completion的内容
在概念知识元中查有关time for completion的内容
在学术趋势中查有关time for completion的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社