助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   chalong hydropower station 的翻译结果: 查询用时:0.196秒
图标索引 在分类学科中查询
所有学科
水利水电工程
电力工业
更多类别查询

图标索引 历史查询
 

chalong hydropower station
相关语句
  查龙水电站
     Embedment of Observation Instrument and Dam Safety Monitoring at the Chalong Hydropower Station
     查龙水电站观测仪器埋设及大坝安全监测
短句来源
     Electrical and Mechanical Design of Chalong Hydropower Station
     查龙水电站的机电设计
短句来源
     Filling of Embankment Dam with Concrete Face Slab at Chalong Hydropower Station in Tibet
     西藏查龙水电站面板坝填筑施工
短句来源
     After check and assessment,construction quality for embankment dam with concrete face slab material filling at chalong Hydropower Station is excellent.
     经检查评定查龙水电站面板坝填筑施工质量属优良水平。
短句来源
     Chalong Hydropower Station is located in northern Tibet Plateau with high elevation and severe cold. The main dam is an embankment dam with concrete face slab at the highest elevation in China.
     查龙水电站位于高海拔严寒的藏北高原,主坝为我国海拔最高的混凝土面板沙砾石坝。
短句来源
更多       
  “chalong hydropower station”译为未确定词的双语例句
     Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.
     查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
短句来源
  相似匹配句对
     Electrical and Mechanical Design of Chalong Hydropower Station
     查龙水电站的机电设计
短句来源
     Embedment of Observation Instrument and Dam Safety Monitoring at the Chalong Hydropower Station
     查龙水电站观测仪器埋设及大坝安全监测
短句来源
     The Station
     车站
短句来源
     The Station
     人生的车站
短句来源
     Construction of Embankment Dam with Concrete Face Slab at Chalong Hydropower Station in Tibet
     西藏查龙水电站混凝土面板施工
短句来源
查询“chalong hydropower station”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Chalong Hydropower Station is built on Naqu River, upstream of Nujiang River,Naqu area of Tibet Autonomus Region with a elevation above sea tevel of 4 350~4 600 m. The average temperature is - 1. 9℃, the extremely tow temperature -41. 2℃, the extremely high temperature 22. 6 ℃,the maximum wind velocity 26 m/s. the average annual wind velocity 2.9 m/s, the average annual precipitation 415 mm, the maximum ice thickness 1. 0 m. It belongs to the plateau and cold climate area with a thin air, serious tack...

Chalong Hydropower Station is built on Naqu River, upstream of Nujiang River,Naqu area of Tibet Autonomus Region with a elevation above sea tevel of 4 350~4 600 m. The average temperature is - 1. 9℃, the extremely tow temperature -41. 2℃, the extremely high temperature 22. 6 ℃,the maximum wind velocity 26 m/s. the average annual wind velocity 2.9 m/s, the average annual precipitation 415 mm, the maximum ice thickness 1. 0 m. It belongs to the plateau and cold climate area with a thin air, serious tack of axygen and heavy dust storm. The dam across river of the station is a rein forced Concrete face rockfill dam. It takes the mechanical excavation as main and manpower excavation as supplementary in the censtruction. The filling materials of dam body is natural Sand-gravel. The filling sequence is firstly bedding materials, secondly filter materials and thirdly rock-fill materials. In the slope compaction, the two static rollings were adopted firstly for stabiliting the slope and then vibrating rolling of 8 times. Reinforced concrete face slab was constructed by the railless sliding form method. When it is cold, the concrete was covered with plastic membrane and then proteeted with a superstratum of grass bags or canvas, which the temperature would increase 3~5 ℃.

查龙水电站位于西藏自治区那曲地区境内怒江上游的那曲河上,海拔高程4250~4600m,平均气温-1.9℃,极端最低气温-41.2℃,极端最高气温22.6℃,最大风速26m/s,年平均风速2.9m/s,平均降水量415mm,最大结冰厚度1.0m,空气稀薄,严重缺氧,风沙大,属高海拔严寒地区,电站拦河主坝为钢筋混凝土面板砂砾石坝,大坝开挖以机械为主,以人工开挖为辅,坝体填筑材料采用天然砂砾石,填筑顺序为,先垫层科,后排水料,再堆石料,其中散方向平行于坝轴线,而两岸接被处则垂直于轴线方向.斜坡碾压是先价压两遍以稳定坡面,然后振动碾压8遍.混凝土面板采用无轨式滑模施工.低温时混凝土采用塑料薄膜遮盖,再加草袋或蓬布后进行保护,温度可提高3~5℃以上.

Chalong Hydropower Station is located in northern Tibet Plateau with high elevation and severe cold. The main dam is an embankment dam with concrete face slab at the highest elevation in China. Seepage control in dam,design of freezing resistance for concrete face slab, new caulking water sealing material and surface coat on face slab are mainly presented.

查龙水电站位于高海拔严寒的藏北高原,主坝为我国海拔最高的混凝土面板沙砾石坝。本文重点介绍坝体渗流控制,混凝土面板抗冻设计,及新型嵌缝止水材料,面板表面涂料的研究。

Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station. Sand and gravel in Wotuo and Jiekekutang borrow areas are explorated to meet the requirements. The best roller compacted parameter is determined by roller compaction test.Filling and roller compaction are carried out strictly in accordance with dam filling techniques. Quality check and control is strictly performed. After check and assessment,construction quality...

Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station. Sand and gravel in Wotuo and Jiekekutang borrow areas are explorated to meet the requirements. The best roller compacted parameter is determined by roller compaction test.Filling and roller compaction are carried out strictly in accordance with dam filling techniques. Quality check and control is strictly performed. After check and assessment,construction quality for embankment dam with concrete face slab material filling at chalong Hydropower Station is excellent.

查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。窝托及吉刻苦堂料场沙砾石料经勘察质量基本符合要求。通过碾压试验确定了最优碾压参数.对填筑料、碾压等严格按照坝体填筑施工技术要求施工并严格进行质量检查与控制。经检查评定查龙水电站面板坝填筑施工质量属优良水平。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关chalong hydropower station的内容
在知识搜索中查有关chalong hydropower station的内容
在数字搜索中查有关chalong hydropower station的内容
在概念知识元中查有关chalong hydropower station的内容
在学术趋势中查有关chalong hydropower station的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社