助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   hydropower station extension 的翻译结果: 查询用时:0.006秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

hydropower station extension
相关语句
  水电站扩建
     Construction features of Huangtankou hydropower station extension project
     黄坛口水电站扩建工程施工特点
短句来源
     The power plant of the Laibin cooling hydropower station extension project was cylindrical, and the upper auxiliary plant and unloading bay were expensed rectangle, being supported by lower plant cylinder and bay.
     来宾冷却水电站扩建工程的发电厂房采用圆筒式厂房,上部副厂房及安装间扩宽成矩形,由下部的厂房筒壁及支承排架支承。
短句来源
  “hydropower station extension”译为未确定词的双语例句
     Welding technology and installation of scroll case for the ~#4 hydraulic turbine in Dongfong Hydropower Station Extension Project
     东风电站扩机工程~#4机蜗壳拼装及焊接工艺
短句来源
  相似匹配句对
     The Station
     人生的车站
短句来源
     The Station
     车站
短句来源
     General Arrangement of Gongboxia Hydropower Station
     公伯峡水电站工程枢纽总布置
短句来源
     Electric Design of Xiaowan Hydropower Station
     小湾水电站电气设计
短句来源
     Extension Design of Nanshao Hydropower Station
     南哨水电站扩建设计
短句来源
查询“hydropower station extension”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


In construction of Huangtankou Extension Project,damming the river was successfully carried by floating gates,technology of succession explosion of internal hole and external hole was adopted to ensure the safety of the existing hydraulic structures,and steel fibre concrete was used in intake construction. Two turbine-generator unitS with capacity of 26 MW each were put into operation within two years. These practices provide design and construction of other hydropower station extension projects with references....

In construction of Huangtankou Extension Project,damming the river was successfully carried by floating gates,technology of succession explosion of internal hole and external hole was adopted to ensure the safety of the existing hydraulic structures,and steel fibre concrete was used in intake construction. Two turbine-generator unitS with capacity of 26 MW each were put into operation within two years. These practices provide design and construction of other hydropower station extension projects with references.

黄坛口水电站扩建施工中应用浮动闸门进行施工截流获得成功,并采用孔内孔外接力式控制爆破技术,确保了原有水工建筑物的安全;此外在进水口施工中采用了钢纤维混凝土新材料。两年内实现2台2.6万kW机组投产发电的目标,为今后水电站扩建增容的设计与施工提供了经验。

The power plant of the Laibin cooling hydropower station extension project was cylindrical, and the upper auxiliary plant and unloading bay were expensed rectangle, being supported by lower plant cylinder and bay. Because of being limited by geomorphy, geology and communication condition, the auxiliary plant and unloading bay deck can't be laid out as the traditional formal. The overhanging model constructing method without support was applied to solve the problems.

 来宾冷却水电站扩建工程的发电厂房采用圆筒式厂房,上部副厂房及安装间扩宽成矩形,由下部的厂房筒壁及支承排架支承。副厂房及安装间平台最大离地高度为40m,平台幅度纵、横梁组成平面梁系,主次梁多达20条,由于受到地形、地质和交通条件所限制,布置复杂,受力较大,副厂房及安装间平台无法按传统方式设置,采用无外支撑吊模施工法,从而解决了这一施工难题。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关hydropower station extension的内容
在知识搜索中查有关hydropower station extension的内容
在数字搜索中查有关hydropower station extension的内容
在概念知识元中查有关hydropower station extension的内容
在学术趋势中查有关hydropower station extension的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社