drawing network graph
相关语句
  网络图绘制
     The Method of Drawing Network Graph Based on BOM/BOP
     基于物料清单/工艺清单的网络图绘制方法
短句来源
     For this purpose, the method of drawing network graph based on BOM/BOP and its implementation is presented in this paper.
     针对这一问题 ,提出了一种基于物料清单 /工艺清单的网络图绘制方法 ,并具体设计与实现了该方法
短句来源
  相似匹配句对
     Pert network drawing
     PERT网络图绘制的研究
短句来源
     Prodecessor Activity Classification for Drawing Arrow Network Graph
     箭线网络图的紧前工序分类法
短句来源
     A Research on the Algorithm of Network Graph Drawing in Network Projecting
     网络计划技术中网络图绘制的算法研究
短句来源
     Improved Prodecessor Activity Classification for Drawing Arrow Network Graph
     改进的紧前工序分类法
短句来源
     Imperfections and Examples of Methods for Drawing Optimal Arrow Network Graph
     几种最优箭线网络图绘制方法的缺陷与示例
短句来源
查询“drawing network graph”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


This paper is concerned with some main problems of PERT that are applied in Yongji electrical machinery factory, such as key links in drawing network graphs: the decomposition of engineering tasks, the construction of network graphs of these tasks based on their logical relations, and the determination of the purpose and method of networks numerical calculation.The optimation of network graphs and the approaches to reduce total duration time, equilibrate, allocate and utilize...

This paper is concerned with some main problems of PERT that are applied in Yongji electrical machinery factory, such as key links in drawing network graphs: the decomposition of engineering tasks, the construction of network graphs of these tasks based on their logical relations, and the determination of the purpose and method of networks numerical calculation.The optimation of network graphs and the approaches to reduce total duration time, equilibrate, allocate and utilize resources are studied and such problems as "How to reduce duration time by way of critical path", "How to save resources by way of non-critical operations" are clarified.Viewing from the unity of sketch plan and executive plan, the paper also expounds the PERT's function and its economical effects with some examples.

本文就PERT在永济电厂应用中的一些主要问题作了论述,如:网络图编制的主要环节,工程的任务分解,各项任务按逻辑关系形成网络图,网络图数值计算的目的和方法.还就网络图的优化,对缩短总工期、资源的统筹、平衡、安排和利用的途径、方法进行了研究,阐明如何“向关键路线要时间”, “向非关键工序要资源”.本文还从轮廓计划和执行计划统一的角度,对功能进行了论述,通过实例论述了经济效果.

The method, which combines CPM(critical path method) with MRP(manufacturing resource planning), can be used to efficiently solve the problems of production management in large-piece OKP(one of a kind production). The most important point of this combination is to create the mapping between tasks' network graph and BOM/BOP. For this purpose, the method of drawing network graph based on BOM/BOP and its implementation is presented in this paper.

网络计划与 MRP结合可以有效地解决大型单件小批混合生产模式企业的生产管理问题。其结合的关键是要建立任务活动网络图与物料清单/工艺清单之间的映射关系。针对这一问题 ,提出了一种基于物料清单 /工艺清单的网络图绘制方法 ,并具体设计与实现了该方法

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关drawing network graph的内容
在知识搜索中查有关drawing network graph的内容
在数字搜索中查有关drawing network graph的内容
在概念知识元中查有关drawing network graph的内容
在学术趋势中查有关drawing network graph的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社