shiban hydropower station
相关语句
  石板水电站
     Analysis of Deformation Observation for Dam of Shiban Hydropower Station
     石板水电站大坝变形监测分析
短句来源
     Analysis on cracking of turbine runner with long and short blades in Shiban Hydropower Station
     石板水电站水轮机长短叶片转轮裂纹分析
短句来源
     Statistical regression analysis of seepage and seepage-pressure of gravity dam foundation of Shiban Hydropower Station
     石板水电站重力坝坝基渗流渗压观测资料的统计回归分析
短句来源
     Based on some measured data of gravity dam of Shiban Hydropower Station, taking into account the influence of water, temperature and time on the seepage and seepage-pressure of dam foundation, a statistical regression analysis model for seepage and seepage-pressure has been established by the stepwise regression analysis method.
     通过对石板水电站重力坝坝基渗流、渗压多年观测数据的统计分析,考虑水位、温度和时效的影响,采用逐步回归分析法建立了坝基渗流、渗压的统计回归分析模型。
短句来源
     The design and implementation of deformation observation for the dam of Shiban Hydropower Station are described A comprehensive analysis of observational data is made The results show that the operational conditon of the dam is reliable and stable
     介绍了石板水电站大坝变形监测的设计与实施情况 ,并根据监测结果进行了全面分析 分析结果表明 ,该大坝的运行是稳定的、可靠的
短句来源
更多       
  相似匹配句对
     Analysis of Deformation Observation for Dam of Shiban Hydropower Station
     石板水电站大坝变形监测分析
短句来源
     Hydropower and China
     水电与中国
短句来源
     Analysis on cracking of turbine runner with long and short blades in Shiban Hydropower Station
     石板水电站水轮机长短叶片转轮裂纹分析
短句来源
     On-the-spot Research on Load-rejection Transient of the Francis Turbine Installation in the Shiban Hydropower Plant
     石板水电站混流式水轮机装置甩负荷过渡过程的现场试验研究
短句来源
     HYDROPOWER AND ELECTRICITY MARKET
     水电与电力市场
短句来源
查询“shiban hydropower station”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The design and implementation of deformation observation for the dam of Shiban Hydropower Station are described A comprehensive analysis of observational data is made The results show that the operational conditon of the dam is reliable and stable

介绍了石板水电站大坝变形监测的设计与实施情况 ,并根据监测结果进行了全面分析 分析结果表明 ,该大坝的运行是稳定的、可靠的

Shiban Hydropower Station has three high head Francis turbines of 35 MW each. The runner is of long and short blades. Since the generating units put into service in 1997,the turbines have good performances in cavitation,abrasion,efficiency and stability. But some cracks at the runner blades are found. The paper analyses the main cracking causes in the aspects of design,manufacture quality and operation. Some proposals for preventing cracking are presented.

石板水电站装有3台35 MW采用长短叶片转轮的高水头混流式水轮机,机组自1997年投入运行以来,水轮机在空化、磨蚀、效率、运行稳定性方面表现出很好的性能,但转轮叶片出现了裂纹。文章从设计、制造质量和运行角度,分析了引起裂纹产生的主要原因,并提出防止裂纹的建议。

Seepage and seepage-pressure are important factors which influence the stability of dam foundation. Based on some measured data of gravity dam of Shiban Hydropower Station, taking into account the influence of water, temperature and time on the seepage and seepage-pressure of dam foundation, a statistical regression analysis model for seepage and seepage-pressure has been established by the stepwise regression analysis method. Computing results indicate that the statistical regression data for seepage...

Seepage and seepage-pressure are important factors which influence the stability of dam foundation. Based on some measured data of gravity dam of Shiban Hydropower Station, taking into account the influence of water, temperature and time on the seepage and seepage-pressure of dam foundation, a statistical regression analysis model for seepage and seepage-pressure has been established by the stepwise regression analysis method. Computing results indicate that the statistical regression data for seepage and seepage-pressure are accordant with measured data; the statistical double correlation coefficients between them are larger; and the estimation standard errors between them are smaller. The statistical regression analysis model efficiently reflects the changing rule and developing trend of seepage and seepage-pressure of dam foundation. This model has provided efficient analysis means for evaluating safety properties of the gravity dam.

渗流、渗压是影响坝基稳定的重要因素。通过对石板水电站重力坝坝基渗流、渗压多年观测数据的统计分析,考虑水位、温度和时效的影响,采用逐步回归分析法建立了坝基渗流、渗压的统计回归分析模型。回归计算结果表明,渗流、渗压统计值与观测值吻合较好,统计复相关系数较大,估计标准误差较小。统计回归分析模型有效地反映了坝基渗流、渗压的变化规律和发展趋势,为评价大坝运行安全性态提供了有效地分析手段和途径。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关shiban hydropower station的内容
在知识搜索中查有关shiban hydropower station的内容
在数字搜索中查有关shiban hydropower station的内容
在概念知识元中查有关shiban hydropower station的内容
在学术趋势中查有关shiban hydropower station的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社