助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   a high pile 的翻译结果: 查询用时:0.157秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

a high pile
相关语句
  相似匹配句对
     The high resistance of A.
     沙冬青的高抗性可能与沙冬青根瘤菌的高抗性有关。
短句来源
     A Pile of Arts
     叠加de艺术
短句来源
     The accident and treatment on pile foundation of a high building
     某高层建筑桩基础事故及其处理
短句来源
     The Design and Construction of a High-rise Building on Pile Foundation
     一幢高层建筑物桩基础的设计与施工
短句来源
     By using hammer method for pile quality is a high effective.
     锤击法在桩基质量检测中是一种行之有效的手段。
短句来源
查询“a high pile”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Focused on the restoration of a high-pile wharf at Xingang, Tianjin, a techo-economical analysis in the respect of repairing cost, required time and service life (after restoration) etc., is carried out. Also the method and cost for repairing the inclined support piles are summarized in this paper.

本文针对天津新港高桩码头的修复工程从修复造价、施工工期、已使用的年限(修复后至今)等方面进行了经济技术分析,并对斜顶桩的修复方法及费用作了总结。

By presenting an overall stability analysis calculation of a high - pile wharf slopebuilt on the soft foundation, this paper illustrates the potential of substantially improving the shearingstress of the soft soil by adopting draining sand for soft foundation consolidation, thus enhancing over-all slope stability. Meanwhile, matters needing attentions during design and construction are also ex-plained.

结合某工程实例对软基上建造高桩码头岸坡进行整体稳定分析计算,说明采用打砂井加固软基,可大大提高软土的抗剪强度,从而提高岸坡的整体稳定。同时也提出在设计与施工中应注意的问题。

There are numerous methods for calculating the bearing capacity of a high pile subjected to a horizontal load. Those meth- ods are not suitably to calculate the large displacement of a high pile under a horizontal load. The behavior of a pile can be re- flected completely by the P-Y curve. A P-Y curve method can be considered as a better one practical method. For single pile in sand, we can employ the P-Y curve that was carried in the American API code (version 17). In a one row pile...

There are numerous methods for calculating the bearing capacity of a high pile subjected to a horizontal load. Those meth- ods are not suitably to calculate the large displacement of a high pile under a horizontal load. The behavior of a pile can be re- flected completely by the P-Y curve. A P-Y curve method can be considered as a better one practical method. For single pile in sand, we can employ the P-Y curve that was carried in the American API code (version 17). In a one row pile group, the displacement of a front pile is close to that of a single pile. Other piles in the one row pile group can be regarded as a back pile. A modified P-Y curve for a back pile in pile group is put forward (see formula (8) in this paper). So, a back pile is calculated as same as a single pile. This procedure may be a reference for designers.

现有水平承载高桩的计算方法(虚拟嵌固点法、联邦德国规范法以及m法)不宜用于大变位水平承载高桩的计算。P-Y曲线法能全面地反映桩的工作性状,可以认为是目前计算大变位水平承载高桩的较好的实用方法。砂土中单桩的P-Y曲线可采用美国API规范17版法。群桩的计算,在多数情况下可从群桩中取出一排桩进行计算。将排桩中的前桩看作单桩,前桩以外的所有桩都按“后桩”处理。一旦前桩的P-Y曲线确定,就可用作者提出的式(8)由前桩的P-Y曲线将土反力修正后得“后桩”的P-Y曲线,按单桩进行后续计算,进而计算群桩承载力。这种计算方法可供有关桩基工程设计时参考使用。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关a high pile的内容
在知识搜索中查有关a high pile的内容
在数字搜索中查有关a high pile的内容
在概念知识元中查有关a high pile的内容
在学术趋势中查有关a high pile的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社