|
|
|
|  | | 为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。 | |
|
|

| | The optimization method of structure parameters for sublevel caving method without floor pillar was discussed in theory, through the success experience of similar mines at home and abroad, and by the practical analysis of Meishan iron mine, it was shown that increasing the stope advance interval for was an effective way to reduce mining costs. | | 从理论上探求了无底柱分段崩落法采矿结构参数的优化方法,并通过国内外同类矿山的成功经验,以及梅山铁矿的实例分析,说明了加大采场进路间距,是降低采矿成本的有效方法。 | | 文摘来源 | |   |
|
相关查询: | |
对查询结果不满意
|
|
|
|