助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   voltage divider system 在 核科学技术 分类中 的翻译结果: 查询用时:0.421秒
图标索引 在分类学科中查询
所有学科
核科学技术
无线电电子学
更多类别查询

图标索引 历史查询
 

voltage divider system
相关语句
  分压系统
    THE NEW VOLTAGE DIVIDER SYSTEM OF THE HI-13 TANDEM ACCELERATOR
    HI-13串列加速器电阻分压系统研制
短句来源
    Study of timing voltage divider system of PMT for neutron wall at CSR terminal
    CSR系统终端中子墙光电倍增管时间型分压系统的应用研究
短句来源
    The new voltage divider system of the HI-13 tandem accelerator is described. The resistor performances and a new design of the resistor protection aseembly are given.
    文章介绍了新研制的HI-13串列加速器电阻分压系统,给出了电阻器性能及其屏蔽组件的新设计。
短句来源
查询“voltage divider system”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The new voltage divider system of the HI-13 tandem accelerator is described. The resistor performances and a new design of the resistor protection aseembly are given. More than 200 new resistor assemblies were tested in the HI-13 tandem accelerator since 1992 with no failures. Their performances are satisfactory.

文章介绍了新研制的HI-13串列加速器电阻分压系统,给出了电阻器性能及其屏蔽组件的新设计。自1992年以来,已有200多个电阻器在HI-13串列加速器上运行考验,无一损坏,其性能令人满意。

The HI 13 tandem accelerator at CIAE has been running for more than ten years since it was put into normal operation in august 1987. The accumulated operation time and beam time is about 40000 and 35000 h, respectively. The machine now is still in good technical condition with highest terminal voltage of 12.7 MV with beam and beam time of more than 3500 h per year in recent years. The completely home made laddertron for the machine has been in operation for near 8000 h with good performance. The original “blue...

The HI 13 tandem accelerator at CIAE has been running for more than ten years since it was put into normal operation in august 1987. The accumulated operation time and beam time is about 40000 and 35000 h, respectively. The machine now is still in good technical condition with highest terminal voltage of 12.7 MV with beam and beam time of more than 3500 h per year in recent years. The completely home made laddertron for the machine has been in operation for near 8000 h with good performance. The original “blue resistors” made by HVEC in the high voltage divider system of the HI 13 tandem accelerator have been completely replaced by the resistors with framework which are completely home made and the performances of the resistors are satisfactory. To meet the requirements of the experiments, five additional beam lines were built up in the past ten years making the total number of the beam lines in the laboratory up to eleven and some other improvements on the machine have also been done.

对HI-13串列加速器十年来的运行、维修与改进工作进行简要总结,给出了有关统计数据,并重点概述了在重大设备国产化和加速器及其相关技术方面的研究工作。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关voltage divider system的内容
在知识搜索中查有关voltage divider system的内容
在数字搜索中查有关voltage divider system的内容
在概念知识元中查有关voltage divider system的内容
在学术趋势中查有关voltage divider system的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社