助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   condition of construction 的翻译结果: 查询用时:0.162秒
图标索引 在分类学科中查询
所有学科
公路与水路运输
更多类别查询

图标索引 历史查询
 

condition of construction
相关语句
  施工条件
     Combining with condition of construction,it is suggested that the proportion of lime is 7 percent,optimal water content is 17 percent to 20 percent,the maximum dry density is about 17.2 kN/m3 and compaction degree should be greater than 95 percent. Thus,this project quality can assured. 
     结合具体施工条件,石灰掺量可取7%,最佳含水量取17%~20%,最大干容重取17.2kN/m3,压实度大于95%可满足工程要求。
短句来源
     In order to judge early concrete construction quality,the bending strength\|compressive strength curve of vacuum dehydration concrete is put forward by the condition of construction site. \[
     并从现场施工条件出发 ,建立了真空吸水混凝土的抗折、抗压强度相互关系专用曲线 ,以便于对混凝土的施工质量做出早期判定。
短句来源
     As for hight arch dam, the technique of construction is complex, it is difficult to continuously raised many layers, the building structure condition of construction and operation is very complex during construction period, and is directly related to hydrogeologist condition in its position.
     高拱坝施工技术复杂,浇筑仓位多,施工难度大,施工过程中坝体建筑物结构施工条件与运用条件都非常复杂,并与工程所在位置的水文地理地质条件有直接的关系。
短句来源
     According to the practical geology and condition of construction, it adopted the corresponding means and could complete the construction of topsoil safely.
     根据实际地质情况及施工条件采取了相应的措施,安全顺利地穿过流沙层,完成了表土段施工。
     The scheme is determined according to the s ituation of foundatio n,the contruction of combined parts,the functional demand,the whole structure ,the condition of construction and the economy.
     根据地基情况、结合部结构、功能要求、结构整体性、施工条件及经济合理等综合分析,从而确定合理的方案。
短句来源
更多       
  施工条件出发
     In order to judge early concrete construction quality,the bending strength\|compressive strength curve of vacuum dehydration concrete is put forward by the condition of construction site. \[
     并从现场施工条件出发 ,建立了真空吸水混凝土的抗折、抗压强度相互关系专用曲线 ,以便于对混凝土的施工质量做出早期判定。
短句来源
  “condition of construction”译为未确定词的双语例句
     The Direct Dynamic Comprehensive Optimization Method for the Limited Resource Condition of Construction Network Program
     施工网络计划资源有限的直接和动态综合优化方法
短句来源
     Analysis of Thought on Present Condition of Construction of Digital Library
     数字图书馆建设的现状分析与思考
短句来源
     The article analyzes the present condition of construction of the eco-city and environment impact assessment for planning, inquiries into the function of environment impact assessment for planning in promoting the construction of eco-city as the new tool of urban sustainable development, and inquiries into the application of environment impact assessment for planning in the eco-city construction and management.
     从规划环境影响评价的内涵和发展现状入手, 探讨了规划环境影响评价作为促进生态城市可持续发展的新工具在生态城市建设中的作用,并对规划环境影响评价在生态城市建设与管理中的应用进行了探讨。
短句来源
     On the Present Condition of Construction Quality Examination and its Countermeasures for Development
     建设工程质量检测行业现状及发展对策
短句来源
     Based on the above background, grasping the basic concepts, characteristics, content, and the course of the theory of construction project management, linking with the experiences and the lessons of construction project management, the paper describes the present condition of construction project management of water engineering construction enterprise.
     基于以上背景,本文针对企业管理层施工项目管理这一主题,在把握施工项目管理的基本概念、基本特点、主要内容和项目管理的基本过程等理论的基础上,结合企业在施工项目管理中的经验和教训,描述了目前水利施工企业项目管理的现状;
短句来源
更多       
查询“condition of construction”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


This paper develops the scientific approach of decision-making for selecting the best aseismic strategy by means of fuzzy decision-making theory and optimization method. By the approach, many factors these are hardly considered in detailed design can be examined reasonably, for example, the condition of construction, the environment of a structure, the probability of foundation damage, the arrangement of plane and vertical figure of a structure, and so on. The approach can also be applied to the optimal...

This paper develops the scientific approach of decision-making for selecting the best aseismic strategy by means of fuzzy decision-making theory and optimization method. By the approach, many factors these are hardly considered in detailed design can be examined reasonably, for example, the condition of construction, the environment of a structure, the probability of foundation damage, the arrangement of plane and vertical figure of a structure, and so on. The approach can also be applied to the optimal strategy decision of wind-resistant structures and hydraulic structures.

在抗震结构设计中,设防水平(设防烈度)的确定是一个重要的战略决策,而过去却只是根据少量的信息靠设计负责人“拍脑袋”决定的。本文综合利用模糊决策论和优化技术的概念提出了科学的决策方法。这个问题属于正式设计前的概念设计的范畴。这里还可以考虑一般设计中不易考虑的一些因素,如施工条件、结构工作环境、地基失效的可能性、结构平立面布置、计算方法的优劣等因素的影响。本文所提方法也适用于水工结构、抗风结构等的最优设防水平的决策。

Through analyzing the properties of salt swamp soil in northwest region of China and current condition of construction foundation,it presents,by test and construction experience,the deep foundation bed,in particular,and column pole foundation are tendency of construction foundation treatment in salt swamp region.

通过分析西北地区盐渍土的特性及建筑地基现状,结合试验与施工经验,论述深基础尤其是桩基础是盐渍土地区建筑地基处理的发展趋势。

In domestic nucledr power StationS,the Steam generator down-head tube zone’s streass dis-tribution is complicated and the welding Condition of conStruction is rather poor.To test the fatiguestrength of the steam generator,a simulated down-head device for Simulating the real equipment isfabricated.According to the load conditions in the life-time of the nuclear power station,the test load-ing and cycles are determined. The test result shows that the fatigue-resisting ability of the steam gen-erator down-head...

In domestic nucledr power StationS,the Steam generator down-head tube zone’s streass dis-tribution is complicated and the welding Condition of conStruction is rather poor.To test the fatiguestrength of the steam generator,a simulated down-head device for Simulating the real equipment isfabricated.According to the load conditions in the life-time of the nuclear power station,the test load-ing and cycles are determined. The test result shows that the fatigue-resisting ability of the steam gen-erator down-head tube-zone conforms to the design.

国产核电厂蒸汽发生器下封头群孔接管区具有应力分布复杂、焊接施工条件差的特点。为考核其承受循环载荷的能力,设计制造了与实物相似的模拟试验装置,根据核电厂运行寿命期内的载荷特点,确定了模拟试验装置的试验载荷与试验循环数。循环加载试验的结果表明,蒸汽发生器下封头群孔接管区承受循环载荷的能力在寿命期内是符合要求的。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关condition of construction的内容
在知识搜索中查有关condition of construction的内容
在数字搜索中查有关condition of construction的内容
在概念知识元中查有关condition of construction的内容
在学术趋势中查有关condition of construction的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社