助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   construction power 的翻译结果: 查询用时:0.203秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

construction power
相关语句
  施工电力
     In this article, the construction power system for Fenghuoshan Tunnel is taken as an example to introduce the researches in the construction of Qingzang Railway and the techniques to improve diesel engine power compensation and the plateau adaptability of power equipment.
     以青藏铁路昆仑山、风火山隧道供电系统为例,介绍了青藏铁路施工电力系统的可靠性研究与柴油发动机功率补偿和设备的高原适应性改造技术。
短句来源
  建设动力
     The patriotism education can entrust the individual with the spirit resources of lofty patriotim,stimulate the individual patriotic enthusiasm and the construction power,and decide the condition and development of the individual.
     爱国主义教育能够赋予个体以崇高的爱国主义精神资源,能够激发个体巨大的爱国热情和建设动力,同时能够决定个体的状态与发展。
短句来源
  “construction power”译为未确定词的双语例句
     The construction power supply system for the Three Gorges Project is the largestone in China, with amaximum load of up to 70 MW,and four voltage levels including a rated voltage of 220 kV for main power supply, 110kV for safety power supply, 35kV for the lowest levelin the power supply netowrk and 6kV for the distribution.
     三峡工程施工供电系统是国内最大的施工供电系统,最高负荷达70MW。 有四个电压等级:主供电源额定电压220kV,保安电源额定电压110kV,供电网络最低一级额定电压35kV,配电网络额定电压6kV。
短句来源
     Neutral Earthing of 35 kV Construction Power Supply System
     三峡施工供电35kV配电网络中性点接地
短句来源
     This paper describes the application of construction power supply in first-phase project of Taishan Power Plant,which reduced engineering costs and ensured the on-schedule completion of the project by reasonable conversion between temporary 10 kV/0 4 kV power supply system and 380 V station service system,and can supply reference to future similar applications.
     以广东台山电厂一期工程建设中施工电源的运用为例, 通过临建 10kV/0 4kV电源系统与厂用电 380V电源系统的合理转换, 降低了工程建设成本, 保证了建设工期的按时完成, 该方案对于相似类型施工电源的布置具有较实用的指导意义和借鉴价值。
短句来源
     Planning of Construction Power Supply
     三峡工程施工供电系统规划设计
短句来源
     Based on the analysis of the characteristics of power consumption for railway construction, this article brings forth the reasonable selection of power consuming capacity and power supply scheme in light of the principle of “combining the construction power consumption with railway permanent electric works”and makes a uniform arrangement for temporary electric works, hence realizing the goal of strictly controlling the size of temporary electric works and reducing the project investment.
     在分析铁路施工用电特点的基础上 ,提出了按照“施工用电与铁路永久电力工程相结合”的原则 ,合理的选择施工用电容量及电源方案 ,统一安排临电工程 ,实现了严格控制临电工程规模及降低工程投资的目标。
短句来源
更多       
  相似匹配句对
     On Power
     权力的概念、产生和制约
短句来源
     Generalized power group and its construction
     广义幂群及其构造
短句来源
     Application of BOT in Power Construction
     探讨BOT方式在电力建设中的应用
短句来源
     power;
     权力 ;
短句来源
     P. B construction.
     P.
短句来源
查询“construction power”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  construction power
The generator is required to contact PPL EU field coordinator to arrange for construction power.
      
Each 120 volt circuit used for construction power shall be GFCI protected.
      
Concrete and agricultural building construction including the use of construction power tools, selection of materials and cost estimating.
      
Construction power may be from either temporary power poles or through the permanent power panel.
      
Construction power is a privilege granted under the jurisdiction for convenience during construction.
      
更多          


The construction power supply system for the Three Gorges Project is the largestone in China, with amaximum load of up to 70 MW,and four voltage levels including a rated voltage of 220 kV for main power supply, 110kV for safety power supply, 35kV for the lowest levelin the power supply netowrk and 6kV for the distribution. The planning and arrangement of theconstuction power supply system are based on mainly the requirments for construction powersupply and secondly for the future...

The construction power supply system for the Three Gorges Project is the largestone in China, with amaximum load of up to 70 MW,and four voltage levels including a rated voltage of 220 kV for main power supply, 110kV for safety power supply, 35kV for the lowest levelin the power supply netowrk and 6kV for the distribution. The planning and arrangement of theconstuction power supply system are based on mainly the requirments for construction powersupply and secondly for the future utilization. The system consists of one 220kV substation,nine35kV substations,three 35kV substation cabinets and some 2006kV distribution substations,and49km long 220kV transmission line, 15Km long 110kV transmission line, 73Km long 35kV transmission line and 125Km long 6kV distribution line.

三峡工程施工供电系统是国内最大的施工供电系统,最高负荷达70MW。有四个电压等级:主供电源额定电压220kV,保安电源额定电压110kV,供电网络最低一级额定电压35kV,配电网络额定电压6kV。施工供电系统按照满足施工用电为主,远景利用为辅的原则进行规划和布置,该系统由1座220kV变电所、9座35kV变电所、3座35kV厢式变电所、约200个6kV配电所、49km220kV输电线路、15km110kV输电线路、73km35kV输电线路、125km6kV配电线路组成。

The works of temporary structures and infrastructures alleged as “common works" on the Three Gorges Project (TGP) include the aggregate supply systems, construction power supply system, construction water supply system, construction and management of construction access and roads, office buildings and camps, storage facilities and landscaping. The works were constructed by competitive bidding system, and the operation and management were entrusted to constructors by the owner of the TGP...

The works of temporary structures and infrastructures alleged as “common works" on the Three Gorges Project (TGP) include the aggregate supply systems, construction power supply system, construction water supply system, construction and management of construction access and roads, office buildings and camps, storage facilities and landscaping. The works were constructed by competitive bidding system, and the operation and management were entrusted to constructors by the owner of the TGP in order to build, operate and manage more efficiently the temporary structures and infrastructures and serve well the construction of the main works under contracts, and finally to ensure the successful completion of the construction of the TGP.

三峡工程公共项目包括 :砂石骨料系统、施工供电系统、施工供水系统、施工通讯系统的建设与运行 ,施工区道路的建设与维护 ,办公生活区、仓储设施的建设与绿化工程。其工程的建设采用招标承包制、其运行管理采用业主委托方式 ,确保了公共工程系统对各施工标段的服务公平、公正、高效、优质 ,从而保障了三峡工惩的顺利实施。

Flood and drought alternate frequently in hillocky area of the Four river valley in Hu'nan province because of the soil and water loss for many years. The interweaving situation of outside flood and inside waterlogging is getting more and more serious in Dong ting lake plain. Though soil and water conservation eco environment construction has gained certain achievements for the last several years, the speed of the construction is still restricted. The causes are that they lacks funds, the strength of enforcing...

Flood and drought alternate frequently in hillocky area of the Four river valley in Hu'nan province because of the soil and water loss for many years. The interweaving situation of outside flood and inside waterlogging is getting more and more serious in Dong ting lake plain. Though soil and water conservation eco environment construction has gained certain achievements for the last several years, the speed of the construction is still restricted. The causes are that they lacks funds, the strength of enforcing the law is small, the content of science and techno logy is less. The guarantee mechanism of soil water conservation eco environment of the whole province is brought up. That is to set up and perfect the funds channel, to support with science and technology to supervise enforcing the law, to manage and to build it altogether. Strengthen the construction power so as to realize the near term, mid term and long term objectives of soil and water conservation eco environment construction in Hu'nan province.

多年的水土流失 ,使四水流域山丘区水旱灾害交替频繁 ,洞庭湖平原外洪内涝交织局面日愈严重。近几年来 ,水土保持生态环境建设虽取得了一定成效 ,但由于存在资金不足 ,监督执法力度不大 ,工程项目科技含量不高等问题 ,制约了湖南省水土保持生态环境建设速度。提出了建立健全资金渠道 ,科技支撑 ,监督执法、齐管共建等水土保持生态环境建设保障机制。以加大建设力度 ,实现湖南省水土保持生态环境建设近、中、远期目标

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关construction power的内容
在知识搜索中查有关construction power的内容
在数字搜索中查有关construction power的内容
在概念知识元中查有关construction power的内容
在学术趋势中查有关construction power的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社