助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   跨区间 的翻译结果: 查询用时:0.017秒
图标索引 在分类学科中查询
所有学科
铁路运输
更多类别查询

图标索引 历史查询
 

跨区间
相关语句
  trans-interval
     Stress Dispersing and Line Locking in Speed-increasing Transformation of Existing Trans-interval Jointless Line
     既有跨区间无缝线路提速改造的应力放散与锁定
短句来源
     The Features of Locked Rail Temperature of Tunnel Group on Houyue Trans-interval Jointless Line and Management
     侯月线跨区间无缝线路隧道群锁定轨温的特点及管理
短句来源
     Connecting with the speed-increasing transformation engineering of the Beijing-Qinhuangdao Railway, this paper introduces the structure and featur es of this trans-interval jointless line, and probes into the construction meth ods and technical processes of the stress dispersing and line locking in the spe ed-increasing transformation of existing trans-interval jointless line.
     结合京秦线提速改造工程,介绍了该跨区间无缝线路轨道的结构和特点,探讨了既有跨区间无缝线路提速改造中应力放散与锁定的施工方法及工艺流程。
短句来源
     In the light of the features of locked rail temperature of tunnel group on Houyue Trans-interval Jointless Line,this paper analyzes the varying law and influencing scope of temperature force of transitional region,and the temperature regularity of tunnel group jointless line,finds out the weak links of maintenance and reparation management for tunnel group long-line,and advances corresponding treat measures.
     针对侯月线跨区间无缝线路隧道群锁定轨温的特点,分析了过渡区温度力的变化规律和影响范围,以及隧道群整体无缝线路温度变化规律,找出隧道群长轨养护维修管理的薄弱环节,并提出相应的处理措施。
短句来源
  trans-section
     Welding Technology of 250 m Long Rail for Trans-section Seamless Railway Track
     跨区间无缝线路厂焊250m长钢轨施工技术
短句来源
     Since the requirements for the quality of ballast bed are different for various construction phases of laying trans-section CWR,it is suggested that,for different construction phase,different quality state parameters of ballast bed should be chosen for evaluation.
     由于在一次铺设跨区间无缝线路的不同阶段,对道床质量状态的要求各不相同,建议在不同施工阶段,选取不同的道床质量状态参数进行评估。
短句来源
     Construction technology of trans-section continuously welded rail in speed-rising reconstruction of existing railway line
     铁路既有线提速改造跨区间无缝线路施工技术
短句来源
     AN EXPERIMENTAL STUDY ON KEY TECHNIQUES OF TRANS-SECTION CWR
     铁路跨区间无缝线路关键技术的试验研究
短句来源
     Research methods:The track materials can be delivered inside and outside working site under condition of no lining and moving track and the number of blocking line can be reduced by adopting the method of one-time manually laying trans-section continuously welded rail instead of the method of replacing and laying track with track panel.
     研究方法:在不拨移既有线路的情况下进出轨料,减少封锁次数,利用人工一次性铺设跨区间无缝线路的方法取代轨排换铺法。
短句来源
更多       
  “跨区间”译为未确定词的双语例句
     modify the defective equivalent resistance theory to be an optimized and improved seamless turnout computing theory that afterwards is proved correct through experiment and test, paving the way for further development in cross-zone seamless high speed railway.
     针对铁路无缝道岔当量阻力法计算理论的不足,通过对无缝道岔理论的深入探讨,优化和完善了无缝道岔的计算理论,并通过理论与实验测试的对比,验证了优化后理论和方法的正确性,为我国高速铁路进一步发展跨区间无缝线路奠定基础。
短句来源
     2.Acroding to real construction conditions of 150km track of section B26-1 on Qin-shen passenger railway, the construction arrangement, scheme and task flow are summariaed for the construction of overinternal jointless rail on newly-built railway.
     2.依据秦沈客运专线B26-1标段150km的正线轨道铺设实际施工情况,对一次性铺设跨区间无缝线路总体施工安排、施工方案和作业流程进行了总结。
短句来源
     Stress relieving and track locking technology used in laying cross-section jointless track
     一次铺设跨区间无缝线路应力放散与线路锁定施工技术
短句来源
     Research on method of assistant decision on Management Information System for continuously welded rail of across section
     跨区间无缝线路管理信息系统辅助决策方法的研究
短句来源
     THE SYNTHESIS OF CONSTRUCTION TECHNIQUE FOR ONCE TRACK LAYING OF CONTINUOUS WELDED RAIL IN A NEWLY BUILT RAILWAY
     新线铁路一次铺设跨区间无缝线路综合施工技术
短句来源
更多       
查询“跨区间”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  trans-section
The right ventricle was then flushed with 50 ml of normal saline after trans-section of the pulmonary vein, followed by extraction of the left lung.
      


To increase the transfer capability and to improve the system stability of a long distance, heavy loaded transmission system series compensation is presented. Some main aspects in applying series compensation techniques are discussed based on a long distance transmission system. This paper also outlines theoretical backgrounds of the Thyristor Controlled Series Compensation (TCSC). Benefits of TCSC are demonstrated in comparison with the fixed series capacitor (FSC).

文章针对远距离、重载、跨区间交流输电系统的稳定及传输容量问题,提出了串联补偿方案,并围绕采用串联补偿技术所应考虑的一些主要问题,以远距输电系统为例进行了讨论。文中还从理论的角度阐述了可控串补提高系统稳定性、增加系统功率传输容量的原理,通过仿真对其有效性进行了论证并与固定串补进行了对比。

According to the theory of equivalent resistance, the expand and contract displacement of closure rail, the additional force of stock rail, the point displacement, and the shear force of bolts of spacing resticting device at heel were calculated and analyzed in the paper for the 60 kg/m rail, No.12 continuous welded turnout with rigid frog. The results of this paper can be the theoretical reference for installation design and maintenance of the CWR turnout.

利用当量阻力计算理论,分析计算了目前使用的60kg/m钢轨、12号固定辙叉无缝道岔在不同铺设条件下的里轨伸缩位移、基本轨附加温度力、尖轨尖端位移、限位器螺栓剪力等,为该类型提速道岔在跨区间无缝线路的铺设和养护维修提供一些理论依据

Continuous welded turnouts are important for CWR track across the station. According to the equivalent resistance, the non linear theories and the principle of force overlapping, a new method of theoretical calculation for continuous welded turnouts was developed, and on site tests were conducted. The continuous welded turnouts designed and installed according to the new theory behaved fairly well. The data collected on sites is basically consistent with that of theoretical calculation. It is proved that the...

Continuous welded turnouts are important for CWR track across the station. According to the equivalent resistance, the non linear theories and the principle of force overlapping, a new method of theoretical calculation for continuous welded turnouts was developed, and on site tests were conducted. The continuous welded turnouts designed and installed according to the new theory behaved fairly well. The data collected on sites is basically consistent with that of theoretical calculation. It is proved that the calculation theory is correct and the value of calculation parameters is proper.

无缝道岔是跨区间无缝线路的关键技术。文章基于当量参数、非线性理论和力图叠加原理 ,提出了一种新的无缝道岔计算理论 ,并进行了现场试验研究。按该理论设计、铺设的无缝道岔运营状况良好 ,现场测试数据与理论计算值基本吻合 ,验证了该无缝道岔计算理论的正确和计算参数的取值合理

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关跨区间的内容
在知识搜索中查有关跨区间的内容
在数字搜索中查有关跨区间的内容
在概念知识元中查有关跨区间的内容
在学术趋势中查有关跨区间的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社