助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   图布置 的翻译结果: 查询用时:0.219秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

图布置
相关语句
  plot planning
     The 2 comparisons of general plot planning and process flow are made between Hongfu DAP plant and its original design model from Farmland and IMC phosphate plants of USA.
     将贵州宏福实业开发有限总公司DAP装置与其原设计模式装置——美国Farmland和IMC磷肥装置的总图布置、工艺流程进行对比;
短句来源
  “图布置”译为未确定词的双语例句
     Plot Plan for 500 t/a High Performance Engineering Plastic Project
     500ta高性能工程塑料工程总图布置小结
短句来源
     Better ventilation depends on the coordinated design resulting from general layout,process,and calculation of ventilation,mode of building.
     总图布置,工艺流程布置,通风计算,建筑形式,相关专业共同配合,做好自然通风组织设计,达到良好的自然通风效果。
短句来源
     Optimization of General Layout and Short. Quick and High Efficienct Transportation
     优化总图布置,短捷、高效的搬运
短句来源
     The paper discusses the optimization of the mining scale,mining-stripping technology and general layout of Sijiaying Iron Mine,and puts forward a new scheme,which compared to the original one,can save 10518 mu cultivated land area,the removal of 658 farmer families and 2. 32billion waste haulage cost.
     探讨了司家营铁矿开采规模、采剥工艺和总图布置的优化问题,提出了比原有方案少占用耕地10518亩的新方案,可少搬迁农户658户,节省废石运费23.2亿元。
短句来源
     The environmental influence evaluation of mine construction project shall lay stress on the key points,and the evaluation shall combine with engineering design,general design,enterprise programming and harnessing measure.
     矿山建设项目环境影响评价要突出重点 ,评价要与工程设计相结合 ,与总图布置相结合 ,与企业规划相结合 ,与治理措施相结合。
短句来源
更多       
  相似匹配句对
     The S. C.
     C.
短句来源
     N(Z).
     N(Z)的和.
短句来源
     Vertical Design of General Drawing
     总坚向布置设计
短句来源
     Optimization of Layout Plans of Unidirectional. Longitudinal Marshalling Stations
     单向纵列式编组站布置的优化
短句来源
     Spatial Planning
     空间布置
短句来源
查询“图布置”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The general layout of a steel plant is a complex standard to measure the level of its design and construction. According to present conditions arrangement of operations between the steelmaking shop and the rolling mills of the plant has great influence upon the general plan of the whole plant.The ingot teeming along the transverse axis of the steel shop (transverse teeming) is better than the ingot teeming along the axis parallel to the shop axis. This is more favourable for future change to continuous casting....

The general layout of a steel plant is a complex standard to measure the level of its design and construction. According to present conditions arrangement of operations between the steelmaking shop and the rolling mills of the plant has great influence upon the general plan of the whole plant.The ingot teeming along the transverse axis of the steel shop (transverse teeming) is better than the ingot teeming along the axis parallel to the shop axis. This is more favourable for future change to continuous casting. If the teeming is designed in continuous casting or in combination of continuous casting and transverse ingot teeming, it is possible to omit the railroad laid in between the steel shop and the rolling mills, at least to reduce the distance between them, to reduce the length of the pipelines, to reduce the area required, in order to cut down investment of the steel plant and its transportation costs. In this way the standard of the general layout would be raised.

图布置是钢铁厂的综合性技术,是衡量钢铁厂技术水平的一个因素。从目前条件看,炼钢到轧钢之间的布置对总图布置影响很大。当前由于连铸技术不断进步,连铸比将不断增高,横向车铸比纵向车铸易于安排,并有利于将来改成连铸,如果炼钢注锭工艺能采用连铸或连铸加横向车铸,将能取消炼钢至轧钢的铁路,缩短炼钢与轧钢之间距离,减少厂区管线长度、占地面积、建厂费用和运输生产成本。以使我国总图布置设计达到新的水平。

On the basis of analyses of the fire prevention design in Wuhan Commercial Building and Zhongnan Commercial Building, the essay presents several questios about the fire prevention design in big commercial buildings: How the overall arrangement of the fire prevention in general is to satisfy the demand of the fire prevemtion, How to carry out the seperate fire prevention consideration and the smokerrelease fasilities in a design, and how to station the controling place of fire. Analtses and solutions have been...

On the basis of analyses of the fire prevention design in Wuhan Commercial Building and Zhongnan Commercial Building, the essay presents several questios about the fire prevention design in big commercial buildings: How the overall arrangement of the fire prevention in general is to satisfy the demand of the fire prevemtion, How to carry out the seperate fire prevention consideration and the smokerrelease fasilities in a design, and how to station the controling place of fire. Analtses and solutions have been given in the essay.

本文在分析武汉商场,中南商业大楼防火设计的基础上,提出了大型商场防火设计的几个问题:即总图布置如何满足消防要求;建筑设计中如何进行防火分隔与防排烟;安全疏散距离及其出口总宽度确定;以及消防控制室设置等,并对其分析、论证。

Peng Xiangsheng and Li Ming:Exploration history of Pucheng multiple- trap oil-gas field,OGP,23(1)1988:90~101 In the early exploration of Pucheng multiple-trap oil-gas field, seismic grid was designed in the light of magnetic and gravimetric sur- vey results in the scale of 1/200000.Pucheng anticline was fast ascer- tained using less seismic work,which created a good foundation for drilling first batch of geologic exploratory wells.In the course of exploration and development of the field,conventionally and specifically...

Peng Xiangsheng and Li Ming:Exploration history of Pucheng multiple- trap oil-gas field,OGP,23(1)1988:90~101 In the early exploration of Pucheng multiple-trap oil-gas field, seismic grid was designed in the light of magnetic and gravimetric sur- vey results in the scale of 1/200000.Pucheng anticline was fast ascer- tained using less seismic work,which created a good foundation for drilling first batch of geologic exploratory wells.In the course of exploration and development of the field,conventionally and specifically processed seismic data as well as drilling data were analysed and used sufficiently;and comprehensive interpretation of Pucheng anticline was made by analysing many aspects such as geological structure,seismic stratigraphy,sedimentary cycle,source material,ultrasonic moveout and so on.This anticline was found to have rich oil resource,there being multiple rich hydrocarbon strata,of which Es_1 and Es_2 members are characterized by southward imbricate updip thinning out.By the end of 1983,the proved hydrocarbon bearing area was increased to 40km; and the proved oil reserve is the double of that in 1979. The exploration history of Pucheng multiple-trap oil-gas field is detailed using many seismic and geologic interpretation examples.

彭享生,黎明:濮城复式油气田的勘探历程,《石油地球物理勘探》,23(1)1988:90~101在濮城复式油气田勘探初期,根据1:20万的磁力、重力成果图布置地震测网,用较少的地震工作量很快查清了濮城构造的形态,为布署首批地质探井提供了依据。油田在勘探开发过程中,充分利用常规和特殊地震数字处理资料及钻井地质资料,并从地质构造解释、地震地层学、沉积旋回、物源方向及超声波时差分析等方面,对濮城构造进行了综合地震地质解释。发现该构造油源充足,有多套含油气地层。Es_1、Es_2段油气层具有从北向南呈叠瓦式向上倾方向尖灭的特点。至1983年底,探明储油气面积达40 km~2,石油地质储量比1979年增加了一倍。文中以大量的地震地质解释实例详细介绍了濮城复式油气田的勘探历程。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关图布置的内容
在知识搜索中查有关图布置的内容
在数字搜索中查有关图布置的内容
在概念知识元中查有关图布置的内容
在学术趋势中查有关图布置的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社