  handan thermal power plant
    This technique has already produced satisfactory effects on set of 200MW boilers in Handan Thermal Power Plant.
    该锅炉运行优化技术在邯郸热电厂200MW机组锅炉上取得了令人满意的效果。
短句来源
    Analysis of Pulverized Coal Congestion in the Disperser of Handan Thermal Power Plant
    邯郸热电厂煤粉混合器下粉不畅的原因分析
    This paper mainly deals with concrete applications of boiler’s optimizing operation techniques used in a set of 200MW boilers. It, based on a large amount of condensed optimizing operation techniques, makes fire control experiment focusing on B&WB-670/13.7-M boiler’s virtually lower operation efficiency than designed in Handan Thermal Power Plant.
    本文主要对锅炉的运行优化技术在200MW机组锅炉上的具体应用进行了相关研究,在综合了大量运行优化技术的基础上,针对邯郸热电厂B&WB-670/13.7-M锅炉实际运行效率低于设计水平问题,进行了锅炉运行优化的燃烧调整试验。
短句来源
    For the #10 boiler of Handan thermal power plant, congestion in the disperser has been existed since its commissioning test.
    邯郸热电厂#10锅炉自投运以来一直存在下粉不畅现象,严重影响其正常生产。
  handan power plant
    For the crack in the cast valve body of the main steam automatic valve in Handan Power Plant,the author analyzes why the crack was developed,and discusses the weldability of the valve body An applicable repair welding procedure is proposed,and well folfilled
    针对邯郸热电厂自动主汽门阀体铸钢件出现的裂纹,分析了产生原因,并在对其补焊可行性探讨的基础上,提出了切实可行的焊接修复工艺方案,并予以实施
短句来源
  “邯郸热电厂”译为未确定词的双语例句
    According to the result of numerical simulation, cold model experiment and field operation, main cause of congestion are construction of disperser, change of coal quality and change of pressure distribution.
    根据数值模拟与冷态试验结果以及实际运行情况,指出煤粉混合器的结构、煤质变化与压力分布变化是引起邯郸热电厂煤粉混合器下粉不畅的主要原因。
    Analysis of Cold-state Features of Type EI-XCL vortex burners in Handan Cogeneration Power Plant
    邯郸热电厂EI—XCL型旋流燃烧器冷态特性分析
短句来源
    Burner Reformation of Boiler No.10 in Handan Cogeneration Power Plant
    邯郸热电厂~#10炉燃烧器改造
短句来源
    Aimed at block of powder drop in Handan heat power plant, based on academic analysis, the reason is confirmed and for optimized wind powder blenders are designed.
    针对邯郸热电厂存在下粉不畅等问题,在理论分析的基础上,确定了其产生原因,并设计了四种结构优化的煤粉混合器。
短句来源
    This paper introduces the Handan Co generation Power plant, intermediate pressure rotor's last stage-blade frequency reach dangerous resonance area when 200MW units were overhauled .
    介绍了邯郸热电厂 2 0 0MW机组大修中 ,中压转子末级叶片组频率落入危险的共振区。
短句来源
查询“邯郸热电厂”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


For the crack in the cast valve body of the main steam automatic valve in Handan Power Plant,the author analyzes why the crack was developed,and discusses the weldability of the valve body An applicable repair welding procedure is proposed,and well folfilled

针对邯郸热电厂自动主汽门阀体铸钢件出现的裂纹,分析了产生原因,并在对其补焊可行性探讨的基础上,提出了切实可行的焊接修复工艺方案,并予以实施

According to the flow chart and requirement of boiler makeup water treatment system for 2×200 MW cogeneration units in a reformation project of Handan Power Plant, the reasonable step sequence of startup and chemical water preparation, shutdown and regeneration ( or cleaning ) of the makeup water treatment system, in which high efficiency filters, organic matter removers, cation beds, anion beds, mixed beds, and other components are involved, are investigated. The step sequence activities of valves, pumps,...

According to the flow chart and requirement of boiler makeup water treatment system for 2×200 MW cogeneration units in a reformation project of Handan Power Plant, the reasonable step sequence of startup and chemical water preparation, shutdown and regeneration ( or cleaning ) of the makeup water treatment system, in which high efficiency filters, organic matter removers, cation beds, anion beds, mixed beds, and other components are involved, are investigated. The step sequence activities of valves, pumps, and fans under control in the procedure are also provided.

结合邯郸热电厂技改工程锅炉补给水处理系统的工艺流程和控制要求 ,对锅炉补给水处理系统所涉及的高效过滤器、有机物清扫器、阳床、阴床和混床等化学水处理设备的投运制水、停运和再生 (或清洗 )过程的合理程控步序进行了研究 ,给出了各步序中被控阀门和被控泵或风机的动作情况。

This paper introduces the Handan Co generation Power plant, intermediate pressure rotor's last stage-blade frequency reach dangerous resonance area when 200MW units were overhauled .In order to ensure the qualification of batches of blades frequency, we improved intermediate pressure rotor's last stage blade and changed batches of jointing lacing wire into circles of loose lacing wire, so that make the reliable assurance of economy safety and overhaul time limit for project of steam turbine.

介绍了邯郸热电厂 2 0 0MW机组大修中 ,中压转子末级叶片组频率落入危险的共振区。为保证叶片组频率的合格 ,对中压转子末级叶片拉筋进行了改进 ,由成组焊接拉筋改成整圈松拉筋型式 ,使汽轮机的经济性、安全性和大修工期都得到了可靠的保证

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关邯郸热电厂的内容
在知识搜索中查有关邯郸热电厂的内容
在数字搜索中查有关邯郸热电厂的内容
在概念知识元中查有关邯郸热电厂的内容
在学术趋势中查有关邯郸热电厂的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社