助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   建设前期 的翻译结果: 查询用时:0.612秒
图标索引 在分类学科中查询
所有学科
宏观经济管理与可持续发展
更多类别查询

图标索引 历史查询
 

建设前期     
相关语句
  earlier stage of construction
     This paper aimed at pointing out the exist problem in the project construction through the analysis of suggestions on item, feasibility study and other different emphases on main sector, such as design, bid and construction. It puts forward the measures which should be taken by construction company and relevant authorities in controlling investment expenditure of main sector, and it summarize four main points on control:control in earlier stage of construction, control in phase of public bidding, control in phase of construction and control in measure of management.
     通过对现行建设程序中项目建议书、可行性研究以及设计、招标、施工等主要环节不同工作侧重点的分析 ,指出了工程建设中存在的问题 ,提出了建设单位及政府主管部门在各环节中控制投资费用所应采取的措施 ,并归结为四大控制要点 :建设前期控制、招标阶段控制、施工阶段控制、管理方法控制
短句来源
  earlier stage in construction
     Action of feasibility study in the earlier stage in construction
     建设前期可行性研究的作用
短句来源
     It introduces the conception,task and purpose of feasibility study,represents the action of feasibility study in the earlier stage in construction from eight aspects,which will bring forward direct basis to the final decision of investor,and establish base to the item construction.
     介绍了可行性研究的概念、任务及其目的,从八个方面阐述了可行性研究在建设前期中的作用,从而为投资者的最终决策提供直接的依据,也为项目的实施奠定了基础。
短句来源
  early stage of construction
     Effect of feasible research in early stage of construction
     可行性研究在建设前期中的作用
短句来源
  “建设前期”译为未确定词的双语例句
     Economic Evaluation of the road construction is the important part of the early work.
     公路建设项目经济评价是公路建设前期工作的重要组成部分,是建设项目立项和决策的重要依据。
短句来源
     Discussion on prophase investment control of railway project construction
     铁路项目建设前期的投资控制
短句来源
     Management practice and experience in the early stage of enginering construction project
     工程项目建设前期管理实践及体会
短句来源
     On cost control at antecedent stage of engineering construction
     浅谈工程建设前期阶段的造价控制
短句来源
     Research of Cost Control in the Early Stage of Housing Construction
     住宅建设前期造价控制研究
短句来源
更多       

 

查询“建设前期”译词为其他词的双语例句

     

    查询“建设前期”译词为用户自定义的双语例句

        我想查看译文中含有:的双语例句
    例句
    为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
      early stage of construction
    Most nests appeared to be in an early stage of construction.
          
    The Medical Digital Library that we discussed in this paper is at early stage of construction.
          
      early construction
    Consideration has been given to the range of possible influences in their lives that may have shaped the creation of new kits -- especially childhood experiences with contemporary early construction kits.
          
    This study explores the relationship between various factors and the construction of the distinctive inclined, eccentric, and curved combs of Polistes annularis.Foundation and early construction show stereotypical inclination and bilateral symmetry.
          
    Alternatively, the agricultural sector asks for network company to speed up the early construction of agricultural e-commerce.
          
    Early construction input to schematic design greatly increases the visibility of cost.
          
    Early construction estimates provided by contractors other than Erdman have proved elusive.
          
    更多          


    The paper discusses the method of project enterprise economic app- raisement.It also intruduces enterprise economic appraisement calcula- ting schedule appraisement index and noncertain analysis and enterprise economic result appraisement. In the end of this paper,it analyzes the examples.

    可行性研究是在项目建设前期对该项目进行技术经济分析的一种方法。它是通过调查研究,对项目的各项相关因素进行分析计算,论证各种实施方案的经济效益,以选择技术上先进可行,经济上合理有利的最佳方案,为项目的投资决策提供科学依据。本文中论述了项目企业经济评价的方法,并通过案例介绍企业经济评价计算表和评价指标,进行不确定性分析来评价企业经济效益。

    The navigation construction from Fugu to Yumenkou on the Yellow River is a part of the whole navigation construction on the Yellow River. There are four vital problems to be solved: training navigation cannel, nacvigable stage, patteras of ships and shippassing structure at Hukou section. The paper described briefly the work done in the eralier stage, progress in testing and the aim for next five years.

    黄河府谷至禹门口河段航运建设是国家对黄河水系航运建设的组成部分。其关键性技术问题主要有四个:航道整治、通航水量、船型及壶口通航建筑物。本文简要介绍了建设前期工作的进展情况、试验性生产建设的成效和今后五年的发展目标。

    This paper gives a simple analysis for the construction of class I

    本文依据山东省近几年一级公路的建设实践,浅析一级路建设前期工作和设计中有关技术标准的应用及设计方案拟定的原则与方法;新技术、新工艺、新材料、新结构的应用;设计及施工质量管理的方法及措施;推行招标及监理的做法等。并反思了在一级公路建设中质量管理的教训,以期抛砖引玉,提高公路建设的质量和管理水平。

     
    << 更多相关文摘    
    图标索引 相关查询

     


     
    CNKI小工具
    在英文学术搜索中查有关建设前期的内容
    在知识搜索中查有关建设前期的内容
    在数字搜索中查有关建设前期的内容
    在概念知识元中查有关建设前期的内容
    在学术趋势中查有关建设前期的内容
     
     

    CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
    版权图标  2008 CNKI-中国知网
    京ICP证040431号 互联网出版许可证 新出网证(京)字008号
    北京市公安局海淀分局 备案号:110 1081725
    版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社