助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   场地工程地质条件 的翻译结果: 查询用时:0.011秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

场地工程地质条件
相关语句
  site engineering geologic conditions
     Based on the data concerning several landslides and site engineering geologic conditions of a revetment engineering of Huandao Road,and from the aspects of stability of slope and harm of landslide,this paper carried out an assessment of geologic disaster and put forward the regulation scheme for the landslide area.
     根据环岛路某护岸工程几次滑坡的情况及场地工程地质条件等资料,从岸坡的稳定性及滑坡危害性等方面对地质灾害进行评估,提出滑坡区域的治理方案。
短句来源
  “场地工程地质条件”译为未确定词的双语例句
     In view of practical engineering geological conditions corresponding design scheme is introduced for deep excavation retaining. The maximum displacement of pile is calculated. Construction technology is also introduced for deep excavation retaining.
     针对场地工程地质条件,提出了深基坑支护设计的方案,并对桩顶最大位移进行了计算,介绍了基坑支护结构施工,得出了该施工工艺能降低施工难度,缩短工期的结论,以提高深基坑支护技术。
短句来源
     In combination with the project performance,site geological and engineering conditions,the clearing technology is discussed;
     结合工程实际 ,介绍了场地基本情况、场地工程地质条件 ,探讨了原有桩基础清障工艺 ,分析了清障作业的难点及拟采取的解决措施。
短句来源
     Based on current domestic and foreign researches on dangerous rock and applying the Hongyadong dangerous rock project in Chongqing as the example, the following contents are researched:At beginning, the details of engineering geology on the area are introduced, including the conditions of engineering geology and hydrogeology.
     本文以目前国内外对危岩研究的现状为基础,以三峡库区地质灾害项目——重庆洪崖洞危岩综合整治工程为依托,进行危岩边坡的破坏和加固机理的研究,主要内容如下:论文首先介绍了洪崖洞地区的场地工程地质条件,包括工程地质和水文地质的详细情况。
短句来源
     Combined with specific engineering, it discusses geological conditions of engineering and design of strengthening plan according to construction characteristic in karst area, construction of CFG pile compound foundation is illustrated, analyzes effects of construction, and it has obtained good economic benefits.
     结合具体的工程概况,对场地工程地质条件、加固方案设计作了探讨,针对岩溶地区的施工特点,阐述了CFG桩复合地基的施工,并对其施工效果作了分析,取得了良好的经济效益。
短句来源
     ① The engineering geologic condition about topography, stratigraphy, tectonic structure, the stability of regional tectonics and the phenomena of physical geology have been analyzed and researched, and then the engineering geologic condition of the dam site has been evaluated.
     ①对坝址区的地形地貌、地层岩性、地质构造、区域构造稳定性评价、物理地质现象等工程地质条件进行了分析、研究,对场地工程地质条件进行了评价。
短句来源
更多       
  相似匹配句对
     The Geological Condition of Engineering for the Yard of Tank Storage Area of Hazardous Goods, Zhuhai Port
     珠海港危险品储罐区场地工程地质条件
短句来源
     The geological condition and general situation of engineering for site of the Zhujiang steel works are introduced briefly.
     简要介绍了广州珠江钢厂场地地质条件工程概况。
短句来源
     An Analysis of the Faults and Engineering Geological Conditions in Respect to the Large Tank Farm of Tieling Pump Station
     铁岭泵站大型储油罐场地断层及工程地质条件的分析
短句来源
     Finally the paper evaluates the main problem of seismic engineering geology and site condition.
     最后,对场地条件及地震工程地质问题做出了评价。
短句来源
     The geological condition after disposal can completely satisfy the request of the project.
     处理后的该场地地质条件均能满足工程的要求。
短句来源
查询“场地工程地质条件”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


There is a belt of abnormally high seismic intensity along the line of Sanlihe-Xisi-Deshengmen in Beijing city during the Tangshan earthquake. Various hypothesis as to the cause of this abnormal belt have been suggested.Because the earthquake risk of Beijing city is not negligble and more and more highrise buildings are being erected,it might be necessary to find out the cause resulting in this belt of high seismic risk.Through detailed researches on a typical geological profile and its earthquake response by...

There is a belt of abnormally high seismic intensity along the line of Sanlihe-Xisi-Deshengmen in Beijing city during the Tangshan earthquake. Various hypothesis as to the cause of this abnormal belt have been suggested.Because the earthquake risk of Beijing city is not negligble and more and more highrise buildings are being erected,it might be necessary to find out the cause resulting in this belt of high seismic risk.Through detailed researches on a typical geological profile and its earthquake response by using the extended SAP 5 program,the following main results are obtained:1.It is found that a depression of the underlying bedrock to a depth of 1000-1500 meters plays a dominant role in causing the belt of abnoralty intense earthquake damage in Beijing.2.The calculated predominant periods of the response spectra at different sites above the depression are from 0.85-0.95 see.These conclusions are likely to be helpful to the earthquake-resistant design of high-rise builings in the urban area of Beijing or other similar zones.

北京市区沿三里河—西四—德胜门有一条地震高烈度异常带,其产生异常的原因众说不一。目前北京地区仍存在中等强度地震的波及与威胁,同时该区高层建筑正在日新月异的发展,因而探明这条高烈度异常的成因看来是很必要的。本文回顾了有关场地工程地质条件对地震动的影响的研究进展,详细分析了该区的工程地质和基岩构造情况,利用经作者扩展的SAP 5程序计算了典型剖面的地震反应。结果表明深度在1000—1500米的基岩凹陷对这一高烈度异常似有着控制性的影响。由于地面振动的卓越周期在1.0秒左右,将对该区的长周期结构(如高层建筑和烟囱等)带来不利影响。

This paper presents an analysis of the functions and effects of various protective measures for piling through the example of the piling and construction of Xi-ling high-rise in Nanshi District. The public calamity made by piling to the surrounding environment is a dynamic process. Based on the engineering geological conditions of the site and the piling process with suitable amount of protective work, and on the pore water pressure of the site during piling and the regularity of deformation of the foundation...

This paper presents an analysis of the functions and effects of various protective measures for piling through the example of the piling and construction of Xi-ling high-rise in Nanshi District. The public calamity made by piling to the surrounding environment is a dynamic process. Based on the engineering geological conditions of the site and the piling process with suitable amount of protective work, and on the pore water pressure of the site during piling and the regularity of deformation of the foundation soil, the feed-back construction method of the in-time rearrangement of the piling process reduces the protection expenses and its effect on the surrounding environment.

本文通过南市区西陵高层打桩施工的实例,分析了各种打桩防护措施的作用和效果。认为打桩对周围环境产生的公害是一个动态过程。因而,根据场地的工程地质条件和打桩的进程,配以适当的防护工作量,并根据打桩过程中场地孔隙水压力和地基土变形的规律及时调整打桩流水的情报化施工方法,降低了防护费用,并可大大减少对周围环境的影响。

The Sichuan Broadcasting Tower (313m high) has its foundation located in a complex soilstone body, which is composed of varicolourcd soil fill, silty clay, clay, medium size sand, cailloutles, mud stone and sandstone. The hole-hole large distance sound wave tomography technique was used to find out the components and subareas of the soil-stone ground, the state of the contact plane between the overburden and the solid rock and the spatial distribution of sand lens bodies. In this paper, the principle of large...

The Sichuan Broadcasting Tower (313m high) has its foundation located in a complex soilstone body, which is composed of varicolourcd soil fill, silty clay, clay, medium size sand, cailloutles, mud stone and sandstone. The hole-hole large distance sound wave tomography technique was used to find out the components and subareas of the soil-stone ground, the state of the contact plane between the overburden and the solid rock and the spatial distribution of sand lens bodies. In this paper, the principle of large distance sound wave CT tomography, and the arrangement of the survey line will be expounded and the merits and demerits of the technigue will be explained by the results obtained in exploration of the Sichuan Broadcasting Tower.

作者在超高层的四川广播电视塔(313m)深基础勘探中,采用跨孔声波CT层析成象技术,对于大于20m范围内的由杂填土、粉砂质粘土、粘土、中砂、卵石、砾石和泥岩、砂岩等组成的复杂岩土体地基的组成和分区,砂层透镜体的产出空间位置,覆盖层与基岩的接触状态,以及基岩中是否存在断层破碎带等特性作出判断。文章叙述了CT成像的原理、测试布置及结果分析。通过本实例显示,声波CT技术对场地的工程地质条件可以得到更完整、更形象的反映。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关场地工程地质条件的内容
在知识搜索中查有关场地工程地质条件的内容
在数字搜索中查有关场地工程地质条件的内容
在概念知识元中查有关场地工程地质条件的内容
在学术趋势中查有关场地工程地质条件的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社