助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   中国重型机械 的翻译结果: 查询用时:0.161秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

中国重型机械
相关语句
  china heavy-duty machinery
     TLGYIT Coal-fired Power Plant(2×60MW) is the project Contracted by China Heavy-duty Machinery Corporation from Burma Electric Power Company. Total capacity is 120 MW in the plant including 2×240 t/h boilers,2×60 MW condensing steam turbine-generator unit,a 132kV substation and some accessory systems or equipment such as coal conveying system and ash handling system, etc. .
     缅甸TIGYIT(2×60MW)燃煤火力发电站项目是中国重型机械总公司与缅甸国家电力部缅甸电力公司签订的工程总包合同,总装机容量为120MW,包括2台240t/h锅炉,2台60MW凝汽式汽轮发电机组,一座132kV变电站以及除盐水生产,输煤、除灰系统等燃煤电站附属系统和设备。
短句来源
  “中国重型机械”译为未确定词的双语例句
     China's Technical Development of Heavy Machines (in the 1950s-60s)
     20世纪五六十年代中国重型机械技术发展初探
短句来源
     Impelling policies,weak industrial infrastructure,and the capability to assimilate external technology determined the process.
     在此期间,国家强有力的政策指向、薄弱的工业基础、较强的技术引进和消化吸收的能力,决定了中国重型机械技术发展所走的道路。
短句来源
  相似匹配句对
     Urgent Necessity and Important Responsibility-to Found China Machine Museum
     中国应有机械博物馆
     History of Development of Plant Protection Machinery in China
     中国植保机械发展史
短句来源
     China Heavy Automobile Group
     中国重型汽车集团
短句来源
     The Packaging of Heavy-duty Machinary Products
     重型机械产品的包装
短句来源
     CHINA
     中国
短句来源
查询“中国重型机械”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Abstract

现代电炉炼钢工艺及设备(1)蒋丽娟中国重型机械总公司(北京,100036)Modernelectricalfurnacesteel-makingprocessanditsequipment(1)¥jiangLijuan1概述自从1906年4月5日第一...

Abstract

现代电炉炼钢工艺及设备(2)蒋丽娟中国重型机械总公司Modernelectricalfurnacesteelmakingprocessanditsequipment(2)¥JiangLijuan3炉外精炼3.1炉外精炼的概念钢水的炉外精炼,又叫二次(...

TLGYIT Coal-fired Power Plant(2×60MW) is the project Contracted by China Heavy-duty Machinery Corporation from Burma Electric Power Company.Total capacity is 120 MW in the plant including 2×240 t/h boilers,2×60 MW condensing steam turbine-generator unit,a 132kV substation and some accessory systems or equipment such as coal conveying system and ash handling system, etc..The project is the largest and sole coal-fired power plant in Burma.The state of dust raising from coal leakage of the conveying system was...

TLGYIT Coal-fired Power Plant(2×60MW) is the project Contracted by China Heavy-duty Machinery Corporation from Burma Electric Power Company.Total capacity is 120 MW in the plant including 2×240 t/h boilers,2×60 MW condensing steam turbine-generator unit,a 132kV substation and some accessory systems or equipment such as coal conveying system and ash handling system, etc..The project is the largest and sole coal-fired power plant in Burma.The state of dust raising from coal leakage of the conveying system was serious because the workers from Burma were lack of experience with both equipment installation and plant management.A coumtermeasuer was put forward by the writers based on the analysis of the causes of coal leakage and dust raising.

缅甸TIGYIT(2×60MW)燃煤火力发电站项目是中国重型机械总公司与缅甸国家电力部缅甸电力公司签订的工程总包合同,总装机容量为120MW,包括2台240t/h锅炉,2台60MW凝汽式汽轮发电机组,一座132kV变电站以及除盐水生产,输煤、除灰系统等燃煤电站附属系统和设备。此项目是缅甸国内最大的也是唯一的燃煤火力发电厂,缅方没有任何安装和运行燃煤火力发电厂的经验,由于各种原因造成输煤系统漏煤扬尘现象严重,本人通过参与安装和试运过程,分析造成漏煤和扬尘的原因,并提出了改善措施。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关中国重型机械的内容
在知识搜索中查有关中国重型机械的内容
在数字搜索中查有关中国重型机械的内容
在概念知识元中查有关中国重型机械的内容
在学术趋势中查有关中国重型机械的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社