助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   混凝土竖井 的翻译结果: 查询用时:0.012秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

混凝土竖井
相关语句
  concrete shaft
     Construction Technology for Large Slurry Balance Shield Passing Through Plain Concrete Shaft
     大型泥水平衡盾构穿越素混凝土竖井的施工技术
短句来源
     The technology for shield directly passing through plain concrete shaft is unprecedented in China, especially under the difficult curve condition.
     盾构直接穿越素混凝土竖井的施工技术在国内外尚无先例,尤其整个穿越过程是在曲线情况下进行,这更为盾构穿越增加了难度。
短句来源
  “混凝土竖井”译为未确定词的双语例句
     Application of lifting form technology for the construction of a cast in place concrete vertical shaft well
     现浇混凝土竖井提模工艺的应用
短句来源
  相似匹配句对
     concrete;
     混凝土;
短句来源
     High Technique Concrete
     高技术混凝土
短句来源
     Application of lifting form technology for the construction of a cast in place concrete vertical shaft well
     现浇混凝土竖井提模工艺的应用
短句来源
     Technology for Making Concrete Forms of Shafts at Southern Slop of Permanent Shiplock of TGP
     三峡船闸南坡竖井混凝土施工的模板
短句来源
     A SIGNAL DEVICE FOR LIFTING IN SHAFT WELL
     竖井提升信号装置
短句来源
查询“混凝土竖井”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  concrete shaft
Creep in concrete shaft linings and its effect on strain measurement
      
-The study presented in this paper demonstrates the application of a miniature seismic reflection (MSR) system as a nondestructive testing tool for evaluation of concrete shaft and tunnel linings.
      
Then, results obtained from experimental studies on a concrete shaft lining are presented.
      
Existing shaft caps must be removed and a reinforced concrete shaft cap installed for a shaft at the East Mine and near the mill at CRM.
      
The principal spillway is a concrete shaft spillway with a rectangular riser and a circular, concrete conduit for discharging the riser flows.
      
更多          


Abstract

现浇混凝土竖井提模工艺的应用黎伯均,唐祥Applicationofliftingformtechnologyfortheconstructionofacastinplaceconcreteverticalshaftwell¥LiBojun;TangX...

On the purpose of shortening the time of shield out of and into the tunnel, diaphragm wall was adopted for the construction of No. 2 Shaft of South Tube of Yanan Donglu Tunnel, and then the shaft was dug after shield had directly passed. The technology for shield directly passing through plain concrete shaft is unprecedented in China, especially under the difficult curve condition.

上海延安东路隧道南线2号井位于浦东段圆形隧道轴线上,为保证质构连续施工,避免重复进、出洞的工序,该进施工来用地下连续墙围护,顺筑内衬,待盾构直接穿越后再进行竖井施工。盾构直接穿越素混凝土竖井的施工技术在国内外尚无先例,尤其整个穿越过程是在曲线情况下进行,这更为盾构穿越增加了难度。

In the construction of the flood relief shaft of Gongboxia Hydropower project, two sets of slide formwork were used to complete the project. The styles and structures of the formwork are easy to use in design. The construction methods in details are valuable for other similar projects. In this dissertation, the design method and construction process was presented in details.

2003年10月,公伯峡水电站右岸旋流泄洪洞工程竖井及通气孔混凝土采用液压滑模施工,为工程的顺利完成提供了可靠的保障。该套滑模在设计与施工中,采用了比较先进的结构形式和施工工艺,操作简单,便于制作和现场施工。实践表明,对于不变截面的混凝土竖井和塔的施工,液压滑模是一种经济、可靠的施工手段,值得在水利水电工程中推广应用。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关混凝土竖井的内容
在知识搜索中查有关混凝土竖井的内容
在数字搜索中查有关混凝土竖井的内容
在概念知识元中查有关混凝土竖井的内容
在学术趋势中查有关混凝土竖井的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社