助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   导线控制 的翻译结果: 查询用时:0.054秒
图标索引 在分类学科中查询
所有学科
公路与水路运输
水利水电工程
更多类别查询

图标索引 历史查询
 

导线控制     
相关语句
  wire control
     The application of GPS in highway wire control measure
     GPS在高等级公路导线控制测量中的应用
短句来源
  traverse control
     Practice and Analysis for Single Base Station RTK Replacing One-rank Traverse Control Survey
     单基站RTK代替一级导线控制测量的实践与分析
短句来源
  lead control
     Probe Into Point-scattered Lead Control Measurement With the Technique of RTK
     采用RTK进行散点型导线控制测量的探讨
短句来源
     It introduced the method and result analysis of the point-scattered lead control measurement with RTK,and pointed out the attentive problems during the measurement.
     文中简要介绍了采用RTK进行散点型导线控制测量的基本方法和成果分析,提出了测量过程中需要注意的几个问题。
短句来源
  “导线控制”译为未确定词的双语例句
     THE TECHNOLOTY OF CONTROLING SURVEY AND RECOVERING LOCATION IN HIGH LEVEL ROAD CONSTRUCTION
     高等级公路导线控制测量与恢复定线
短句来源
     Precision of Traversing Control for High-type Highway——and Traversing Technical Design
     论高等级公路导线控制的必要精度——兼导线测量技术设计
短句来源
     To measure instrument high and light-reflect mirror's high in Wushan's underground mine 7″ basic conductor control measurement, and through analysis on triangle height errors in photoelectric side measuring, could meet the accuracy requirements of Grade Ⅰfor underground operations.
     本文根据武山铜矿井下 7″级基本导线控制测量工作中量取仪器高和反光镜高 ,通过对光电测边三角高程高差误差的分析 ,其测量精度可以满足井下I级水准测量精度的要求。
短句来源
     Simple Talking about the Traverse Survey And the Location Renewing of High-Type Highway
     高等级公路导线控制测量与恢复定线浅谈
短句来源
     According to the memory space's feature of CASIO fx-4800P and the practical case of this project,we designed the procedure of the control of the traverse and the controlling survey of construction. Running the procedure,we could get adjustment of the survey of traverse conveniently;
     根据CASIO fx-4800P的内存特征,结合内蒙古赤峰市三座店工程的实际情况,编制该工程的导线控制测量程序和施工放样程序.
短句来源
更多       

 

查询“导线控制”译词为其他词的双语例句

     

    查询“导线控制”译词为用户自定义的双语例句

        我想查看译文中含有:的双语例句
    例句
    为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
      wire control
    A distributed steer-by-wire control system is described, which is developed according to the model.
          
    Asserted on writes to the high-order byte of x16 memory devices that use the JEDEC 4-wire control interface.
          
    Asserted when accessing the low-order byte of x16 memory devices that use the JEDEC 5-wire control interface.
          
    Both converters include a flexible synchronous serial interface that is SPI compatible and also offers a two-wire control mode for low-cost isolation.
          
    Different sections of the chip can also be powered down under software control using the selectable two or three wire control interface.
          
    更多          
      traverse control
    Downstream from RM 72 there is continuous traverse control in all existing GIS sites.
          
      lead control
    Electrothermal atomic absorption spectrometry (ETAAS) has been used for lead control in waters and sediments of the wetland Tablas de Daimiel National Park.
          
    Air lead and blood lead data, recorded over a period of 3 years for 972 employees at an automobile battery factory as part of a lead control program, were summarized and statistically analyzed.
          
    A study of smooth muscle electromyogram under the direct visual lead control with endoscope (1)
          
    If k value is too much, it will lead control input onto extremely chattering phenomena.
          
    This guide also reminds workers of their responsibilities to comply with company safety programs and to participate in lead control programs.
          


    Dayaoshan Tunnel is the longest double-track railway tunnel in China andthe tenth longest one in the world. It is 14,295m long and has a maximum over-burden depth of 910m. This tunnel passes through more than ten faults and frag-mente d surrounding rock in which the amount of underground gushing waterreached 51000t/d. The ninth fault is very serious as its broken effective band is465m in width. The construction plan was carried out with "Three-inclines and One-shaft"method in which the long tunnel was excavated...

    Dayaoshan Tunnel is the longest double-track railway tunnel in China andthe tenth longest one in the world. It is 14,295m long and has a maximum over-burden depth of 910m. This tunnel passes through more than ten faults and frag-mente d surrounding rock in which the amount of underground gushing waterreached 51000t/d. The ninth fault is very serious as its broken effective band is465m in width. The construction plan was carried out with "Three-inclines and One-shaft"method in which the long tunnel was excavated through short divisions, andin which the method of full face and half face tunnelling was done by use of large construction machines. Three large mechanical constructing lines was usedfor excavation (including drilling- and -blasting, mucking and transportation ),bolt-shotcrete and cast-in- place concrete work. Tens new technology was usedin construction, such as long-hole (l = 5. 15m ) smooth blasting, no- rail transpor-tation, double lining, plastic sheet waterproofing, field measurement monitor-ing, photocurrent range finding geodetic, geology prediction, long distance work-ing ventilation with one working face, new light resource and so on. A month-ly advancement of 217m for one working face was achieved in construction.Tunnel passed the ninth fault safely by taking large-section mechanical con-struction, stratum consolidation, double lining and other measures. The com-pletion of Dayaoshan Tunnel marks that the technology of tunnelling in Chinacome up to advanced world level.

    大瑶山隧道长14.295km,是我国最长双线铁路隧道,名列世界双线铁路隧道第十名。最大埋深910m。通过10多条大断层,围岩复杂破碎,涌水量达51000t/d,9~#断层特别严重,断裂影响带宽465m。 采用“三斜一竖”长隧短做施工方案,全断面、半断面大型机械施工。组成开挖(钻爆、装碴和运输)、锚喷、模注混凝土三条大型机械化作业线。施工中采用深孔(长5.15m)光面爆破,无轨运输,复合衬砌,塑料板防水层,施工监控量测,光电测距导线控制测量,地质预报,长距离独头巷道施工通风,新光源等几十项新技术。单口月成洞达217m。大断面机械施工、配合地层加固等措施,安全、快速通过9~#断层带。大瑶山隧道建成,标志我国隧道建设技术已达到国际先进水平。

    The automatic system of traverse is analysed and studied,using the programe developed and field data recorded in all station,which can be adjusted in officework.It is of great use in ordinary converse.

    对电磁波导线控制测量从野外数据采集到内业平差计算的自动化进行了分析、研究,并对开发的软件作了介绍,最后通过实例加以验证、说明。

    The precise guiding technology used in long distance underground pipe driving project is studied on the basis of error analysis.Some methods and measures are studied,such as the rational readjustment of all kinds of error,the surveying plan,the precise azimuth transfer of shaft,and the auto guiding system with traverse control improving the orientation precision of gyro theodolite,in order to take into consideration the feature of dynamic driving in of the underground pipe driving project.The high precision...

    The precise guiding technology used in long distance underground pipe driving project is studied on the basis of error analysis.Some methods and measures are studied,such as the rational readjustment of all kinds of error,the surveying plan,the precise azimuth transfer of shaft,and the auto guiding system with traverse control improving the orientation precision of gyro theodolite,in order to take into consideration the feature of dynamic driving in of the underground pipe driving project.The high precision of holing through is ensured,and the precise guiding problems in the underground pipe driving project are resolved effectively.This technology is applied to the underground pipe driving project through the Huangpu River in Shanghai,and the result is significant.

    在误差分析的基础上研究了长距离顶管工程中精密导向技术.所采取的各种误差合理分配、施测方案、竖井的精密方位传递、提高陀螺经纬仪的定向精度以及为满足顶管工程动态顶进特点而采用精密导线控制自动导向系统等一系列的方法和措施,确保了贯通的高精度,有效地解决了顶管中精密导向问题.本项技术应用于上海市过黄浦江顶管工程,效果显著.

     
    << 更多相关文摘    
    图标索引 相关查询

     


     
    CNKI小工具
    在英文学术搜索中查有关导线控制的内容
    在知识搜索中查有关导线控制的内容
    在数字搜索中查有关导线控制的内容
    在概念知识元中查有关导线控制的内容
    在学术趋势中查有关导线控制的内容
     
     

    CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
    版权图标  2008 CNKI-中国知网
    京ICP证040431号 互联网出版许可证 新出网证(京)字008号
    北京市公安局海淀分局 备案号:110 1081725
    版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社